# Execution order — the full roadmap, sequenced Status: approved sequencing across all remaining phases. This doc is the connective tissue between the per-phase plans; it owns the *order and the reasons*, not the phase detail. Each phase's detail and verification live in its own doc: - `docs/plan/phase-1-door-a.md` — DONE, shipped at v0.3.2. - `docs/plan/phase-2-doors-b-c.md` - `docs/plan/phase-3-configurable-contract.md` - `docs/plan/okf-v0.2-alignment.md` — a policy track, not a phase; slots between Phases 3 and 4 for the reason given below. - `docs/plan/phase-4-node-half.md` Headline order: **Stage 0 (guard gate) → Phase 2 → Phase 3 → OKF v0.2 alignment decisions → Phase 4 code**, with Phase 2 split guard-independent-first and Phase 4's *coordination* started in parallel from the beginning. The quality argument for this order is below — it is not merely the roadmap numbering. ## Stage 0 — Guard readiness (gate; do first, cheap) Before any Phase 2 code, confirm `llm-ingestion-guard` 0.2 exists with the pinned surface (`prepare_input`, `screen_output`, `okf.import_bundle`, disposition enum) and is installable in CI. This is Phase 2's assumptions B1+B2; B2 is explicitly "not yet decided", and the guard is a separate repo (`open/llm-ingestion-pipeline-security`), so its readiness is partly outside this repo's control. Why first: it is the single biggest unknown, it is cheap to check (read the guard repo), and its answer decides the *shape* of Phase 2 — run straight through, or front-load the guard-independent half while readiness is confirmed in parallel. Do not build a bearing dependency into the plan on an unverified foundation. If the surface has drifted from what the plan assumes, the whole persist-gate design must know now, not at the integration step. Outcome recorded in STATE before Phase 2 code starts. ### Stage 0 revisited — measuring guard 0.3.1 before widening the pin The pin held is `>=0.2,<0.3`, which can only ever resolve `v0.2.0`. The guard repo gates its own 1.0 on our fixture suite being measured against `v0.3.1`, so this measurement is owed outward and is that repo's only named blocker. Order is *measure first, widen after*: widening the range before measuring would ship a window admitting a version the fixtures never ran against. Procedure — do not vary it, each step exists because of a specific failure mode: 1. Scratch venv **outside** `.venv`: install the package `--no-deps`, then the guard from the `v0.3.1` tag. Do not touch `pyproject.toml`. 2. **Assert the resolved version** via `importlib.metadata` *before* running anything, and carry it in the reported result. An unmodified tree resolves `0.2.0` and runs green — a true claim about 0.2.0 published under a heading that says 0.3.1. This step is what makes the result honest. 3. Run `tests/test_guard_adapter.py` (19 tests, real scanner) and the full suite. Watch percent-escapes specifically: the slugger builds filenames from titles, and the guard has recorded that as its most likely false positive. Report raw URLs, not counts. 4. **Send the result whichever way it goes**, and state explicitly that 19 fixture tests are not a corpus — their gate is "does 0.3.1 change our verdicts", not "how often does the false positive fire". 5. Green → one release: `>=0.2,<0.4`, uv tag `v0.3.1`, CLAUDE.md and README updated together. Red → no bump, and the finding goes back to the guard. Until this lands, consumers of v0.4.0 resolve guard 0.2.0 (`pyproject.toml:25`). That is a silent under-defend: no build fails, so nothing surfaces it. The release in step 5 is what closes it. ## Phase 2 — Doors B/C (split: guard-independent first) Internal order follows the phase-2 doc's TDD steps, deliberately: 1. **Guard-independent half (steps 1–2):** extraction registry (stdlib core types, fail-fast on unknown extension and on `[extract]` types without the extra) + provenance rendering and filename slugging (pure functions). Zero external dependency, maximal test-determinism, reuses the Phase 1 renderer. Highest-quality-yield work to start with; validates B3 (`html.parser` adequacy) early while it is cheap to change. 2. **Guard seam (steps 3–5):** Door B against a *stub* guard first (nail the disposition control flow deterministically), then integration with the *real* guard, then Door C. Stub-first means that when the real-guard integration test is the only thing that can newly fail, a failure isolates cleanly to the integration boundary. Door B before Door C: C reuses B's guard-gate pattern and both reuse Phase 1 primitives. This is where `pyproject` runtime deps become exactly the guard pin — a semver-worthy event (propose 0.4.0), its own CHANGELOG entry. ## Phase 3 — Configurable bundle contract (only after 2) Extract configurability only once Door A **and** Door B/C both concretely use the type/layer/frontmatter/reserved-file constants. Phase 3 abstracts a pattern; you need ≥2 real consumers before the right seams are visible. Building the config object first would be