# config-audit v5.0.0 — Implementation Log Per-session record of what was done, what was deferred, and what failed. Written at the end of each session. State for the next session lives in `NEXT-SESSION-PROMPT.local.md` (gitignored). --- ## Planning session (2026-05-01) **Outcome:** Plan ready for execution. **Completed:** - Read `v5-brief.md` (drafted 2026-04-19) - Brief reviewer ran — 5 findings requiring user input - User decisions captured: - N7 (cache-hit-digest) dropped from v5.0.0 — moved to post-release - N5 (live tokenizer) moved into v5.0.0 with warn-and-fallback - M3 merged into N6 (single collision scanner) - M1 manifest-fallback approach approved (cache → package.json → "tool count unknown" finding) - SC-6 split to 6a/6b - SC-10 replaced with per-feature coverage requirement - N1 backward-compat for `CA-TOK-*` glob suppression flagged in CHANGELOG - Brief revised with "Avklaringer fra konsultasjon 2026-05-01" section (authoritative) - Exploration: 7 parallel agents (architecture, task-finder, dependency-tracer, risk-assessor, test-strategist, git-historian, convention-scanner) - Plan written: `docs/v5-plan.md` — 31 steps in 5 sessions - Adversarial review: plan-critic verdict REPLAN (Grade C, 5 blockers + 8 majors); scope-guardian MIXED (4 gaps) - Plan revised to address all 5 blockers + 8 majors + 4 scope-gaps; new score B+ (84/100) **Open assumptions** (carry into execution): 1. Anthropic `count_tokens` endpoint accepts plain-text payload, returns `{input_tokens: number}` (Step 26) 2. MCP servers expose tool count via `tools/list` or `package.json` `tools` field (Steps 14, 18) 3. `readActiveConfig` performant enough for TOK at scale (Step 6) 4. Cross-plugin namespace model — to be verified by Step 22a research spike before Step 22b 5. `baseline-all-a` fixture is genuinely info-only after F3 — Step 3 audit verifies **Next session:** Session 1 — alpha.1 (F1-F5 + reference cleanup). See `NEXT-SESSION-PROMPT.local.md`. --- ## Session 1 — alpha.1 (TBD) *Start when ready. Replace this stub with actual log at session end.* **Steps planned:** 1-9 (incl. 8b) **Branch strategy:** direct-to-main (Forgejo, pre-authorized). --- ## Session 2 — alpha.2 (TBD) *Steps 10-17.* --- ## Session 3 — beta.1 (TBD) *Steps 18, 19, 20, 21, 22a, 22b, 23.* --- ## Session 4 — rc.1 (TBD) *Steps 24-27.* --- ## Session 5 — release (TBD) *Steps 28-30, including SC-6b release gate.*