docs(rapport): corrections after the fresh-reader test (round 9d)

Six new readers who had seen nothing, two of them well-informed
supporters of nuclear power, read the built PDFs, the carousel proposal
and the post; a controller tried to refute each finding. 73 findings:
30 confirmed, 42 partly, 1 rejected. No measured number, equation or
code was wrong. One sentence in chapter 4 was (interest during the data
centre's construction time does not apply equally to Norway and the
competitor); clarification 143 corrects it and chapter 8 lists it as
not computed.

- grid-connected nuclear now stands next to the dedicated plant where
  the conclusion is drawn; caveats are listed in both directions
- what the dedicated plant is in the model; Barakah in chapter 7 and 8
  (new entry K28-011)
- the direction of the discount rate is explained from S26 instead of
  "not explained"; what remains unexplained is still said outright
- the price rule, the numerator and denominator of the scale target,
  the state's rate, requirements that hold by construction, the two
  build-rate caps
- the rest from reading rounds 9a and 9b; title of K06-016 corrected
- the web page rebuilt (7211 numbers checked against the result files)
- report 171 pages, summary 2 pages (set in 10 pt); PDFs rebuilt

The carousel is unchanged: its new wording is a proposal until the
project owner has approved it.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
Kjell Tore Guttormsen 2026-11-23 18:29:08 +01:00
commit 6443c4f151
Signed by: ktg
SSH key fingerprint: SHA256:JakMjO6FTBBzN0Bhfj9saOoEjaFxlSdYuZQQpM/lF9Q
36 changed files with 826 additions and 418 deletions

View file

@ -2,12 +2,16 @@
En åpen matematisk modell som tester om, og under hvilke betingelser, statlig eide AI-datasentre kan lønne seg for Norge.
**Svaret: hypotesen holder ikke.** Et statlig eid AI-datasenter som selger regnekraft til utlandet, gir tap for
Norge når dagens knapphet på regnekraft går over i et normalt marked. For ett anlegg på 1 000 MW er netto
nåverdi for samfunnet i medianen −19,5 mrd. kr med ny fornybar kraft og −208,2 mrd. kr med eget
kjernekraftverk, og den er positiv i høyst 1,1 % av de 10 000 beregningene. Andelen er regnet med prisen på
regnekraft lik konkurrentens kostnad, med samme avkastningskrav som Norge. Hvor mye høyere prisen må være,
viser pristerskelen: 7 % over modellens forløp før ett anlegg med ny fornybar kraft går i null i medianen, 79 %
med eget kjernekraftverk. Satsingen blir heller ikke stor nok til å bli en ny olje.
Norge når dagens knapphet på regnekraft går over i et normalt marked. Det gjelder alle de fem kraftløsningene
som er prøvd. For ett anlegg på 1 000 MW er netto nåverdi for samfunnet i medianen −19,5 mrd. kr med ny
fornybar kraft, −109,8 mrd. kr med kjernekraft på nettet og −208,2 mrd. kr med eget kjernekraftverk, et
kraftverk uten nettforbindelse bygd av mange små reaktorer. I et normalt marked er prisen på regnekraft i
modellen satt lik kostnaden til en ny konkurrent med vanlig avkastning, og kraften er om lag 7 % av den
kostnaden. Gevinsten er dermed begrenset av måten prisen er satt på, mens tapet er et funn. Nåverdien er
positiv i høyst 1,1 % av de 10 000 beregningene, men fordi prisen er satt lik kostnaden, sier andelen ikke hvor
sannsynlig en høyere pris er. Prisen må ligge 7 % over modellens forløp før ett anlegg med ny fornybar kraft
går i null i medianen, 43 % med kjernekraft på nettet og 79 % med eget kjernekraftverk. Satsingen blir heller
ikke stor nok til å bli en ny olje.
- [Resultatene som nettside](https://claude.ai/artifact/FRKuLpXxb1UaP2FinPVh9p): svaret, figurene og alle tallene, rett i nettleseren uten
innlogging. Du velger selv scenario, størrelse og kraftløsning, og et klikk på et tall viser hvor det kommer fra.
@ -15,7 +19,7 @@ med eget kjernekraftverk. Satsingen blir heller ikke stor nok til å bli en ny o
- [Rapporten (PDF, utkast)](pdf/Tokenfabrikker.pdf)
- [Karusell (PDF): funnene forklart på 28 bilder](pdf/Tokenfabrikker_karusell.pdf)
- [Forhåndsregistreringen](FORHANDSREGISTRERING.md): hva som skulle til for at hypotesen holder, skrevet ned
før noe ble regnet
før modellen ble regnet. Den ligger i prosjektets egen git-historikk, ikke i et offentlig register.
- [Resultatfilene](data/resultater/) fra hovedkjøringen
**Status:** Hovedkjøringen på de frosne tallene er gjort, og resultatfilene ligger i `data/resultater/`.
@ -43,13 +47,14 @@ Koden kjøres fra `src/` uten å installeres (`PYTHONPATH=src`).
## Hva modellen gjør
Modellen prøver hypotesen at AI-datasentre som i prinsippet eies av staten, kan bli en inntektskilde for
Norge slik oljen har vært. Den sammenligner fem måter å skaffe strøm på, på like vilkår: eget kjernekraftverk
for hvert datasenter, kjernekraft koblet til nettet, ny fornybar kraft med lagring og fleksibilitet, og
trinnvis utbygging i moduler med fornybar kraft eller med kjernekraft når den kan komme. For hver regner den
Norge slik oljen har vært. Den sammenligner fem måter å skaffe strøm på, med samme modell og regler: eget
kjernekraftverk for hvert datasenter, uten nettforbindelse og bygd av mange små reaktorer, kjernekraft på nettet, ny fornybar kraft fra vind og vann, og trinnvis
utbygging i moduler med fornybar kraft eller med kjernekraft når den kan komme. Modellen bygger ingen ny
lagring; fleksibiliteten er vannmagasinene som finnes, fast effekt og utkobling. For hver regner den
lønnsomhet for samfunnet og for virksomheten, strømpris, forsyningssikkerhet, miljø og skala mot
petroleumsinntektene, og den sammenligner fire statlige eierformer. Alt som er usikkert, har et spenn, fra
kildene der de finnes, og modellen er regnet 10 000 ganger med ulike verdier innenfor spennene. Målene og grensene for
svaret ble skrevet ned og godkjent før noe ble regnet.
svaret ble skrevet ned og godkjent før modellen ble regnet.
## Hva dette ikke er
- Ikke en offentlig utredning, og ikke en anbefaling om å bygge. Modellen er et regnestykke.
@ -61,14 +66,18 @@ svaret ble skrevet ned og godkjent før noe ble regnet.
over regnekraft for beredskap og suverenitet er ikke prissatt.
- Resultatet er ikke at regnekraft aldri kan lønne seg. Hva som kunne endre svaret, står i sammendraget og i
konklusjonen i rapporten.
- Forbeholdene går begge veier: noe kan gjøre kjernekraft dyrere enn i modellen, noe kan gjøre den billigere
og raskere, og tre forenklinger trekker i favør av ny fornybar kraft. De står i sammendraget og i
konklusjonen.
## Innhold
- `FORHANDSREGISTRERING.md`: hva som testes, og hva som skal til for at hypotesen holder.
- `kilder/`: kildebanken, én fil per område, hver post med påstand, tall, kilde og ordrett sitat.
- `modell/spesifikasjon.md`: modellen med alle ligningene, størrelsene og avklaringene.
- `modell/parametere.json`: parameterne, frosset før noe ble regnet, med verdi, spenn, fordeling og kilde.
- `modell/parametere.json`: parameterne, frosset før modellen ble regnet, med verdi, spenn, fordeling og kilde.
- `modell/kart.md`: kart fra hver ligning til funksjonen i koden som regner den.
- `modell/fagfellevurdering-*.md`: hva uavhengige lesere (språkmodeller) fant, og hva som ble gjort med det.
- `modell/fagfellevurdering-*.md`: hva fagfellene fant, og hva som ble gjort med det. Fagfellene er
språkmodeller, ikke fagpersoner.
- `src/tokenfabrikker/`: koden, med én funksjon per ligning.
- `data/`: de 10 000 lagrede trekningene og resultatfilene fra hovedkjøringen (`data/resultater/`).
- `rapport/`: rapporten, sammendraget og karusellen i LaTeX.
@ -89,6 +98,12 @@ Ingenting kjører testene automatisk. Denne kommandoen kjører dem:
Testene merket `xfailed` er dokumenterte avvik mot en publisert beregning, ikke feil.
Kontrollene av koden (stil, formatering og typer) kjøres slik:
```bash
.venv/bin/ruff check . && .venv/bin/ruff format --check . && .venv/bin/mypy
```
Disse to kommandoene lager trekningene og strømmen for eksportregelen på nytt og sier om de er like de
lagrede:

View file

@ -183,16 +183,16 @@ Søkene ble gjort 11. november 2026. Primærkildene ble lastet ned eller åpnet
- **Lest:** ja
- **Kontroll:** bekreftet. Åpnet Menon-publikasjon nr. 129/2026 (forord datert september 2026, oppdragsgiver DFD, Multiconsult underleverandør). 87/49/761 MW på PDF-s. 4, 16 og 18; sitatet om Green Mountain og WS Computing på PDF-s. 18 (trykt 17); scenario 1 på PDF-s. 68 (trykt 67); scenario 2 og 3 (27/17 TWh i 2035, 18/13 TWh i 2030) og realiseringsgrader på PDF-s. 65 og 69; «klart flest datasentre, både i antall og MW, ligger … i prissone NO1» på PDF-s. 20. Supplert med utnyttelsesgraden.
### K06-016 Statnett stanser nye reservasjoner for datasentre til senest 1. august 2027
### K06-016 Statnett stanser nye reservasjoner for datasentre; stansen ventes opphevet senest 1. august 2027
- **Påstand:** Statnett innførte 9. november 2026 en midlertidig stans i nye tilknytningsreservasjoner og i behandling av nye søknader om godkjenning av anleggsfunksjonalitet (fos § 14) for datasentre, i påvente av funksjonskrav (gjennomkjøring av feil, ramping, pendlinger). Begrunnelsen er systemdrift, ikke energimengde. Statnett oppgir 800 MW tilknyttet, 4 200 MW reservert, 9 100 MW i kø og 18 000 MW i forespørsler, mot et maksimalt norsk effektforbruk på litt over 25 000 MW. Datasentre kan på sikt også være en balanseringsressurs.
- **Tall:** 800 / 4 200 / 9 100 / 18 000 MW; maks forbruk >25 000 MW; stans til senest 1.8.2027.
- **Tall:** 800 / 4 200 / 9 100 / 18 000 MW; maks forbruk >25 000 MW; stansen ventes opphevet senest 1.8.2027.
- **Spenn:** ingen.
- **Kilde:** Statnett, pressemelding «Midlertidige tiltak for fortsatt forsvarlig systemdrift», 9.11.2026, https://www.statnett.no/om-statnett/nyheter-og-pressemeldinger/nyhetsarkiv-2026/midlertidige-tiltak-for-fortsatt-forsvarlig-systemdrift
- **Sitat:** «800 MW datasenter er i dag tilknyttet nettet, 4 200 MW har fått reservert kapasitet, 9 100 MW står i kapasitetskø. I tillegg ligger det inne forespørsler om tilknytning av ytterligere 18 000 MW. Til sammenligning er det maksimale effektforbruket i Norge litt over 25 000 MW.»; «Eksempler på funksjonskrav er krav til i hvilke situasjoner datasentre ikke skal koble seg fra nettet ved driftsforstyrrelser, krav til hvor raskt forbruket i datasentre skal kunne endres (ramping)»; «Det er datasentrenes systemmessige egenskaper som utløser den midlertidige stansen.»; «Datasentre kan også utgjøre en ressurs i eksempelvis balanseringen av kraftsystemet.»
- **Kvalitet:** pressemelding (Statnett SF, systemansvarlig)
- **Usikkert:** Varighet og innhold i kravene er ikke fastsatt (må godkjennes av RME).
- **Lest:** ja
- **Kontroll:** bekreftet. Åpnet pressemeldingen på statnett.no (publiseringsdato vises ikke i uttrekket; regjeringens pressemelding 09.11.2026 omtaler stansen samme dag). Alle fire sitater og «senest 1. august 2027» funnet ordrett. Stansen omfatter også behandling av mottatte fos § 14-søknader for anlegg i 420 kV-nettet.
- **Kontroll:** bekreftet. Åpnet pressemeldingen på statnett.no (publiseringsdato vises ikke i uttrekket; regjeringens pressemelding 09.11.2026 omtaler stansen samme dag). Alle fire sitater og «senest 1. august 2027» funnet ordrett. Stansen omfatter også behandling av mottatte fos § 14-søknader for anlegg i 420 kV-nettet. Tillegg 2026-11-23: tittelen og Tall-feltet sa «til senest 1. august 2027», som gjorde Statnetts forventning til en frist; kilden sier at stansen «forventes opphevet senest 1. august 2027» (ordrett i K22-001). Rettet til «ventes opphevet senest»; ingen tall er endret.
### K06-017 Regjeringen 9.11.2026: konsesjonsordning, prioritering av samfunnskritisk forbruk og dialog om egen kraftproduksjon
- **Påstand:** Regjeringen tar sikte på en konsesjonsordning for eksisterende og nye datasentre (hovedprinsipper høsten 2027; den engelske utgaven av pressemeldingen, datert 10.11.2026, sier «in the autumn 2027», den norske «til høsten»; K21-037), vil prioritere samfunnskritisk forbruk, modernisere tilknytningsplikten, la stort nytt forbruk dekke mer av nett- og systemkostnadene, gå i dialog med næringen om at den selv bygger kraftproduksjon (gasskraft med CCS, havvind) og utrede statlig eierskap i særskilt samfunnsnyttige prosjekter. Kryptodatasentre anses ikke som samfunnsnyttige.

View file

@ -1,6 +1,6 @@
# 28 — Avtaler og fakta fra kritikkrunden
Området samler avtaler og kostnadstall som kritikerne viste til i lesingen av rapporten 23. november 2026: lange leieavtaler for bygg og kraft til KI-datasentre, de største avtalene om regnekraft, og kostnaden for nyere reaktorprosjekter. Området er laget etter parameterfrysen og etter at resultatene forelå. Det mater ingen parameter: ingen verdi i parameterfila er endret, og ingen post her bærer en parameter. Postene brukes bare i rapportteksten, der det står hva avtalene og kostnadstallene viser og ikke viser.
Området samler avtaler og kostnadstall som kritikerne viste til i lesingen av rapporten 23. november 2026: lange leieavtaler for bygg og kraft til KI-datasentre, de største avtalene om regnekraft, og kostnaden for nyere reaktorprosjekter. K28-011 kom til samme dag fra leserunde 9d. Området er laget etter parameterfrysen og etter at resultatene forelå. Det mater ingen parameter: ingen verdi i parameterfila er endret, og ingen post her bærer en parameter. Postene brukes bare i rapportteksten, der det står hva avtalene og kostnadstallene viser og ikke viser.
Området bygger videre på banken og gjentar ikke det som alt står der: IRENs femårskontrakt til om lag 22 mill. USD per MW IT og at kontraktsprisene steg i 2026 (K13-005), IRENs avtale med Microsoft (K08-033), Applied Digitals leieavtaler på 15 år (K13-K01), prisfallet og stigningen i leieprisene for GPU-er (K08-030, K08-031, K08-K04, K13-012), Darlington (K03-032, K03-033, K21-078), IEAs kostnad for den første små reaktoren og leverandørenes mål (K27-027), og Tydal som sak i Statnetts register (K22-019, K22-021).
@ -124,6 +124,17 @@ Primærtekstene ble hentet av økta 23. november 2026 som tekst og lest som teks
- **Lest:** 2026-11-23 (tekst av pressemeldingen hentet av økta)
- **Kontroll:** bekreftet 2026-11-23 (sitatet funnet ordrett i primærteksten av økta)
### K28-011 IEA 2025: Barakah i Emiratene ble ferdig med forsinkelser på linje med Saeul 1 og 2 i Korea og med begrenset kostnadsoverskridelse
- **Påstand:** IEA skriver at kjernekraftverket Barakah i De forente arabiske emirater ble ferdig med forsinkelser på linje med dem Saeul 1 og 2 i Korea hadde, og med begrenset kostnadsoverskridelse. Prosjektet står i figur 1.7 med etiketten «Barakah 1-4».
- **Tall:** ingen tall i teksten; verdien i figur 1.7 kan ikke leses av teksten.
- **Spenn:** —
- **Kilde:** IEA, «The Path to a New Era for Nuclear Energy», 2025 (samme rapport som K28-008), https://iea.blob.core.windows.net/assets/99ad2a8e-08f6-40aa-8989-1dac4eea1dd1/ThePathtoaNewEraforNuclearEnergy.pdf, kap. 1, trykt s. 23 (PDF-s. 26), rett over figur 1.7.
- **Sitat:** «Similarly, Barakah nuclear power plant in the United Arab Emirates was completed with comparable schedule delays to those experienced by Saeul 1 and 2, while incurring limited cost overrun.»
- **Kvalitet:** utredning (mellomstatlig organisasjon)
- **Usikkert:** «Limited cost overrun» er IEAs ord uten tall. Finansieringsrammen står i K03-011 (en ramme, ikke en revidert sluttkostnad), og konsulentenes tall i K16-009. Hvor stor forsinkelsen var, sier ikke setningen; K03-011 oppgir om lag 3–4 år per enhet.
- **Lest:** 2026-11-23 (PDF hentet og lest med pdftotext; først funnet av kontrolløren i leserunde 9d)
- **Kontroll:** bekreftet 2026-11-23 (sitatet funnet ordrett i primærteksten, på siden etter sidemerket «PAGE | 22», altså trykt s. 23, rett over figur 1.7, som har etiketten «Barakah 1-4»)
## Ikke funnet
- Løpetiden for partnerskapet på 10 mrd. USD (K28-002) står ikke i meldingen. Utleierens melding er ikke lest som 6-K hos SEC.

View file

@ -2787,6 +2787,17 @@ presisering 17 i forhåndsregistreringen på ett punkt (M6) og er prosjekteiers
filene gjenskapes ved å kjøre kommandoen på nytt til en annen mappe og sammenligne sjekksummene.
(f) *Flere prosesser.* Gjennomløpet for `miljo.json` deles på prosessene per trekning og settes sammen i
trekningenes rekkefølge; filene har de samme bytene uansett antall prosesser.
143. *Renter i datasenterets byggetid (kapittel 2). Skrevet 2026-11-23, etter at resultatene forelå, etter
leserunde 9d.* Ingen ligning, ingen kode, ingen parameter, ingen resultatfil og ingen dom endres.
Kapittel 2 sier at forenklingen «gjelder Norge og konkurrenten likt». For den nivåiserte formen (S15)
stemmer det: verken kostnaden i Norge eller prisen på regnekraft (S18) har renter i byggetiden. For netto
nåverdi stemmer det ikke. I Norges kontantstrøm betales bygg og første årgang jevnt over byggetiden
$\tau_D$ før oppstart (kapittel 2 og avklaring 33), mens prisen på regnekraft ikke dekker rentene av det. Senere årganger
betales året før de settes i drift, som i den nivåiserte formen, og der er det ingen forskjell. Setningen
i kapittel 2 leses derfor slik: «Renter i datasenterets byggetid er ikke med i den nivåiserte formen og
dermed heller ikke i prisen på regnekraft. I netto nåverdi betaler Norge bygg og første årgang før
oppstart, så forenklingen trekker mot satsingen, med alle løsningene.» Hvor mye, er ikke regnet; det
står i rapportens kapittel 8 blant det som ikke er regnet.
## 17. Tillegget til retningen (2026-11-12)

File diff suppressed because one or more lines are too long

View file

@ -54,7 +54,7 @@ LOSNINGSNAVN = {
"A": "Eget kjernekraftverk for hvert datasenter",
"B": "Kjernekraft på nettet",
"B'": "Eget kjernekraftverk koblet til nettet",
"C": "Ny fornybar kraft med lagring og fleksibilitet",
"C": "Ny fornybar kraft (vind og vann)",
"R": "Kjøp fra nettet uten ny kraft",
"T-F": "Trinnvis i moduler, med fornybar kraft",
"T-K": "Trinnvis i moduler, med kjernekraft når den kan komme",
@ -79,40 +79,45 @@ SCENARIOTEKST = {
"knapphet varer": (
"Knapphet varer",
(
"Dagens knapphetspåslag på prisen for regnekraft står ved lag i ti år fra løsningens "
"første anlegg, og er borte etterpå."
"Dagens knapphetspåslag på prisen for regnekraft står ved lag i ti år etter at "
"løsningens første anlegg er i drift, og er borte etterpå. Et konstruert scenario uten "
"kilde."
),
),
"normalisering": (
"Normalscenarioet",
(
"Scenarioet som teller: prisen på regnekraft har mistet dagens knapphetspåslag før "
"det første anlegget er i drift."
"det første anlegget er i drift. At det skjer så tidlig, er et valg uten kilde."
),
),
"overkapasitet": (
"Overkapasitet",
"Prisen på regnekraft ligger 25–45 % under kostnaden i de samme ti årene.",
(
"Prisen på regnekraft ligger 25–45 % under kostnaden i ti år etter at løsningens "
"første anlegg er i drift. Et konstruert scenario."
),
),
"kildenes lave forlop": (
"Kildenes lave forløp",
(
"Mer AI-bruk på brukernes egne maskiner, etter kildens lave forløp: etterspørselen i "
"datasentre faller 11,9 % i 2030 og 21,0 % fra 2035. Ellers som normalscenarioet."
"IEAs laveste forløp for datasentrenes kraftbruk: etterspørselen i datasentre faller "
"11,9 % i 2030 og 21,0 % fra 2035. Forløpet gjelder alle datasentre og skyldes ikke "
"flytting til egne maskiner. Ellers som normalscenarioet."
),
),
"80 % paa egne maskiner, lav": (
"80 % på egne maskiner, lav",
(
"Prosjekteiers scenario uten kilde: etterspørselen i datasentre faller med 37,6 %. "
"Ellers som normalscenarioet."
"Prosjekteiers scenario uten kilde: etterspørselen i datasentre faller 18,8 % i "
"2030 og 37,6 % fra 2035. Ellers som normalscenarioet."
),
),
"80 % paa egne maskiner, hoy": (
"80 % på egne maskiner, høy",
(
"Prosjekteiers scenario uten kilde: etterspørselen i datasentre faller med 64,0 %. "
"Ellers som normalscenarioet."
"Prosjekteiers scenario uten kilde: etterspørselen i datasentre faller 32,0 % i "
"2030 og 64,0 % fra 2035. Ellers som normalscenarioet."
),
),
}
@ -650,6 +655,17 @@ SVARNOKLER = (
for q in (10, 50, 90)
),
*(f"dommer.normalisering.t1.{los}.nnv-median" for los in ("B", "TF", "TK")),
# Added after reading round 9d: nuclear power on the grid where the conclusion stands, the
# scale measured as the state's cash flow, the final-cost reading and where the loss comes from.
"dommer.knapphet.t1.B.m1.andel",
"terskler.pris.B.normalisering.pst-over",
"folsomheter.hoved.normalisering.B.median",
"folsomheter.rad.1.normalisering.A.median",
"folsomheter.rad.1.normalisering.B.median",
*(f"folsomheter.rad.{rad}.normalisering.C.median" for rad in ("23", "22", "17a")),
"dommer.m7.normalisering.t5.C.blant",
"eierformer.A.kontantstrom.median",
"eierformer.C.kontantstrom.median",
)