speculative abstraction — an explicit anti-pattern. The proving consumer (`claude-code-llm-wiki`, `strict-v1`) is the concrete second profile that proves the abstraction is not single-use. The 2→3 boundary has no painful retrofit: Phase 2 already leaves the seam open — Door C v1 deliberately does NOT persist the guard log "because reserved-file policy differs per consumer and becomes configurable in Phase 3." This is where the contract becomes explicit and frozen — the precondition for a clean Node port. ## OKF v0.2 alignment — decisions between 3 and 4, code possibly later Everything through Phase 3 targets OKF v0.1. Upstream published v0.2 on 2026-07-25. Detail and open questions: `docs/plan/okf-v0.2-alignment.md`. **Why the decisions must land before Phase 4 code, even if the code does not.** Phase 4 ports a *frozen, explicit* contract and uses the shared fixture suite as the cross-runtime conformance oracle. Freezing that contract while its relation to upstream v0.2 is undecided means freezing a v0.1 shape into two runtimes instead of one, and the fixture suite would then certify the drift rather than catch it. The expensive version of this mistake is discovered after the Node half exists; the cheap version is a decision recorded now. **Why it is not a phase.** v0.2's breaking surface is two supersessions, both with documented consumer fallbacks, and every new field is optional. The only measured shape problem is `DEFAULT`'s `generated` marker, which lives in commons' ingest-spec §5 layer and is therefore not this repo's to change. So the work is mostly *deciding and routing*, expressed through the Phase 3 profile object — not a new implementation stage. **Order inside the track.** Characterization and audit first (they add tests and change no behavior, so they are safe while the central question is still open), then the one blocking dependency — commons' answer on `generated` — and only then any migration, as its own release. ## Phase 4 — Node half (two clocks) **Coordination clock — start early, parallel to Stages 0–3, but only the shape-independent agreements.** Phase 4's hard preconditions are agreements, not code: okr's reference-impl lift *in principle*, catalog as re-pin owner, guard-as-contract at the Node persist seam, and the linkedin-studio non-normalization carve-out can all be initiated early — via coord — so they are settled when code starts. The one agreement that must WAIT is the exact second-brain *contract shape*: the phase-4 doc ties the catalog-spec expressiveness check to Phase 3's split-table step, so do not freeze the cross-runtime contract before Phase 3 has proven the profile can express it. **Code clock — last.** The Node/ESM implementation ports a *frozen, explicit* contract (Phase 3's output) and uses the shared fixture suite as the cross-runtime conformance oracle. Porting before the contract is frozen means chasing a moving target and guaranteed drift between halves. Halves share contract and fixtures, never code. ## Quality spine (holds across every stage) - TDD iron law throughout: no production code without a failing test first. - The golden/fixture suite is the backbone — every phase extends it; it is the regression oracle and, in Phase 4, the cross-runtime conformance oracle. It never goes non-byte-exact. - Determinism invariant every phase (explicit `ingested_at`, LF-only, byte-exact). Phase 2 adds: the guard *version* is part of the input surface — pin it. - Boundary grep-gate green every phase: `grep -rn "sanitize\|quarantine\|lexicon" src/` empty (guard imports only). - One phase = one release with a CHANGELOG entry; the guard dependency landing in Phase 2 is the architectural milestone. ## Verification — the gate between each handoff These are the objective checks that a stage is done and the next may begin: 1. **Enter Phase 2:** guard readiness recorded in STATE — either "0.2 API matches + installable in CI" or an explicit "front-load guard-independent half; guard integration blocked on ". 2. **Phase 2 → Phase 3:** Phase 1 golden suite still byte-for-byte; `pyproject` runtime deps == exactly `llm-ingestion-guard>=0.2,<0.3`; persist-gate proof test green (a fail-secure fixture yields zero new files). 3. **Phase 3 → Phase 4:** golden suite byte-identical under `DEFAULT` (`git diff --stat examples/` empty for the phase); `STRICT_V1` cross-profile rejection tests pass both directions; split-table artifact under `docs/` reviewed with the operator (contract is frozen and expressive enough for the second-brain spec). 4. **Phase 4 code start:** each shape-independent coordination step has a recorded sign-off; the contract-shape agreement is signed off *after* the Phase 3 split-table, not before; and the OKF v0.2 open questions V1–V5 are each answered or explicitly deferred *in writing*, so the frozen contract states its relation to upstream on purpose rather than by omission. 5. **Throughout:** `mypy --strict src/`, `ruff check .`, `ruff format --check .` clean; boundary grep-gate empty.