docs: describe the build-out, the cash flow and the event stream
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
parent
5c91cadf4c
commit
326b80d8d1
3 changed files with 30 additions and 9 deletions
11
CHANGELOG.md
11
CHANGELOG.md
|
|
@ -24,3 +24,14 @@ All notable changes to this project will be documented in this file.
|
|||
- Known-answer tests against Argonne, NOU 2026: 4, Epoch and NVE with the sources' own assumptions
|
||||
(`tests/test_fasit.py`). The misses are kept as documented expected failures: wind on land and offshore wind
|
||||
come out 5–6 % below NVE, and three rows of Argonne's table depend on a reading the source does not settle.
|
||||
- Build-out, power system and cash flow in code (`src/tokenfabrikker/`): when each facility starts and which
|
||||
vintages of IT hardware it gets (S22, S33), the export rule with its own stored stream of random numbers
|
||||
(`data/aarshendelser.npy`), the fitted price lines and the power and capacity balances (S23–S25, S38), and the
|
||||
yearly cash flows with residual value, the additionality rule and net present value for Norway (S26, S34, S35,
|
||||
S40, S45). Tested on made-up numbers only; no result for the hypothesis has been computed.
|
||||
- A second independent reader coded these equations from the specification alone and found 28 ambiguities. They
|
||||
are settled in clarifications 21–40 in chapter 16 of the specification. With the readings aligned, the two
|
||||
implementations agree on 10 000 made-up build-out paths. The clarifications that are choices are marked and put
|
||||
to the project owner (`modell/fagfellevurdering-utkast-2-og-3.md`, part 5).
|
||||
- The price lines of S38 are held against NVE's twelve scenarios: within 5 % for Norway and three price areas,
|
||||
6.0 % and 7.7 % off in one scenario for NO3 and NO4, kept as documented expected failures.
|
||||
|
|
|
|||