View file

@ -242,8 +242,8 @@ footer h2{font-size:var(--s2);color:var(--ink)}
<p class="nei" aria-label="Nei.">Nei<span>.</span></p>
</div>
<div>
<p class="svartekst"><strong>Hypotesen holder ikke.</strong> Et statlig eid AI-datasenter som selger regnekraft til utlandet, gir tap for Norge når dagens knapphet på regnekraft går over i et normalt marked. Det gjelder alle de fem måtene å skaffe strøm på som er prøvd, og eget kjernekraftverk er den dyreste.</p>
<p class="svartekst">Satsingen blir heller ikke stor nok til å bli en ny olje. Ett anlegg er for lite, og større programmer lar seg ikke bygge: med fem anlegg rekker de ikke å komme i drift innen 2100 i <span class="t" data-k="dommer.normalisering.t5.TK.m1.ikke-byggbar"></span> til <span class="t" data-k="dommer.normalisering.t5.TF.m1.ikke-byggbar"></span> % av beregningene, og med ti anlegg i <span class="t" data-k="side.normalisering.t10.TK.ikke-byggbar"></span> til <span class="t" data-k="side.normalisering.t10.C.ikke-byggbar"></span> %.</p>
<p class="svartekst"><strong>Hypotesen holder ikke.</strong> Et statlig eid AI-datasenter som selger regnekraft til utlandet, gir tap for Norge når dagens knapphet på regnekraft går over i et normalt marked. Det gjelder alle de fem måtene å skaffe strøm på som er prøvd. Tapet er størst med eget kjernekraftverk, et kraftverk uten nettforbindelse bygd av mange små reaktorer; kjernekraft på nettet taper mindre, og ny fornybar kraft minst.</p>
<p class="svartekst">Satsingen blir heller ikke stor nok til å bli en ny olje. Ett anlegg er for lite, og større programmer lar seg ikke bygge: med fem anlegg rekker de ikke å komme i drift innen 2100 i <span class="t" data-k="dommer.normalisering.t5.TK.m1.ikke-byggbar"></span> til <span class="t" data-k="dommer.normalisering.t5.TF.m1.ikke-byggbar"></span> % av beregningene, og med ti anlegg i <span class="t" data-k="side.normalisering.t10.TK.ikke-byggbar"></span> til <span class="t" data-k="side.normalisering.t10.C.ikke-byggbar"></span> %. Det hviler på tre åpne forutsetninger om hvor fort kraft og servere kan komme på plass.</p>
</div>
</div>
<figure class="heltfig fig">
@ -251,16 +251,16 @@ footer h2{font-size:var(--s2);color:var(--ink)}
<div class="forklaring" aria-hidden="true"><span><i style="background:var(--b-loss)"></i>tap</span><span><i style="background:var(--b-gain)"></i>overskudd</span></div></div>
<svg id="helt-svg" role="img" aria-labelledby="helt-t helt-desc"></svg>
<p class="sr" id="helt-desc"></p>
<figcaption>Normalscenarioet. Hver rad har 101 prikker: det dårligste utfallet, ett punkt for hver hele prosent av de <span class="t" data-k="dommer.antall"></span> beregningene, og det beste. Mellom to naboprikker ligger én prosent av beregningene. Nesten alle ligger til venstre for null: selv mange av de gode utfallene gir tap. Prikker som ligger utenfor figuren, er samlet ved kanten.</figcaption>
<figcaption>Normalscenarioet. Hver rad har 101 prikker: det dårligste utfallet, ett punkt for hver hele prosent av de <span class="t" data-k="dommer.antall"></span> beregningene, og det beste. Mellom to naboprikker ligger én prosent av beregningene. Nesten alle ligger til venstre for null: selv mange av de gode utfallene gir tap. Prikker som ligger utenfor figuren, er samlet ved kanten. I et normalt marked er prisen på regnekraft i modellen satt lik kostnaden til en ny konkurrent med vanlig avkastning, og kraften er om lag 7 % av den kostnaden. Gevinsten er dermed begrenset av måten prisen er satt på, mens tapet er et funn: med ny fornybar kraft går anlegget i null i medianen hvis prisen er <span class="t" data-k="terskler.pris.C.normalisering.pst-over"></span> % høyere. Hvor tapet kommer fra, viser følsomhetene bare delvis: uten eksportstansene blir medianen med ny fornybar kraft <span class="t" data-k="folsomheter.rad.23.normalisering.C.median"></span> mrd. kr, uten regelen som tar bort overskuddet til kraftverkene på nettet <span class="t" data-k="folsomheter.rad.22.normalisering.C.median"></span> mrd. kr og uten skattekostnaden <span class="t" data-k="folsomheter.rad.17a.normalisering.C.median"></span> mrd. kr. Hvor mye hvert ledd bærer samlet, er ikke regnet.</figcaption>
<details><summary>Tallene i tabell</summary><div class="tabwrap"><table id="helt-tab"></table></div></details>
</figure>
<div class="fakta">
<div><b><span class="t" data-k="dommer.normalisering.t1.C.nnv-median"></span><small>mrd. kr</small></b><span>median netto nåverdi med ny fornybar kraft, den løsningen som kommer best ut</span></div>
<div><b><span class="t" data-k="dommer.normalisering.t1.C.m1.andel"></span><small>%</small></b><span>av beregningene gir positiv netto nåverdi, med den beste løsningen</span></div>
<div><b><span class="t" data-k="dommer.normalisering.t1.A.nnv-median"></span><small>mrd. kr</small></b><span>median med eget kjernekraftverk, den dyreste løsningen</span></div>
<div><b><span class="t" data-k="dommer.normalisering.t1.A.nnv-median"></span><small>mrd. kr</small></b><span>median med eget kjernekraftverk, den løsningen som kommer dårligst ut; med kjernekraft på nettet <span class="t" data-k="dommer.normalisering.t1.B.nnv-median"></span> mrd. kr</span></div>
</div>
<div class="hva">
<p><strong>Hva er dette?</strong> Et åpent, ikke-kommersielt forskningsprosjekt: en matematisk modell som prøver om Norge kan tjene på statlig eide <em>tokenfabrikker</em>, det vil si AI-datasentre som eksporterer ferdig prosessert regnekraft. Prøven er ærlig ment: svaret kunne blitt ja, nei eller «bare på visse vilkår». Målene og grensene for svaret ble skrevet ned og godkjent før noe ble regnet. Mye er usikkert, fra byggekostnader til prisen på regnekraft, så modellen er regnet <span class="t" data-k="dommer.antall"></span> ganger, hver gang med nye verdier for alt som er usikkert, innenfor spennene i kildene. Hver slik gjennomregning kalles her en <em>beregning</em> (i rapporten: en trekning). <em>Medianen</em> er verdien halvparten av beregningene ligger under.</p>
<p><strong>Hva er dette?</strong> Et åpent, ikke-kommersielt forskningsprosjekt: en matematisk modell som prøver om Norge kan tjene på statlig eide <em>tokenfabrikker</em>, det vil si AI-datasentre som eksporterer ferdig prosessert regnekraft. Prøven er ærlig ment: svaret kunne blitt ja, nei eller «bare på visse vilkår». Målene og grensene for svaret ble skrevet ned og godkjent før modellen ble regnet. De ligger i prosjektets egen åpne git-historikk, ikke i et offentlig register. Prosjektets fagfeller er språkmodeller som har lest utkastene, og de hadde gjort grove overslag før presiseringene av kriteriene ble skrevet. Hypotesen ble endret før modellen ble regnet, men etter at de samme overslagene pekte mot at eget kjernekraftverk taper. Mye er usikkert, fra byggekostnader til prisen på regnekraft, så modellen er regnet <span class="t" data-k="dommer.antall"></span> ganger, hver gang med nye verdier for alt som er usikkert, innenfor spennene, fra kildene der de finnes. Hver slik gjennomregning kalles her en <em>beregning</em> (i rapporten: en trekning). <em>Medianen</em> er verdien halvparten av beregningene ligger under.</p>
<ul class="lenker">
<li><a data-fil="pdf/Tokenfabrikker_sammendrag.pdf">Sammendrag (PDF)</a></li>
<li><a data-fil="pdf/Tokenfabrikker.pdf">Rapporten (PDF, utkast)</a></li>
@ -278,7 +278,7 @@ footer h2{font-size:var(--s2);color:var(--ink)}
<div class="kort fig" id="olje">
<div class="figtop"><h3 id="olje-t">Så lite blir ett anlegg mot oljen</h3>
<div class="ktrl"><span class="lbl" id="olje-sc-l">Scenario</span><div class="seg" role="group" aria-labelledby="olje-sc-l" id="olje-sc"></div></div></div>
<p class="lese">Før noe ble regnet, ble grensen satt: gir satsingen mindre enn 5 % av statens netto kontantstrøm fra petroleum, det vil si 26,8 mrd. kr per år, er den ikke «den nye oljen». Ved 25 % eller mer ville den vært det. Bidraget er det satsingen gir Norge per år utover vanlig avkastning på kapitalen, i det første året alle anleggene er i drift.</p>
<p class="lese">Før noe ble regnet, ble grensen satt: gir satsingen mindre enn 5 % av statens netto kontantstrøm fra petroleum, det vil si 26,8 mrd. kr per år, er den ikke «den nye oljen». Ved 25 % eller mer ville den vært det. Bidraget er det satsingen gir Norge per år utover vanlig avkastning på kapitalen, i det første året alle anleggene er i drift, mens oljeinntektene er statens kontantstrøm. Målt som statens kontantstrøm i første år med stabil drift, samme slags størrelse som oljeinntektene, er ett anlegg i medianen <span class="t" data-k="eierformer.A.kontantstrom.median"></span> til <span class="t" data-k="eierformer.C.kontantstrom.median"></span> % av dem; det tallet trekker ikke fra avkastningen på kapitalen og er ikke målet som ble satt på forhånd. I et normalt marked kunne grensen i praksis ikke nås, fordi prisen er satt lik kostnaden og store programmer ikke rekker å bli bygget; neiet til hypotesen kommer fra lønnsomheten.</p>
<svg id="olje-svg" role="img" aria-labelledby="olje-t olje-desc" style="margin-top:1rem"></svg>
<p class="sr" id="olje-desc"></p>
<p class="lese" id="olje-les" aria-live="polite"></p>
@ -287,14 +287,14 @@ footer h2{font-size:var(--s2);color:var(--ink)}
<div class="kort fig" id="trapp-kort">
<h3 id="trapp-t">Hvor stort kan det bli?</h3>
<p class="lese">Ett anlegg kan ikke alene bli en ny olje, så spørsmålet er hvor stort programmet kan bli. Modellen bygger 1, 5, 10, 20 eller 40 anlegg så fort leveransene av reaktorer, ny fornybar kraft og brikker tillater. Hver rute er én prosent av beregningene: fylt når alle anleggene er i drift innen 2100, tom når de ikke er det. Tallet under hver rute er andelen som ikke lar seg bygge.</p>
