docs: clarifications 144 to 149, the plan for the additional analyses

Written and committed before any of them is coded or computed, as the
project owner approved 2026-11-23. Clarification 144 holds the frame: what
an additional analysis is, the rule for the order, that everything started
is reported, what was known beforehand, and all fifteen with a decision.
145 to 148 fix the four that are done now on the frozen numbers (expected
net present value, half the construction time for small units with the
free choice of unit size, no displacement in the grid queue, net present
value by term), and 149 how they are run, checked and stored in
data/tillegg/. Row in appendix C, dated entry in the pre-registration,
report rebuilt (172 pages).

No verdict, threshold, parameter, draw or result file changes.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
Kjell Tore Guttormsen 2026-11-23 21:21:32 +01:00
commit 16aefee608
Signed by: ktg
SSH key fingerprint: SHA256:JakMjO6FTBBzN0Bhfj9saOoEjaFxlSdYuZQQpM/lF9Q
6 changed files with 161 additions and 1 deletions

View file

@ -25,7 +25,10 @@ carousel, Python code, and a Claude plugin (own repo, later).
- `FORHANDSREGISTRERING.md`: the approved direction and pre-registered criteria (M1–M7). Committed.
- `modell/spesifikasjon.md`: the model specification (equations S1–S54; clarification 143, 2026-11-23, corrects the
sentence of chapter 2 on interest during the data centre's construction, which pulls against the programme
in net present value and is not computed; chapter 17, the addition to the
in net present value and is not computed; clarifications 144 to 149, 2026-11-23, approved by the operator
the same day, fix the additional analyses made after the results, before any of them is computed: the rule
for the order, what was known beforehand, all fifteen with a decision, and how nr. 12, 13, 11 and 14 are
computed, checked and stored in `data/tillegg/`, outside the verdicts; chapter 17, the addition to the
direction, is coded all the way: solution T through the build-out, the power system, the cash flow, the
levelised cost, ownership, scale, M5 and the verdicts, and S48–S54).
`modell/parametere.json`: the frozen