docs: name two retired repositories neutrally in the debt measurement

The 2026-09-03 coordination-debt measurement named two repositories that
no longer exist, in its table and in the cutoff reconstruction. They now
read "retired repository A" and "retired repository B"; every count,
timestamp and the 7 + 4 = 11 reconstruction are unchanged.

CHANGELOG 0.36.1 widened to match, so its text stays true.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
Kjell Tore Guttormsen 2026-09-23 15:43:40 +02:00
commit 6c9b17277c
Signed by: ktg
SSH key fingerprint: SHA256:JakMjO6FTBBzN0Bhfj9saOoEjaFxlSdYuZQQpM/lF9Q
2 changed files with 9 additions and 7 deletions

View file

@ -11,9 +11,11 @@ and this project adheres to [Semantic Versioning](https://semver.org/spec/v2.0.0
### Changed
- **Removed dead references to a retired repository.** A CLAUDE.md
paragraph and a board-selftest comment named a repository that no longer
exists; both are reworded without the name. No behaviour change.
- **Removed dead references to retired repositories.** A CLAUDE.md
paragraph, two board-selftest comments and the 2026-09-03 coordination-debt
measurement named repositories that no longer exist, or a real mailbox as an
example; all are reworded without the names, and the measured numbers are
unchanged. No behaviour change.
### Added

View file

@ -117,10 +117,10 @@ denominator.
claude-playlist-corpus 1 0 -
graceful-handoff 3 0 -
human-friendly-style 1 0 -
ki-produktivitetsmodell 1 0 -
(retired repository A) 1 0 -
llm-ingestion-guard 1 0 25
llm-security 2 0 -
mcp-servere 2 0 -
(retired repository B) 2 0 -
okr 1 0 -
org-ops 5 2 -
portfolio-optimiser-commons 3 0 -
@ -142,10 +142,10 @@ something it must never touch, and is a defect, not a result.
gap is entirely the moving cutoff.** Verified two ways rather than assumed.
Yesterday's 14-day cutoff was ~20260820T184902; today's is 20260821T055442.
Four notices timestamped 2026-08-20 between those two instants
(`human-friendly-style` T210113Z, `ki-produktivitetsmodell` T205611Z, `org-ops`
(`human-friendly-style` T210113Z, retired repository A T205611Z, `org-ops`
T210955Z and T211358Z) crossed the boundary in one calendar day: 7 + 4 = 11.
Independently, `--days 15` today yields 6, and those 6 plus
`mcp-servere/20260820T104644Z` - which sits between the 15-day cutoff and
retired repository B's `20260820T104644Z` - which sits between the 15-day cutoff and
yesterday's 14-day one - reconstruct yesterday's 7 exactly. The engine is
consistent; the 7 was a measurement of a moment, never a constant, and reading
it as one would have been face 3 of the verification law pointed at our own