<p class="lese">Ett anlegg kan ikke alene bli en ny olje, så spørsmålet er hvor stort programmet kan bli. Modellen bygger 1, 5, 10, 20 eller 40 anlegg så fort leveransene av reaktorer, ny fornybar kraft og brikker tillater. Hver rute er én prosent av beregningene: fylt når alle anleggene er i drift innen 2100, tom når de ikke er det. Tallet under hver rute er andelen som ikke lar seg bygge. Andelen hviler på tre åpne forutsetninger uten kilde: hvor mye kjernekraft og ny fornybar kraft som kan settes i drift per år, og hvor stor del av verdens produksjon av AI-servere ett program kan få.</p>
<div class="trapp" id="trapp" role="table" aria-labelledby="trapp-t"></div>
<div class="trapptegn" aria-hidden="true"><span><i style="background:var(--gain)"></i>lar seg bygge innen 2100</span><span><i style="box-shadow:inset 0 0 0 1px var(--axis)"></i>lar seg ikke bygge innen 2100</span></div>
</div>
<div class="kort fig" id="tid">
<div class="figtop"><h3 id="tid-t">Det tar lang tid</h3></div>
<p class="lese">Bygges anlegget i moduler på 100 MW, er de første i drift i <span class="t" data-k="tidslinje.dom.TF.median-aar"></span> i medianen. Et helt anlegg på 1 000 MW er i drift i <span class="t" data-k="tidslinje.dom.C.halv-1000-aar"></span> med ny fornybar kraft og i <span class="t" data-k="tidslinje.dom.A.halv-1000-aar"></span> med kjernekraft.</p>
<p class="lese">Bygges anlegget i moduler på 100 MW, er de første i drift i <span class="t" data-k="tidslinje.dom.TF.median-aar"></span> i medianen. Et helt anlegg på 1 000 MW er i drift i <span class="t" data-k="tidslinje.dom.C.halv-1000-aar"></span> med ny fornybar kraft og i <span class="t" data-k="tidslinje.dom.A.halv-1000-aar"></span> med kjernekraft. Det første årstallet bygger på en åpen forutsetning om 3 til 7 år fra beslutning til første tilknytning til nettet, og årstallene for kjernekraft på forutsetningen om 15 til 25 år fra beslutning til første kjernekraft i drift.</p>
<div class="kontroller">
<div class="ktrl"><label for="tid-los">Kraftløsning</label><select id="tid-los"></select></div>
<div class="ktrl"><span class="lbl" id="tid-tr-l">Antall anlegg</span><div class="seg" role="group" aria-labelledby="tid-tr-l" id="tid-tr"></div></div>
@ -320,23 +320,30 @@ footer h2{font-size:var(--s2);color:var(--ink)}
<p class="liten">Netto nåverdi for Norge av ett anlegg, mrd. kr. Hver prikk er én prosent av beregningene.</p>
</div></div>
<div id="steg">
<div class="steg" data-sc="normalisering"><div class="kort"><p class="eyebrow">Normalscenarioet</p><p class="lese">Prisen på regnekraft har mistet dagens knapphetspåslag før det første anlegget er i drift. Det er scenarioet som teller. Netto nåverdi er positiv i høyst <span class="t" data-k="dommer.normalisering.t1.C.m1.andel"></span> % av beregningene, og medianen er negativ for alle fem løsningene.</p></div></div>
<div class="steg" data-sc="normalisering"><div class="kort"><p class="eyebrow">Normalscenarioet</p><p class="lese">Prisen på regnekraft har mistet dagens knapphetspåslag før det første anlegget er i drift. Det er scenarioet som teller. At det skjer så tidlig, er et valg uten kilde, låst før noe ble regnet. Netto nåverdi er positiv i høyst <span class="t" data-k="dommer.normalisering.t1.C.m1.andel"></span> % av beregningene, og medianen er negativ for alle fem løsningene. Andelen er regnet med prisen lik kostnaden til en konkurrent med samme avkastningskrav som Norge, så den sier ikke hvor sannsynlig en høyere pris er.</p></div></div>
<div class="steg" data-sc="knapphet varer"><div class="kort"><p class="eyebrow">Hvis knappheten varer</p>
<p class="lese">Holder dagens knapphetspris seg i ti år fra løsningens første anlegg, flytter prikkene seg mot høyre. Medianen blir positiv med ny fornybar kraft (<span class="t" data-k="dommer.knapphet.t1.C.nnv-median"></span> mrd. kr, positiv i <span class="t" data-k="dommer.knapphet.t1.C.m1.andel"></span> % av beregningene), men er fortsatt negativ med eget kjernekraftverk (<span class="t" data-k="dommer.knapphet.t1.A.nnv-median"></span> mrd. kr).</p>
<p class="lese">Holder dagens knapphetspris seg i ti år etter at løsningens første anlegg er i drift (et konstruert scenario uten kilde), flytter prikkene seg mot høyre. Medianen blir positiv med ny fornybar kraft (<span class="t" data-k="dommer.knapphet.t1.C.nnv-median"></span> mrd. kr, positiv i <span class="t" data-k="dommer.knapphet.t1.C.m1.andel"></span> % av beregningene), men er fortsatt negativ med kjernekraft på nettet (<span class="t" data-k="dommer.knapphet.t1.B.nnv-median"></span> mrd. kr, positiv i <span class="t" data-k="dommer.knapphet.t1.B.m1.andel"></span> %) og med eget kjernekraftverk (<span class="t" data-k="dommer.knapphet.t1.A.nnv-median"></span> mrd. kr).</p>
<p class="lese"><b>Skalaen.</b> I dette scenarioet står skalamålet som «<span class="t" data-k="dommer.knapphet.t1.C.m6.dom"></span>», ikke «holder ikke»: med ny fornybar kraft er ett anlegg over 25 %-grensen i <span class="t" data-k="dommer.knapphet.t1.C.m6.andel"></span> % av beregningene og under 5 %-grensen i <span class="t" data-k="dommer.knapphet.t1.C.m6.andel-ikke"></span> %. Figuren «Så lite blir ett anlegg mot oljen» over viser det.</p>
<p class="lese"><b>Hypotesen holder likevel ikke («<span class="t" data-k="dommer.knapphet.del1"></span>»).</b> Med ny fornybar kraft og de to trinnvise løsningene står ingen av målene som «holder ikke», men forsyningssikkerheten står som «holder under betingelser». Da kreves det at betingelsen kan tallfestes med tall fra kildene, og det kan den ikke: for ny fornybar kraft fant beregningen slike grenser bare i størrelser uten kilde, og for de trinnvise løsningene fant den ingen. Skalaen trenger ingen slik betingelse. Dette scenarioet teller ikke i dommen; det er normalscenarioet som teller.</p></div></div>
<div class="steg" data-sc="overkapasitet"><div class="kort"><p class="eyebrow">Hvis det blir overkapasitet</p><p class="lese">Prisen på regnekraft ligger 25–45 % under kostnaden i de samme ti årene. Alle prikkene flytter seg mot venstre: medianen med ny fornybar kraft blir <span class="t" data-k="side.overkapasitet.t1.C.median"></span> mrd. kr.</p></div></div>
<div class="steg" data-sc="overkapasitet"><div class="kort"><p class="eyebrow">Hvis det blir overkapasitet</p><p class="lese">Prisen på regnekraft ligger 25–45 % under kostnaden i de samme ti årene (et konstruert scenario). Alle prikkene flytter seg mot venstre: medianen med ny fornybar kraft blir <span class="t" data-k="side.overkapasitet.t1.C.median"></span> mrd. kr.</p></div></div>
<div class="steg" data-sc="80 % paa egne maskiner, lav"><div class="kort"><p class="eyebrow">Hvis AI-bruken flytter til egne maskiner</p><p class="lese">Flytter 80 % av AI-bruken utenom trening til brukernes egne maskiner, faller medianen for den beste løsningen til mellom <span class="t" data-k="dommer.egne-lav.t1.C.nnv-median"></span> og <span class="t" data-k="dommer.egne-hoy.t1.C.nnv-median"></span> mrd. kr. Scenarioet er prosjekteiers eget og har ingen kilde. Her vises det lave anslaget.</p></div></div>
<div class="steg" data-sc="80 % paa egne maskiner, hoy"><div class="kort"><p class="eyebrow">Det høye anslaget</p><p class="lese">Med det høye anslaget faller etterspørselen i datasentre med 64,0 %, og medianen med ny fornybar kraft blir <span class="t" data-k="dommer.egne-hoy.t1.C.nnv-median"></span> mrd. kr.</p></div></div>
<div class="steg" data-sc="80 % paa egne maskiner, hoy"><div class="kort"><p class="eyebrow">Det høye anslaget</p><p class="lese">Med det høye anslaget faller etterspørselen i datasentre med 64,0 % fra 2035, og medianen med ny fornybar kraft blir <span class="t" data-k="dommer.egne-hoy.t1.C.nnv-median"></span> mrd. kr.</p></div></div>
</div>
</div>
<h3 style="margin-top:3rem">Tre ting kan snu regnestykket for ett anlegg</h3>
<p class="lese">I normalscenarioet gjør ingen av dem satsingen til en ny olje. Hvis knappheten varer, står skalamålet som «holder under betingelser», som vist over, men hypotesen holder ikke der heller.</p>
<p class="lese">Hvis knappheten varer, står skalamålet som «holder under betingelser», som vist over, men hypotesen holder ikke der heller. Med statens vanlige rente er bare nåverdien regnet om, ikke skalaen.</p>
<div class="hvis">
<div><h3><em>Hvis</em> staten regner med sin vanlige rente</h3><p class="tall"><span class="t" data-k="folsomheter.rad.16.normalisering.C.median"></span> mrd. kr</p><p>Hovedberegningen krever samme avkastning som private ville krevd, fordi statens egne regler sier det for virksomhet i konkurranse med private (rundskriv R-109/2021). Regnet med statens vanlige kalkulasjonsrente (4 %, lavere etter 40 år) blir medianen positiv med ny fornybar kraft, og positiv i <span class="t" data-k="side.rad.16.normalisering.C.m1-andel"></span> % av beregningene. Med eget kjernekraftverk blir medianen derimot lavere: <span class="t" data-k="folsomheter.rad.16.normalisering.A.median"></span> mot <span class="t" data-k="folsomheter.hoved.normalisering.A.median"></span> mrd. kr. Rapporten har ingen forklaring på det.</p></div>
<div><h3><em>Hvis</em> knappheten varer</h3><p class="tall"><span class="t" data-k="dommer.knapphet.t1.C.nnv-median"></span> mrd. kr</p><p>Median med ny fornybar kraft, positiv i <span class="t" data-k="dommer.knapphet.t1.C.m1.andel"></span> % av beregningene. Med eget kjernekraftverk er medianen fortsatt negativ (<span class="t" data-k="dommer.knapphet.t1.A.nnv-median"></span> mrd. kr). Hypotesen holder ikke der heller: vilkårene for et ja lar seg ikke tallfeste med tall fra kildene.</p></div>
