llm-ingestion-okf/docs/plan
Kjell Tore Guttormsen c85347e8a5 docs(okf-v0.2): steps 1-3 are done, and step 3 was not behavior-neutral
The plan's own line said steps 1-3 change no behavior. V-A7's construction gate
made that untrue, and a stale premise in a plan is the class of thing this repo
has already paid for twice. Recorded where it was wrong, with the operator
decision that put the gate before D2 rather than at it, and with Door C's six
tolerance cases measured rather than expected.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01A2aKJxLejT9S8jYwoZ9fut
2026-07-26 20:10:37 +02:00
..
execution-order.md docs(okf-v0.2): requirement 1 re-sized -- the emitter does not change at all 2026-07-26 19:57:29 +02:00
okf-v0.2-alignment.md docs(okf-v0.2): steps 1-3 are done, and step 3 was not behavior-neutral 2026-07-26 20:10:37 +02:00
phase-1-door-a.md docs(plan): add detailed phase 1-4 implementation plans 2026-07-16 10:58:08 +02:00
phase-2-doors-b-c.md feat(guard): wire Doors B and C to the real guard (Phase 2 step 4) 2026-07-25 07:32:45 +02:00
phase-3-configurable-contract.md docs(okf-v0.2): the alignment track lands before the contract freezes 2026-07-26 11:42:37 +02:00
phase-4-node-half.md docs(phase-4): record linkedin-studio's two named requirements before the freeze 2026-07-25 20:34:54 +02:00