docs: the carousel after round 9e is approved, notes brought in line
The project owner approved the ten slides the same evening (d7828d9). The
project notes, the changelog and review log part 31 still called them a
proposal; they now say what was approved and that the carousel in pdf/ is
the approved one.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
parent
d7828d9306
commit
12cbfabd80
3 changed files with 8 additions and 2 deletions
|
|
@ -319,5 +319,6 @@ All notable changes to this project will be documented in this file.
|
|||
cost range is a budget or a final cost, that nature loss from wind power carries no price, and what the cooling
|
||||
water and emission columns on the results page are. The source bank counts 1,237 entries (was 1,236). The
|
||||
results page has 7,213 numbers and is published again to the same artifact. The carousel changes (ten slides)
|
||||
are a proposal until the project owner says yes; `pdf/` keeps the approved carousel. The report is 171 pages.
|
||||
were a proposal until the project owner approved them the same evening (carousel rebuilt, 28 slides, copied to
|
||||
`pdf/`). The report is 171 pages.
|
||||
Review log part 31.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue