feat(p17b): a context set that spans TWO bases, and a judge told which one [skip-docs]
``contexts/dekke-og-kontrakt-lindaas-2027`` is the first set whose approaches route at more than one knowledge base: a1/a2 at n200-2024 (material requirements) and a3/a4 at r761-2025 (the rig, and the falsification arm). That is the whole reason it exists -- P17b measures that ONE commission can be run across several. ``bundle.txt`` grows a block per base; a set naming one base is one block, so the four pre-P17b files parse byte-identically. The reader now has ONE home (``stress.read_bundle_declarations``): it used to be a private copy in the P14 gate and a second, looser one inside ``stress.main``, and the multi-base form is exactly the change that would have let them drift. Rule U becomes the UNION of every declared base, and that is not a formality. MEASURED 15.09: ``enhetspris`` is absent from n200-2024 and carried by 70 of r761-2025's 2 756 concepts, so anchors admitted per base would have admitted a question the pass as a whole CAN ground. It was dropped from the fifth set's anchors for that reason. ``score_context_set(bundle_id=...)`` restricts the judgement to the approaches routed at THIS base. Without it, judging the n200 outbox reports the r761 approach as ``not_evaluated``/``absent`` -- a false finding, because that approach WAS evaluated, against the other base, under the other run_id. That defect is pinned by its own arm. The judge's CLI refuses to guess when a set declares several bases, with an rc-0 control on ``--bundle``. Arm (d) gained a second half: every DECLARED base must be named by some approach, because a base no approach names is never run. The P19/B2 fasit denominator moved 26 -> 32 and is asserted, not dropped: six new references, two of them bare ``prosessnr`` (12.11, 12.12), so B1's punctuation-and-digits form is now exercised by a fasit and not only by a known-positive. Suite 1774/5, golden byte-unchanged. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
This commit is contained in:
parent
5e4c497a84
commit
da0ccd0489
8 changed files with 496 additions and 57 deletions
4
contexts/dekke-og-kontrakt-lindaas-2027/bundle.txt
Normal file
4
contexts/dekke-og-kontrakt-lindaas-2027/bundle.txt
Normal file
|
|
@ -0,0 +1,4 @@
|
|||
name: n200-2024
|
||||
bundle_id: vegnormal-n200-2024
|
||||
name: r761-2025
|
||||
bundle_id: vegnormal-r761-2025
|
||||
7
contexts/dekke-og-kontrakt-lindaas-2027/docs/README.md
Normal file
7
contexts/dekke-og-kontrakt-lindaas-2027/docs/README.md
Normal file
|
|
@ -0,0 +1,7 @@
|
|||
# Prosjektdokumenter
|
||||
|
||||
TOM med vilje. Scenarioet er MS Office + PDF, men ingen av dem kan mates
|
||||
inn her: `--docs-dir`-omveien er fraradet (P13 - den omgar stigen `list_bundles -> read_bundle
|
||||
-> read_dir -> read_file` og de to gatene, §4.1a-dimensjonen og verdict-laget). Veien et ekte
|
||||
prosjektdokument skal ta er gjennom okf-ingest inn i en kunnskapsbase, altsa en base til - ikke
|
||||
en katalog ved siden av. Se `docs/2026-09-12-p14-kontekstsett.md` § 1.4.
