Sequences the remaining roadmap (Stage 0 guard gate -> Phase 2 -> Phase 3 -> Phase 4) with the quality rationale for the order: guard readiness verified before any Phase 2 code, Phase 2 split guard-independent-first, Phase 3's configurability extracted only after two concrete consumers exist, Phase 4 code last on a frozen contract with its coordination started early. Connective tissue over the four per-phase plans; owns the order and reasons, not the phase detail. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01HBbjgS5A55RVavoyjJC4FX |
||
|---|---|---|
| .. | ||
| execution-order.md | ||
| phase-1-door-a.md | ||
| phase-2-doors-b-c.md | ||
| phase-3-configurable-contract.md | ||
| phase-4-node-half.md | ||