docs: clarifications 144 to 149, the plan for the additional analyses
Written and committed before any of them is coded or computed, as the project owner approved 2026-11-23. Clarification 144 holds the frame: what an additional analysis is, the rule for the order, that everything started is reported, what was known beforehand, and all fifteen with a decision. 145 to 148 fix the four that are done now on the frozen numbers (expected net present value, half the construction time for small units with the free choice of unit size, no displacement in the grid queue, net present value by term), and 149 how they are run, checked and stored in data/tillegg/. Row in appendix C, dated entry in the pre-registration, report rebuilt (172 pages). No verdict, threshold, parameter, draw or result file changes. Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
parent
12cbfabd80
commit
16aefee608
6 changed files with 161 additions and 1 deletions
Binary file not shown.
Loading…
Add table
Add a link
Reference in a new issue