The plan's own line said steps 1-3 change no behavior. V-A7's construction gate made that untrue, and a stale premise in a plan is the class of thing this repo has already paid for twice. Recorded where it was wrong, with the operator decision that put the gate before D2 rather than at it, and with Door C's six tolerance cases measured rather than expected. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01A2aKJxLejT9S8jYwoZ9fut |
||
|---|---|---|
| .. | ||
| execution-order.md | ||
| okf-v0.2-alignment.md | ||
| phase-1-door-a.md | ||
| phase-2-doors-b-c.md | ||
| phase-3-configurable-contract.md | ||
| phase-4-node-half.md | ||