docs: clarifications 144 to 149, the plan for the additional analyses

Written and committed before any of them is coded or computed, as the
project owner approved 2026-11-23. Clarification 144 holds the frame: what
an additional analysis is, the rule for the order, that everything started
is reported, what was known beforehand, and all fifteen with a decision.
145 to 148 fix the four that are done now on the frozen numbers (expected
net present value, half the construction time for small units with the
free choice of unit size, no displacement in the grid queue, net present
value by term), and 149 how they are run, checked and stored in
data/tillegg/. Row in appendix C, dated entry in the pre-registration,
report rebuilt (172 pages).

No verdict, threshold, parameter, draw or result file changes.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
Kjell Tore Guttormsen 2026-11-23 21:21:32 +01:00
commit 16aefee608
Signed by: ktg
SSH key fingerprint: SHA256:JakMjO6FTBBzN0Bhfj9saOoEjaFxlSdYuZQQpM/lF9Q
6 changed files with 161 additions and 1 deletions

View file

@ -103,6 +103,14 @@ vektinger og risikogrenser, slik forhåndsregistreringen sier; står som kjent b
(\cref{sec:begrensninger}).
& Etter at resultatene forelå.
& Kriteriene, regelen og grensen på 25~\% er uendret. \\
\addlinespace
23.11.2026 & \textbf{Tilleggsanalyser:} fire beregninger som kritikere og lesere ba om, gjøres på de frosne
tallene (forventet netto nåverdi, halv byggetid for små enheter med fritt enhetsvalg, ingen fortrengning i
nettkøen, netto nåverdi etter ledd; avklaring 144 til 149 i spesifikasjonen). Planen ble committet før noe
ble regnet; retningen for den første var da alt sett i de publiserte persentilene.
& Etter at resultatene forelå.
& Ingen dom, terskel, parameter eller resultatfil er endret; tallene står ved siden av dommene og teller
ikke i dem. \\
\end{xltabular}
}