portfolio-optimiser/contexts/gate-nordvik-2027/fasit.json
Kjell Tore Guttormsen f21007c858 feat(p16): the stress judge -- and the order's own (a) was a gate that could only be green
Session 102's criterion ((a) built on the right fasit concept OR refused anchored, (b') names it,
(c) zero hallucinations) was adjudicated BY HAND. Measured 14.09: nothing in the tree read
contexts/<set>/fasit.json against an outbox at all, so "provable against the base" had no
repeatable form. portfolio_optimiser.stress reads ONLY artefacts that already exist -- the
per-approach proposal/outcome pair and {run_id}-debate.json -- so no run gains a field.

MEASURED BEFORE BUILDING: the order defines grounded as "OPENED or CITED", but on the S2c path
run_project stamps citations = bundle_citations(bundle), one per context file. On n100-2023 that
is 446 citations over 446 concepts, and 6 of 6 fasit paths are already "cited" before a single
model call. Honouring it literally would be the repo's own vacuous-gate class inside the gate
built to catch it, so a citation grounds an approach only under a NARROWED list (a declared
pre-pass cut); both halves are reported either way. (b') was checked for the same vacuity and is
clean -- snippets are bodies, ref/title live in frontmatter (0 of 446 n100 bodies carry
"Krav 4.1.2-1") -- so the order's definition stands.

A2: unanswerable questions had no runnable form (po is not a lookup tool), so they become a FOURTH
commissioned approach per set whose cost line the base carries no ground for, and fasit.json
carries must_refuse INSTEAD of unanswerable -- one form, never two copies of one fact. Rule U is
untouched and its known-positive is still red.

Load-bearing MEASURED (20 arms), eleven mutations all red on their own arm, green control 1663/5
(from 1643/5, superset, 0 removed), golden demo-transcript.stdout BYTE-UNCHANGED
(shasum -a 1 of the CONTENT = ea8c534773acdbe41ae68f2c55724d69aaf8be4f).

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-14 11:58:48 +02:00

70 lines
3.2 KiB
JSON

{
"project_id": "gate-nordvik-2027",
"bundle": "n100-2023",
"bundle_id": "vegnormal-n100-2023",
"must_cite": [
{
"approach_id": "a1-rundkjoring-forenklet",
"rationale": "Krysset er prosjektert signalregulert. Vi vil vite hvilke krav N100 stiller til rundkjøring før vi kan regne på et bytte.",
"concepts": [
{
"path": "krav/N100/id-a97dabc7-d35a-4e51-c1b9-5fcdf64ac96d.md",
"title": "Krav 4.1.2—1 Rundkjøringer",
"ref": "Krav 4.1.2—1"
},
{
"path": "krav/N100/id-8df9cff1-d7af-4313-df59-c6dee4271831.md",
"title": "Krav 4.1.2—2 Rundkjøringer",
"ref": "Krav 4.1.2—2"
}
]
},
{
"approach_id": "a2-gangfelt-antall",
"rationale": "Seks opphøyde gangfelt er prosjektert. Spørsmålet er hva N100 krever av kryssingspunkter for gående på en gate med denne fartsgrensen.",
"concepts": [
{
"path": "krav/N100/id-2ffbe00a-3275-4653-f248-47c15159ac0e.md",
"title": "Krav 4.2.5.1—1 Gangfelt og tilrettelagte kryssingspunkter",
"ref": "Krav 4.2.5.1—1"
},
{
"path": "krav/N100/id-92533134-32fd-4547-91e6-1f60bd75e9e7.md",
"title": "Krav 4.2.5.1—2 Gangfelt og tilrettelagte kryssingspunkter",
"ref": "Krav 4.2.5.1—2"
}
]
},
{
"approach_id": "a3-trafikkoy-utforming",
"rationale": "Trafikkøyene er prosjektert i full bredde i alle armer. Vi vil vite hva N100 faktisk krever.",
"concepts": [
{
"path": "krav/N100/id-b0586596-18e9-4d4c-a843-ea6018fcad3d.md",
"title": "Krav 4.1.2.4—1 Trafikkøy i rundkjøringsarmer",
"ref": "Krav 4.1.2.4—1"
},
{
"path": "krav/N100/id-a8df58ed-d301-439b-f6b6-675e6f091455.md",
"title": "Krav 4.1.2.4—2 Trafikkøy i rundkjøringsarmer",
"ref": "Krav 4.1.2.4—2"
}
]
}
],
"honesty": "Prosjektet Nordvikgata er KONSTRUERT av meg: gatenavn, lengde, fartsgrense og alle tre kostlinjene (GATE-KRYSS-01, GATE-GANG-01, GATE-KRYSS-02) er oppdiktet, og beløpene er satte størrelsesordener. Kravene i must_cite er derimot lest ordrett ut av n100-2023-basens egen frontmatter. N100 bærer ingen priser, så kodene finnes ikke i basen. P16: den fjerde tilnaermingen a4-enhetspris-gangfelt og dens kostkode GATE-GANG-ENHET er ogsaa KONSTRUERT, og med vilje: den er falsifiseringsarmen, en kostlinje basen ikke baerer grunnlaget for. Beloepet er en satt stoerrelsesorden.",
"must_refuse": [
{
"approach_id": "a4-enhetspris-gangfelt",
"anchors": [
"budsjett",
"enhetspris",
"indeksregulering",
"investeringsramme",
"kostnadsestimat",
"prisstigning"
],
"rationale": "N100 er en vegnormal og baerer ingen priser. Ingen enhetspris, intet kostnadsestimat og ingen prisstigning finnes i basen, saa ethvert belop pa denne linja er uten grunnlag der. Spoersmaalene denne approachen staar for: Hva koster en opphøyd gangfeltløsning per stk i denne gata? | Hvilken prisstigning skal legges inn fra prosjektering til utførelse? | Hva er den samlede investeringsrammen for Nordvikgata?"
}
]
}