The "D7-status i dag" column was measured in Steg 0 on 2026-07-16 and never
updated. Twelve build sessions have landed since, so twelve rows still read
"MANGLER" for capabilities that now exist — a later session reading the column
as current would rebuild something already built.
The note names each landed row with its commit (verified against git, not
against STATE's claim), and points at git history + STATE.md as the ground
truth for what exists today. The MAF column and the gate statuses are NOT
stale and remain valid planning input; only the D7 column is pinned to its
measurement date.
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01MQu2xxwedckjU56byu1aUG