docs: the approval of the sensitivity readings in CLAUDE.md and CHANGELOG
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
parent
550f02d0a9
commit
5f139a0698
2 changed files with 5 additions and 3 deletions
|
|
@ -183,7 +183,8 @@ All notable changes to this project will be documented in this file.
|
|||
rules and the table on invented outcomes and 4 300 outcomes of the 37 run rows through both model codes on
|
||||
made-up draws without a difference. The reader found one place where the text gave two different numbers
|
||||
(which outage rates size the reserve units when the unit size is chosen freely), now settled, and that the
|
||||
row with standard contract terms can favour the dedicated plant, which is put to the project owner. One
|
||||
row with standard contract terms can favour the dedicated plant; the project owner approved the readings
|
||||
2026-11-13, and the row carries a note that says so. One
|
||||
figure differs between the two codes, by at most 6e-5: the reader does not scale decommissioning after the
|
||||
final year in the efficiency row, and the specification says it is scaled
|
||||
(`modell/fagfellevurdering-utkast-2-og-3.md`, part 16). No result has been computed.
|
||||
|
|
|
|||
|
|
@ -61,8 +61,9 @@ carousel, Python code, and a Claude plugin (own repo, later).
|
|||
no threshold) and 115 (a threshold counts only when the quantity demonstrably affects the outcome, and a
|
||||
threshold in rho_N must hold in both halves of rho_D) were approved by the operator 2026-11-13 and are
|
||||
clarifications 21 to 23 of the pre-registration. Clarifications 116 to 123 settle the sensitivity list
|
||||
line by line (42 rows from 37 lines), and 124 what the independent reader found in them; 124 (b), that
|
||||
line 10 can favour A, is put to the operator.
|
||||
line by line (42 rows from 37 lines), and 124 what the independent reader found in them; the operator
|
||||
approved the readings 2026-11-13 (125). Line 10 follows the frozen list and can favour A; the row says so
|
||||
(`Rad.merknad`).
|
||||
Solution T (`Losning.T_F`, `Losning.T_K`) goes through `lag_plan` (a `Trinnvisplan`) and `regn_program`
|
||||
with a module in the place of a facility (`Programresultat.P_enhet`): renewable modules have their own
|
||||
portfolio as in C, the nuclear modules of T-K share the programme's units as in B
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue