test(ms-ai-architect): playground v3 markdown fixtures (17 commands) [skip-docs]
Synthetic markdown fixtures for the 17 report-producing commands per the canonical archetype-routing-tabell. Each fixture uses the consistent ANPR-trafikkanalyse system from brief example to produce parser-input that exercises every archetype path (aiact, requirements-list, text-document, fria, conformity-checklist, matrix-risk 5x5, matrix-risk-6x5, findings, cost-distribution, capability, phased-plan, markdown, verdict, comparison). Real /architect:<command> capture deferred to incremental work; synthetic fixtures suffice as parser test input for Steps 11-12.
This commit is contained in:
parent
3750bee48b
commit
b4a5ff0c75
17 changed files with 744 additions and 0 deletions
53
plugins/ms-ai-architect/playground/test-fixtures/ros.md
Normal file
53
plugins/ms-ai-architect/playground/test-fixtures/ros.md
Normal file
|
|
@ -0,0 +1,53 @@
|
|||
# ROS-analyse — ANPR-trafikkanalyse
|
||||
|
||||
System: ANPR-trafikkanalyse (Statens vegvesen)
|
||||
Metodikk: NS 5814 / ISO 31000 + AI-trusselbibliotek
|
||||
|
||||
## Risikomatrise (5×5)
|
||||
|
||||
| Trussel | Sannsynlighet | Konsekvens | Score | Nivå |
|
||||
|---------|---------------|------------|-------|------|
|
||||
| Modell-drift som degraderer nøyaktighet | 4 | 3 | 12 | medium |
|
||||
| Treningsdata-bias mot småbiler eller MC | 3 | 3 | 9 | medium |
|
||||
| Adversarielle plate-design unngår OCR | 2 | 4 | 8 | medium |
|
||||
| API-utilgjengelighet i kritisk periode | 2 | 4 | 8 | medium |
|
||||
| Klage-saksbehandling overbelastet ved skalering | 4 | 3 | 12 | medium |
|
||||
| Datatap pga manglende georedundans | 1 | 5 | 5 | low |
|
||||
| Misbruk av AI-forklaring som bevis | 3 | 4 | 12 | medium |
|
||||
| Kjedevirkning ved feil i kjøretøyregister | 2 | 5 | 10 | medium |
|
||||
|
||||
## Radar-akser (7 dimensjoner)
|
||||
|
||||
| Akse | Score (1-5) |
|
||||
|------|-------------|
|
||||
| Tilgjengelighet | 4 |
|
||||
| Konfidensialitet | 4 |
|
||||
| Integritet | 4 |
|
||||
| Sporbarhet | 5 |
|
||||
| Pålitelighet | 3 |
|
||||
| Robusthet | 3 |
|
||||
| Etterlevelse | 4 |
|
||||
|
||||
## Trusler
|
||||
|
||||
| ID | Beskrivelse | Severity | Tiltak |
|
||||
|----|-------------|----------|--------|
|
||||
| T-101 | Modell-drift over tid | high | Månedlig retraining-pipeline; alarm ved >2% nøyaktighetsfall |
|
||||
| T-102 | Bias mot småbiler/MC | high | Stratifisert evaluering ved hver release |
|
||||
| T-103 | Adversarielle plate-design | medium | Robusthetstest mot kjente angreps-mønstre |
|
||||
| T-104 | API-utilgjengelighet | medium | Multi-region failover med RTO 1t |
|
||||
| T-105 | Saksbehandlings-overbelastning | high | Automatisk batching + prioriteringsregler |
|
||||
|
||||
## Tiltak
|
||||
|
||||
| ID | Tiltak | Status | Eier |
|
||||
|----|--------|--------|------|
|
||||
| M-101 | Retraining-pipeline etablert | done | MLOps |
|
||||
| M-102 | Stratifisert evalueringssett bygget | in-progress | Data Scientist |
|
||||
| M-103 | Robusthetstest planlagt | planned | Sikkerhetsarkitekt |
|
||||
| M-104 | Multi-region failover testet | done | Drift |
|
||||
| M-105 | Batching-logikk implementert | in-progress | Tech Lead |
|
||||
|
||||
## Konklusjon
|
||||
|
||||
Restrisiko etter tiltak: medium. ROS godkjent av seksjonsleder 2026-04-25.
|
||||
Loading…
Add table
Add a link
Reference in a new issue