|
||||
68
contexts/dekke-og-kontrakt-lindaas-2027/fasit.json
Normal file
68
contexts/dekke-og-kontrakt-lindaas-2027/fasit.json
Normal file
|
|
@ -0,0 +1,68 @@
|
|||
{
|
||||
"project_id": "dekke-og-kontrakt-lindaas-2027",
|
||||
"must_cite": [
|
||||
{
|
||||
"approach_id": "a1-tynnere-forsterkningslag",
|
||||
"rationale": "Overbygningen er prosjektert med full forsterkningslagstykkelse over hele strekningen. Et riktig svar må gjengi hva N200 krever av forsterkningslag før tykkelsen kan reduseres.",
|
||||
"concepts": [
|
||||
{
|
||||
"path": "krav/N200/id-13c94f7a-2d24-48a1-b258-db66cb2392d7.md",
|
||||
"title": "Krav 3.3.3—1 Forsterkningslag",
|
||||
"ref": "Krav 3.3.3—1"
|
||||
},
|
||||
{
|
||||
"path": "krav/N200/id-222bca41-dff8-4b54-fb28-88da74969c9c.md",
|
||||
"title": "Krav 4.6—1 Forsterkningslag",
|
||||
"ref": "Krav 4.6—1"
|
||||
}
|
||||
]
|
||||
},
|
||||
{
|
||||
"approach_id": "a2-filterlag-sprengstein",
|
||||
"rationale": "Filterlaget er prosjektert med innkjøpt sortert materiale. Et riktig svar må gjengi hva N200 krever av filterlag før stedlig sprengstein kan vurderes.",
|
||||
"concepts": [
|
||||
{
|
||||
"path": "krav/N200/id-6d7520d6-d224-4e49-f7ba-22863b49cf92.md",
|
||||
"title": "Krav 4.3—1 Filterlag",
|
||||
"ref": "Krav 4.3—1"
|
||||
},
|
||||
{
|
||||
"path": "krav/N200/id-4f1ff497-68a0-4953-c946-3bdf49e16516.md",
|
||||
"title": "Krav 4.3—5 Filterlag",
|
||||
"ref": "Krav 4.3—5"
|
||||
}
|
||||
]
|
||||
},
|
||||
{
|
||||
"approach_id": "a3-riggomfang",
|
||||
"rationale": "Riggen er priset som en frittstående etablering. Et riktig svar må gjengi hva R761 Prosesskoden legger i tilrigging og i drift av rigg, slik at et delt omfang kan beskrives uten at noe faller mellom to prosesser.",
|
||||
"concepts": [
|
||||
{
|
||||
"path": "R761/12-11/_1_id-377d3c43-eb37-4337-a476-0818a6a30490.md",
|
||||
"title": "Tilrigging",
|
||||
"ref": "12.11"
|
||||
},
|
||||
{
|
||||
"path": "R761/12-12/_1_id-0d8e750e-18b1-49b9-b838-f5c29f21ff29.md",
|
||||
"title": "Drift av rigg og midlertidige bygninger",
|
||||
"ref": "12.12"
|
||||
}
|
||||
]
|
||||
}
|
||||
],
|
||||
"honesty": "Prosjektet fv. 218 Lindaas er KONSTRUERT av meg: vegnummer, lengde, AADT og alle fire kostlinjene (LIND-FORST-01, LIND-FILT-01, LIND-RIGG-01, LIND-INDEKS-01) er oppdiktet, og beloepene er satte stoerrelsesordener. Kravene og prosessene i must_cite er lest ordrett ut av basenes egen frontmatter (n200-2024 for a1/a2, r761-2025 for a3). Verken N200 eller R761 baerer priser, saa kodene finnes ikke i noen av basene. Dette er det FOERSTE settet som spenner TO baser: a1/a2 rutes mot n200-2024 og a3/a4 mot r761-2025, og det er hele grunnen til at settet finnes -- P17b maaler at EN kommisjon kan kjoeres over flere kunnskapsbaser. Den fjerde tilnaermingen a4-indeksregulering og dens kostkode LIND-INDEKS-01 er ogsaa KONSTRUERT, og med vilje: den er falsifiseringsarmen, en kostlinje INGEN av de to basene baerer grunnlaget for. MAALT 15.09: 'enhetspris' ble FORKASTET som anker fordi r761-2025 baerer ordet i 70 av 2 756 konsepter -- et anker som holder for ett sett med EN base holder ikke noedvendigvis for et sett med to.",
|
||||
"must_refuse": [
|
||||
{
|
||||
"approach_id": "a4-indeksregulering",
|
||||
"anchors": [
|
||||
"indeksregulering",
|
||||
"konsumprisindeks",
|
||||
"markedspris",
|
||||
"tonnpris",
|
||||
"kalkyle",
|
||||
"prisstigning"
|
||||
],
|
||||
"rationale": "N200 beskriver materialkrav og R761 Prosesskoden beskriver hva en prosess omfatter -- ingen av dem regulerer priser. Verken indeksregulering, konsumprisindeks, markedspris, tonnpris, kalkyle eller prisstigning finnes i noen av de to basene. Spoersmaalene denne approachen staar for: Hvilken indeks skal kontraktssummen reguleres etter? | Hva er markedsprisen paa sprengstein i dette omraadet? | Hvilken prisstigning er lagt til grunn i kalkylen?"
|
||||
}
|
||||
]
|
||||
}
|
||||
46
contexts/dekke-og-kontrakt-lindaas-2027/mandate.json
Normal file
46
contexts/dekke-og-kontrakt-lindaas-2027/mandate.json
Normal file
|
|
@ -0,0 +1,46 @@
|
|||
{
|
||||
"objective": "Kutt kostnad i vegprosjektet fv. 218 Lindås (4,1 km, ÅDT 2 100) uten å bryte et eneste materialkrav i N200 eller å beskrive riggen annerledes enn R761 Prosesskoden gjør.",
|
||||
"success_criteria": "Minst én tilnærming validerer, og hver validerte tilnærming peker på kravet eller prosessen i SIN EGEN base som faktisk binder den — materialkravene i N200, riggomfanget i R761.",
|
||||
"approaches": [
|
||||
{
|
||||
"id": "a1-tynnere-forsterkningslag",
|
||||
"label": "Tynnere forsterkningslag på strekningen med fast fjell",
|
||||
"description": "Overbygningen er prosjektert med full forsterkningslagstykkelse over hele strekningen, også der undergrunnen er fast fjell. Vi vil vite hva N200 faktisk krever av forsterkningslag.",
|
||||
"affected_codes": [
|
||||
"LIND-FORST-01"
|
||||
],
|
||||
"claimed_saving_nok": 2100000.0,
|
||||
"bundle_id": "vegnormal-n200-2024"
|
||||
},
|
||||
{
|
||||
"id": "a2-filterlag-sprengstein",
|
||||
"label": "Filterlag av stedlig sprengstein i stedet for innkjøpt materiale",
|
||||
"description": "Filterlaget er prosjektert med innkjøpt sortert materiale. Spørsmålet er hvilke krav N200 stiller til filterlag, og om stedlig sprengstein kan tilfredsstille dem.",
|
||||
"affected_codes": [
|
||||
"LIND-FILT-01"
|
||||
],
|
||||
"claimed_saving_nok": 1350000.0,
|
||||
"bundle_id": "vegnormal-n200-2024"
|
||||
},
|
||||
{
|
||||
"id": "a3-riggomfang",
|
||||
"label": "Redusert riggomfang: felles rigg med naboentreprisen",
|
||||
"description": "Riggen er priset som en frittstående etablering. Vi vil vite hva R761 Prosesskoden legger i tilrigging og drift av rigg, slik at omfanget kan deles med naboentreprisen uten at noe faller mellom to prosesser.",
|
||||
"affected_codes": [
|
||||
"LIND-RIGG-01"
|
||||
],
|
||||
"claimed_saving_nok": 1750000.0,
|
||||
"bundle_id": "vegnormal-r761-2025"
|
||||
},
|
||||
{
|
||||
"id": "a4-indeksregulering",
|
||||
"label": "Lavere indeksregulering av kontraktssummen",
|
||||
"description": "Vi vil kutte ved å legge en lavere indeksregulering og en lavere markedspris til grunn for kontraktssummen.",
|
||||
"affected_codes": [
|
||||
"LIND-INDEKS-01"
|
||||
],
|
||||
"claimed_saving_nok": 900000.0,
|
||||
"bundle_id": "vegnormal-r761-2025"
|
||||
}
|
||||
]
|
||||
}
|
||||
Loading…
Add table
Add a link
Reference in a new issue