portfolio-optimiser/.claude/projects
Kjell Tore Guttormsen 497399e0aa docs(fase3): /trekplan — implementation plan (8 steps; plan-critic APPROVE_WITH_NOTES + scope-guardian ALIGNED) [skip-docs]
8-step TDD plan composing run_project into a sequential run_portfolio orchestrator.
3 authorized one-time core seams (meter=, config docs_dir + verdict_input); load-bearing
SC3 meter-detach guard + SC4 overlap-ranking; SC7 resolve_model teeth. Both majors from
plan-critic (SC4 fixture magnitudes; Step 3/4 coupling) folded in via the REPLIES table.
gemini Pass 2 unavailable (Gemini-API deprecation, operator-side tooling).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_019any9zfGNNwWJPX5Zq2QRz
2026-06-26 11:41:58 +02:00
..
2026-06-23-fase1-derisk-spikes docs(fase1): trekreview round-2 ALLOW — Fase 1 formally closed [skip-docs] 2026-06-24 11:15:41 +02:00
2026-06-24-fase2-mvp-vertical-slice docs(fase2): trekreview review.md — verdict ALLOW (0 funn), Fase 2 LUKKET 2026-06-26 10:03:38 +02:00
2026-06-26-fase3-portfolio-fanout docs(fase3): /trekplan — implementation plan (8 steps; plan-critic APPROVE_WITH_NOTES + scope-guardian ALIGNED) [skip-docs] 2026-06-26 11:41:58 +02:00