8-step TDD plan composing run_project into a sequential run_portfolio orchestrator. 3 authorized one-time core seams (meter=, config docs_dir + verdict_input); load-bearing SC3 meter-detach guard + SC4 overlap-ranking; SC7 resolve_model teeth. Both majors from plan-critic (SC4 fixture magnitudes; Step 3/4 coupling) folded in via the REPLIES table. gemini Pass 2 unavailable (Gemini-API deprecation, operator-side tooling). Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_019any9zfGNNwWJPX5Zq2QRz |
||
|---|---|---|
| .. | ||
| 2026-06-23-fase1-derisk-spikes | ||
| 2026-06-24-fase2-mvp-vertical-slice | ||
| 2026-06-26-fase3-portfolio-fanout | ||