<div><h3><em>Hvis</em> prisen på regnekraft blir høyere</h3><p class="tall">+<span class="t" data-k="terskler.pris.C.normalisering.pst-over"></span> %</p><p>Prisen avgjør mest, og ingen kilde kan forutsi den. I normalscenarioet må prisen ligge <span class="t" data-k="terskler.pris.C.normalisering.pst-over"></span> % over modellens forløp for at et anlegg med ny fornybar kraft skal gå i null i medianen, og <span class="t" data-k="terskler.pris.A.normalisering.pst-over"></span> % over med eget kjernekraftverk.</p></div>
<div><h3><em>Hvis</em> staten regner med sin vanlige rente</h3><p class="tall"><span class="t" data-k="folsomheter.rad.16.normalisering.C.median"></span> mrd. kr</p><p>Hovedberegningen krever samme avkastning som private ville krevd, fordi statens regler, slik vi leser dem, sier det for virksomhet i konkurranse med private (rundskriv R-109/2021). At regelen gjelder her, er prosjektets tolkning, og kravet for regnekraft er en åpen forutsetning. Regnet med statens vanlige kalkulasjonsrente (4 %, lavere etter 40 år) blir medianen positiv med ny fornybar kraft, og positiv i <span class="t" data-k="side.rad.16.normalisering.C.m1-andel"></span> % av beregningene. Med kjernekraft på nettet blir medianen bedre, <span class="t" data-k="side.rad.16.normalisering.B.median"></span> mot <span class="t" data-k="folsomheter.hoved.normalisering.B.median"></span> mrd. kr, positiv i <span class="t" data-k="side.rad.16.normalisering.B.m1-andel"></span> %. Med eget kjernekraftverk blir medianen derimot lavere: <span class="t" data-k="folsomheter.rad.16.normalisering.A.median"></span> mot <span class="t" data-k="folsomheter.hoved.normalisering.A.median"></span> mrd. kr. En lavere rente gjør tapet i kraftverket, som ligger år fram i tid, større i dagens kroner, og for eget kjernekraftverk veier det tyngre enn at prisen fortsatt bygger på markedets krav; hvor mye hvert ledd gir, er ikke regnet ut med de frosne tallene. Av samme grunn trekker det i favør av eget kjernekraftverk at hovedberegningen regner verket med avkastningskravet for regnekraft, som er høyere enn kravet for kraft; med kravet for kraft blir medianen <span class="t" data-k="folsomheter.rad.3.normalisering.A.median"></span> mrd. kr. Regnemåten betyr at staten bærer risikoen som markedet ellers tar betalt for; et lavere krav også i markedet ville i modellen gitt lavere pris.</p></div>
<div><h3><em>Hvis</em> knappheten varer</h3><p class="tall"><span class="t" data-k="dommer.knapphet.t1.C.nnv-median"></span> mrd. kr</p><p>Median med ny fornybar kraft, positiv i <span class="t" data-k="dommer.knapphet.t1.C.m1.andel"></span> % av beregningene. Med kjernekraft på nettet er medianen fortsatt negativ (<span class="t" data-k="dommer.knapphet.t1.B.nnv-median"></span> mrd. kr, positiv i <span class="t" data-k="dommer.knapphet.t1.B.m1.andel"></span> %), og med eget kjernekraftverk også (<span class="t" data-k="dommer.knapphet.t1.A.nnv-median"></span> mrd. kr). Hypotesen holder ikke der heller: vilkårene for et ja lar seg ikke tallfeste med tall fra kildene.</p></div>
<div><h3><em>Hvis</em> prisen på regnekraft blir høyere</h3><p class="tall">+<span class="t" data-k="terskler.pris.C.normalisering.pst-over"></span> %</p><p>Prisen avgjør mest, og ingen kilde kan forutsi den. I normalscenarioet må prisen ligge <span class="t" data-k="terskler.pris.C.normalisering.pst-over"></span> % over modellens forløp for at et anlegg med ny fornybar kraft skal gå i null i medianen, <span class="t" data-k="terskler.pris.B.normalisering.pst-over"></span> % over med kjernekraft på nettet og <span class="t" data-k="terskler.pris.A.normalisering.pst-over"></span> % over med eget kjernekraftverk.</p></div>
</div>
<div class="kort" style="margin-top:2.4rem" id="kraft">
<h3>Kraften først. Eget kjernekraftverk uten nett ga størst tap, kjernekraft på nettet mindre.</h3>
<p class="lese">Eget kjernekraftverk er i modellen et kraftverk uten nettforbindelse, bygd av mange små reaktorer med reserveenheter, etter oppsettet i en studie fra amerikanske nasjonallaboratorier. Med eget kjernekraftverk er medianen lavest av de fem løsningene, og sammenlignet med samme modell og regler er det best i <span class="t" data-k="side.m7.normalisering.t1.A.alene"></span> % av beregningene for ett anlegg, ny fornybar kraft i <span class="t" data-k="side.m7.normalisering.t1.C.alene"></span> %. Sammenligningen gir ingen dom, slik forhåndsregistreringen sier: den viser hvor ofte hver er best, og den beste gir også tap. Kjernekraft på nettet kommer bedre ut enn eget kjernekraftverk, men gir også tap: medianen er <span class="t" data-k="dommer.normalisering.t1.B.nnv-median"></span> mrd. kr. Med fem anlegg er løsningene med kjernekraft oftere best, fordi så mye ny fornybar kraft sjelden lar seg bygge; der den kan bygges, er den best i <span class="t" data-k="dommer.m7.normalisering.t5.C.blant"></span> % av beregningene. Hvor mye ny fornybar kraft og hvor mye kjernekraft som kan settes i drift per år, er åpne forutsetninger uten kilde og svært ulike (0,2 til 0,6 TWh ny fornybar kraft ut over det som bygges uansett, mot 500 til 2 000 MW kjernekraft), og sammenligningen med fem anlegg hviler på dem. Med fem anlegg er nåverdien nesten aldri positiv, uansett løsning.</p>
<p class="lese">Kravet til strømprisen, at den øker høyst 5 %, holder i <span class="t" data-k="dommer.normalisering.t1.C.m3.andel"></span> % av beregningene med alle fem løsningene, fordi de er bygd med like mye ny kraft som datasenteret bruker; prisen er regnet som årspris for landet samlet, ikke der anlegget ligger, og ikke time for time. Kjøpes kraften fra nettet uten at ny kraft bygges, holder kravet bare i <span class="t" data-k="dommer.normalisering.t1.R.m3.andel"></span> %, og forsyningssikkerheten svekkes per definisjon i <span class="t" data-k="dommer.normalisering.t1.R.m4.andel-ikke"></span> % av beregningene: «svekkes» betyr svakere enn uten anlegget, uansett hvor lite. Med eget kjernekraftverk holder den per definisjon, fordi verket ikke er koblet til nettet. De andre løsningene er vurdert uten tiltakene som er betalt, og med ny fornybar kraft holder den i <span class="t" data-k="dommer.normalisering.t1.C.m4.andel"></span> %. Miljøkravet holder per definisjon for ny fornybar kraft; for kjernekraft holder det på vilkår, fordi kjernekraften i én av tre kilder ligger over vind på land.</p>
<p class="lese">Forbeholdene går begge veier. To kjente begrensninger kan gjøre kjernekraft dyrere enn i modellen: kostnadsoverskridelsene kan ha en tyngre hale, og tilpasning av et utenlandsk reaktordesign til norsk regelverk er ikke regnet inn. Andre forhold trekker i kjernekraftens favør: kildene viser mer læring og raskere bygging enn de frosne spennene tillater, og sluttkostnader for store reaktorer i Finland og Korea under spennet i modellen. Emiratene, et nytt kjernekraftland, bygde Barakah med en finansieringsramme på om lag 4 400 USD/kW med renter, nominelt, og fikk første enhet på nettet om lag tolv år etter vedtaket, under modellens nedre grense på 15 år; andre nye kjernekraftland har brukt lenger tid. I om lag halvparten av beregningene leses kostnadsspennet for kjernekraft som et budsjett, og en overskridelse legges oppå; leses det som sluttkostnad i alle, blir medianen <span class="t" data-k="folsomheter.rad.1.normalisering.A.median"></span> mrd. kr med eget kjernekraftverk og <span class="t" data-k="folsomheter.rad.1.normalisering.B.median"></span> mrd. kr med kjernekraft på nettet. Observasjonene i kildene er ikke regnet inn. Tre forenklinger trekker i favør av ny fornybar kraft: vannmagasinene som finnes, jevner ut uten kostnad (ny lagring bygges ikke), verdien av vindkraft faller ikke når mye bygges, og en kald uke uten vind er ikke regnet. To trekker mot satsingen med alle løsningene: prisen på regnekraft har ingen renter i datasenterets byggetid, mens Norge betaler bygget og de første brikkene før oppstart, og bare Norge kan rammes av stans i leveransene av brikker. Hva Statnetts funksjonskrav for datasentre på nettet koster, er ikke regnet; det trekker i favør av løsningene på nettet. Høyere strømpris regnes som en gevinst for landet så lenge Norge eksporterer kraft, og hvem som betaler, er ikke regnet. Alt står i rapportens kapittel 7, 8 og 9.</p>
</div>
<div class="kort fig" style="margin-top:2.4rem" id="fa">
@ -397,13 +404,13 @@ footer h2{font-size:var(--s2);color:var(--ink)}
<div id="v-melding"></div>
<div id="v-maal-wrap"><h3 id="v-maal-t" style="margin-top:1.8rem"></h3><div class="maal" id="v-maal"></div></div>
<div id="v-m7-wrap"><h3 id="m7-t" style="margin-top:1.8rem">Hvilken løsning kommer best ut?</h3>
<p class="liten">Andelen av beregningene der løsningen har høyest netto nåverdi av de fem, alene eller delt med en annen. De to trinnvise løsningene er like i beregninger der ingen modul får kjernekraft, og deler da plassen.</p>
<p class="liten">Andelen av beregningene der løsningen har høyest netto nåverdi av de fem, alene eller delt med en annen. De to trinnvise løsningene er like i beregninger der ingen modul får kjernekraft, og deler da plassen. Sammenligningen gir ingen dom: at en løsning er best, betyr ikke at den lønner seg.</p>
<svg id="m7-svg" role="img" aria-labelledby="m7-t m7-desc" style="margin-top:.8rem"></svg><p class="sr" id="m7-desc"></p></div>
</div>
<div class="kort fig" id="fs">
<h3 id="fs-t">Hva om én forutsetning er annerledes?</h3>
<p class="lese">Før noe ble regnet, ble det låst en liste med 42 andre forutsetninger. Hver rad regner hele modellen på nytt med én endring, og sammenlignes med hovedberegningen.</p>
<p class="lese">Før noe ble regnet, ble det låst en liste med 37 andre forutsetninger, som gir 42 rader. Hver rad regner hele modellen på nytt med én endring, og sammenlignes med hovedberegningen.</p>
<div class="kontroller"><div class="ktrl" style="flex:1 1 24rem;max-width:100%"><label for="fs-rad">Forutsetning</label><select id="fs-rad" style="width:100%"></select></div>
<div class="ktrl" id="fs-sc-wrap"><label for="fs-sc">Scenario</label><select id="fs-sc"></select></div></div>
<div id="fs-kort"></div>
@ -411,7 +418,7 @@ footer h2{font-size:var(--s2);color:var(--ink)}
<div class="kort" id="eier">
<h3>Eierformen redder ikke regnestykket</h3>
<p class="lese">Med alle fire statlige eierformer er nåverdien for staten negativ i <span class="t" id="tap-min"></span> til <span class="t" id="tap-max"></span> % av beregningene. Om eierformene er forenlige med statsstøttereglene i EØS-avtalen, står åpent: ingen kilde vurderer dem.</p>
<p class="lese">Med alle fire statlige eierformer er nåverdien for staten negativ i <span class="t" id="tap-min"></span> til <span class="t" id="tap-max"></span> % av beregningene. Om eierformene er forenlige med statsstøttereglene i EØS-avtalen, står åpent: vi fant ingen kilde som vurderer det.</p>
<p class="forkl"><b>Verdien for fellesskapet er ikke det samme tallet som netto nåverdi for Norge.</b> Den er snittet over beregningene av hva staten selv får inn og betaler ut: skatt, utbytte og eierandeler minus kapitalen staten skyter inn, og minus elavgiften private datasentre ellers ville betalt. Netto nåverdi er medianen av alle gevinster og kostnader for hele samfunnet. <b>Verdien er lik for alle fire eierformene</b> fordi modellen lar private eiere betale det andelen deres er verdt. Det er en følge av forutsetningene, ikke et funn. Eierformene skiller seg i risiko og i hvor mye kapital staten har ute.</p>
<div class="tabwrap"><table id="eier-tab"></table></div>
</div>
@ -421,6 +428,11 @@ footer h2{font-size:var(--s2);color:var(--ink)}
<p class="lese">Miljømålet avgjøres etter regler, uten beregninger og andeler. Ny fornybar kraft, kjøp fra nettet og trinnvis med fornybar kraft holder per definisjon. For løsningene med kjernekraft står det som «holder under betingelser»: i én av de tre kildene for utslipp over livsløpet (IPCC) ligger kjernekraften høyere enn den laveste av vind på land og vannkraft, men ikke over den høyeste verdien kilden oppgir for vind på land. Betingelsen er at kildene der kjernekraften ikke ligger høyere (UNECE og NREL), legges til grunn. Arealmålet holder.</p>
<div class="tabwrap"><table id="miljo-tab"></table></div>
</div>
<div class="kort" id="ikke">
<h3>Hva dette ikke er</h3>
<p class="lese">Modellen er et regnestykke, ikke en offentlig utredning og ikke en anbefaling om å bygge. Den prøver statlig eide datasentre som selger regnekraft til utlandet. Om private datasentre lønner seg for eierne, er ikke prøvd; de ligger i nullalternativet, det satsingen sammenlignes med. Modellens anlegg eier både bygget og brikkene; at staten bare eier tomt, bygg og kraft og leier dem ut, er ikke prøvd. Om private eiere ville gjort det bedre enn staten, er heller ikke prøvd. Verdien av norsk kontroll over regnekraft for beredskap og suverenitet er ikke prissatt, og annen bruk av KI er ikke regnet. 40 av 137 parametere er åpne forutsetninger uten kilde som gir tallet. Kildene og koden er kontrollert av språkmodeller, ikke av fagpersoner, og resultatene er ikke vurdert av eksterne fagfolk. Resultatfilene er gjenskapt på samme maskin, ikke på en annen ennå.</p>
</div>
</section>
</main>
@ -435,7 +447,7 @@ footer h2{font-size:var(--s2);color:var(--ink)}
<div><dt>Beregning</dt><dd>Én av <span class="t" data-k="dommer.antall"></span> gjennomregninger av modellen, hver med nye verdier for alt som er usikkert. I rapporten heter det en trekning.</dd></div>
<div><dt>Median</dt><dd>Verdien halvparten av beregningene ligger under.</dd></div>
<div><dt>Netto nåverdi</dt><dd>Alle gevinster minus alle kostnader for Norge over hele levetiden, regnet om til verdien i dag.</dd></div>
<div><dt>Normalscenarioet</dt><dd>Prisen på regnekraft har mistet dagens knapphetspåslag før det første anlegget er i drift. Det er scenarioet som teller.</dd></div>
<div><dt>Normalscenarioet</dt><dd>Prisen på regnekraft har mistet dagens knapphetspåslag før det første anlegget er i drift. Det er scenarioet som teller. At det skjer så tidlig, er et valg uten kilde.</dd></div>
<div><dt>Holder, holder under betingelser, holder ikke</dt><dd>Hvert mål har grenser satt før noe ble regnet. «Holder» betyr at målet nås i minst 80 % av beregningene (for lønnsomhet også med positiv median). «Holder ikke» betyr at grensen for å feile er nådd i minst 80 % (for lønnsomhet: positiv i under 20 %). Alt imellom er «holder under betingelser».</dd></div>
</dl>
<p style="margin-top:1.6rem">Laget <span id="generert"></span> av <code>nettside/lag_nettside.py</code> fra resultatfilene (grunnlag: <span class="t" data-k="side.innhold.merke"></span>). Sammendrag, rapport, forhåndsregistrering, modell, kilder og kode ligger åpent: <a data-repo="1">kildekoden og resultatfilene</a>, <a data-fil="FORHANDSREGISTRERING.md">forhåndsregistreringen</a>. Siden er laget med omfattende bruk av KI.</p>
@ -875,7 +887,7 @@ function flOppsett() {
document.getElementById("fl-x-l").textContent = n.xn; document.getElementById("fl-y-l").textContent = n.yn;
document.getElementById("flate-forkl").textContent = FL.flate === "b" ? "Konkurrentens kraftpris er strømprisen konkurrenten i utlandet betaler; kostnaden for norsk kraft er det bedriften betaler for strømmen her. Alle sju løsningene, ett anlegg, normalscenarioet." : "Avkastningskravet for regnekraft eller for kraft mot hva en reaktor koster, for løsningene med kjernekraft. Ett anlegg, normalscenarioet.";
const m = document.getElementById("fl-merk"); m.hidden = FL.flate !== "c";
m.textContent = "Legg merke til at tapet kan bli mindre når avkastningskravet er høyere, ikke større. Rapporten forklarer ikke hvorfor.";
m.textContent = "Legg merke til at tapet er mindre når avkastningskravet er høyt enn når det er lavt, for alle fire løsningene med kjernekraft. Grunnen ligger i hvordan nåverdien regnes: alt regnes om til verdien i 2027, mens ingenting tjener penger før anleggene starter. Taper en løsning penger, og ligger tapet ikke tidligere enn inntektene, blir tapet mindre i dagens kroner når renten er høyere, og større når den er lavere. Med eget kjernekraftverk betales reaktoren før oppstart, og kraftverket selger ikke kraft; datasenterets egen investering og den delen av prisen som betaler den, følger hverandre uansett rente, så det som blir igjen, er tapet. For kjernekraft på nettet flytter avkastningskravet for regnekraft medianen lite; mønsteret kommer der av at de to kravene henger sammen i beregningene, og kravet for kraft virker på samme måte. Mekanismen er regnet ledd for ledd på et oppdiktet grunnlag, og en kontroll på 200 av de frosne beregningene ga samme retning. Hvordan tapet fordeler seg på ledd med de frosne tallene, er ikke regnet.";
}
function celler() {
const n = flN(); let dmax = 0; const ut = [];
@ -1068,9 +1080,9 @@ const FS = { i: Math.max(0, S.folsomheter.findIndex(function (r) { return r.id =
fsRad.value = String(FS.i);
const LESES = { "normalisering på hovedforløpet": "Leses i normalscenarioet, på ett anlegg.", "knapphet varer": "Leses i scenarioet der knappheten varer, på ett anlegg.", "tabellene for eierformene": "Endrer bare tabellene for eierformene.", "de merkede scenarioene": "Leses i de tre scenarioene der etterspørselen faller." };
const NOTER = {
"16": "Med statens vanlige rente blir medianen lavere for A og B′, samtidig som andelen med positiv netto nåverdi stiger. Rapporten har ingen forklaring på det.",
"3": "Kravet for kraftverket i A blir lavere, men medianen for A faller. Rapporten forklarer ikke hvorfor.",
"4": "Kravet for kjernekraft på nettet blir høyere, men medianen for B og B′ stiger. Rapporten forklarer ikke hvorfor."
"16": "Med statens vanlige rente blir medianen lavere for A og B′, samtidig som andelen med positiv netto nåverdi stiger. Raden gjør to ting: alt regnes om med en lavere rente, og det gjør et tap som ligger fram i tid, større; samtidig bygger prisen på regnekraft fortsatt på markedets krav, og det løfter alle løsningene. For A og B′ veier det første tyngst. En lavere rente sprer også beregningene: de typiske blir verre, og de som lå nær null, går over null. Hvor mye hvert ledd gir, er ikke regnet ut med de frosne tallene.",
"3": "Kravet for kraftverket i A blir lavere, men medianen for A faller. Kraftverket i A selger ikke kraft, så det har bare kostnader, og en lavere rente gjør nåverdien av dem mer negativ, mens inntekten som skal betale kraften, fortsatt regnes med kravet for regnekraft.",
"4": "Kravet for kjernekraft på nettet blir høyere, men medianen for B og B′ stiger. Salget minus drift betaler ikke tilbake investeringen, som kommer i årene før oppstart; med høyere rente krymper nåverdien av investeringen mer enn nåverdien av salget, og tapet blir mindre. Et høyere krav gjør altså ikke kjernekraften bedre; det gjør et tap som ligger fram i tid, mindre i dagens kroner."
};
const MNAVN = {}; ST.maal.forEach(function (m) { MNAVN[m.id] = m.navn; });
function tegnFs() {

Binary file not shown.

Binary file not shown.

View file

@ -6,7 +6,8 @@ Denne rapporten beskriver en åpen matematisk modell som prøver om AI-datasentr
staten, kan bli en inntektskilde for Norge slik oljen har vært, og under hvilke betingelser. Modellen er
laget som en ærlig test, ikke som et innlegg for ett bestemt svar. Svaret kan bli at hypotesen holder, at
den holder bare under betingelser som kan navngis, eller at den ikke holder. Hva som skal til for hvert av
de tre svarene, ble skrevet ned og godkjent før noe ble regnet (\cref{sec:proving}).
de tre svarene, ble skrevet ned og godkjent før modellen ble regnet, og ligger i prosjektets egen åpne
git-historikk, ikke i et offentlig register (\cref{sec:proving}).
Modellen, kildebanken og verktøyene er åpne, slik at forskere, politiske rådgivere, beslutningstakere og
andre kan bruke dem og bygge videre på dem. Prosjektet er ikke kommersielt. Virksomheter som nevnes, er

View file

@ -5,8 +5,9 @@
Kan AI-datasentre som i prinsippet eies av staten, bli en inntektskilde for Norge slik oljen har vært?
Det er spørsmålet rapporten prøver. Slike datasentre kalles her \emph{tokenfabrikker}: datasentre som
eksporterer ferdig prosessert regnekraft. De trenger mye strøm, så rapporten spør også hvor strømmen skal
komme fra. Den sammenligner fem kraftløsninger på like vilkår, fra et eget kjernekraftverk for hvert
datasenter til ny fornybar kraft og trinnvis utbygging, og fire måter staten kan eie på.
komme fra. Den sammenligner fem kraftløsninger med samme modell og regler, fra et eget kjernekraftverk uten
nettforbindelse for hvert datasenter til ny fornybar kraft og trinnvis utbygging, og fire måter staten kan
eie på.
Spørsmålet stilles fordi ambisjonen er høy. Den går ut på at staten binder store summer i datasentre og kraft,
og at satsingen kan bli «den nye oljen», med svært høy samfunnsøkonomisk gevinst, uten skade på miljøet og
@ -14,7 +15,7 @@ uten at husholdninger og virksomheter får astronomiske strømpriser eller mange
(\cref{sec:retningen}). En slik
ambisjon bør prøves med åpne tall før kapital bindes.
Prøven er gjort slik: målene og grensene for svaret ble skrevet ned og godkjent før noe ble regnet. De
Prøven er gjort slik: målene og grensene for svaret ble skrevet ned og godkjent før modellen ble regnet. De
gjelder lønnsomhet for samfunnet og for virksomheten, strømpris, forsyningssikkerhet, miljø og skala mot
petroleumsinntektene (\cref{sec:proving}). Alt som er usikkert, har et spenn, fra kildene der de finnes, og modellen er
regnet \tall{dommer.antall} ganger med ulike verdier innenfor spennene (\cref{sec:usikkerhet}). Hvert tall i
@ -38,8 +39,9 @@ budsjettet for 2024 for å gi egne forskere og KI-selskaper verktøyene de treng
satsinger er ikke vurdert; spørsmålet her er om staten kan tjene penger på å selge regnekraft til
utlandet.
Rapporten prøver én hypotese mot kriterier som ble skrevet ned og godkjent før noe ble regnet. Kriteriene
står i forhåndsregistreringen (\fil{FORHANDSREGISTRERING.md} i repoet). Dette kapitlet gjengir retningen
Rapporten prøver én hypotese mot kriterier som ble skrevet ned og godkjent før modellen ble regnet.
Kriteriene står i forhåndsregistreringen (\fil{FORHANDSREGISTRERING.md} i repoet). Den ligger i prosjektets
egen åpne git-historikk, ikke i et offentlig register, så datoene kan bare etterprøves der. Dette kapitlet gjengir retningen
for arbeidet og hypotesen ordrett derfra, og sier hvordan hypotesen ble endret før noe var regnet.
\Cref{sec:proving} gjengir målene og reglene som avgjør dommen.
@ -65,7 +67,8 @@ beslutningstakere og andre skal kunne bruke dem og bygge videre på dem.
\end{ordrett}
Setningene om hypotesen i retningen ble endret av prosjekteier 13.~november 2026 og ført inn
14.~november 2026, før noe var regnet (\cref{sec:endringen}).
14.~november 2026, før noe var regnet (\cref{sec:endringen}). «Lagring og fleksibilitet» er i modellen
vannmagasinene som finnes, fast effekt og utkobling; ny lagring bygges ikke (\cref{sec:losninger}).
\subsection{Tillegget til retningen}\label{sec:tillegget}
@ -151,8 +154,10 @@ dom (om dedikert kjernekraft er best) og setter en sammenligning uten dom i sted
er ren, sier den: «ingen resultater finnes, så endringen kan ikke være tilpasset et utfall. Den tar bort
særstillingen til én løsning og flytter ingen terskel.»
Utsagnet om at endringen ikke kan være tilpasset et utfall, er sterkere enn grunnlaget. Da hypotesen ble endret, hadde fagfellenes grove overslag
pekt mot at dedikert kjernekraft taper. Forhåndsregistreringen fører det som forbehold, og det er gjengitt
Utsagnet om at endringen ikke kan være tilpasset et utfall, er sterkere enn grunnlaget. Prosjektets
fagfeller er språkmodeller som har lest utkastene (\cref{sec:begrensning-gjennomgang}). Da hypotesen ble
endret, hadde deres grove overslag pekt mot at dedikert kjernekraft taper, og de åtte presiseringene av
kriteriene fra 12.~november 2026 ble også skrevet etter overslagene. Forhåndsregistreringen fører det som forbehold, og det er gjengitt
ordrett i \cref{sec:begrensning-gjennomgang}. Holdes resultatene mot den gamle regelen, ville del II vært
«holder ikke»: eget kjernekraftverk er best alene i \tall{dommer.m7.normalisering.t1.A.alene}~\% av
trekningene, mot grensen på 20~\%. Den sammenholdningen er gjort etter at resultatene forelå.

View file

@ -7,34 +7,51 @@
\paragraph{Svaret}
\textbf{Hypotesen holder ikke.} Statlig eide AI-datasentre som eksporterer regnekraft, lønner seg ikke for
Norge i scenarioet som teller, og de kan ikke bli en inntektskilde slik oljen har vært. Svaret gjelder alle
de fem kraftløsningene, og dommen over hypotesen er den samme i alle de seks scenarioene som er regnet. Regnekraft som
statlig eksportnæring i stor skala, «den nye oljen», bør derfor ikke stå som mål for staten. Dette kapitlet
de fem kraftløsningene, og dommen over hypotesen er den samme i alle de seks scenarioene som er regnet. Tapet
er størst med eget kjernekraftverk, et kraftverk uten nettforbindelse bygd av mange små reaktorer.
Kjernekraft på nettet taper mindre, og ny fornybar kraft minst. Regnekraft som statlig eksportnæring i stor
skala, «den nye oljen», bør derfor ikke stå som mål for staten; rådet bygger på et normalt marked. Dette kapitlet
sier hva som bærer svaret, hva som kunne endre det, og hva vi lærte. Tallene og reglene bak står i
\cref{sec:resultater}.
\paragraph{Hva som bærer svaret}
Scenarioet som teller, er normalscenarioet («\tall{dommer.teller}»): dagens knapphetspåslag i prisen på
regnekraft er borte før det første anlegget er i drift. Der er netto nåverdi for samfunnet, alle gevinster
minus alle kostnader for Norge regnet om til verdien i dag, negativ i medianen for alle fem løsningene. For
ett anlegg på 1\,000~MW er medianen \tall{dommer.normalisering.t1.C.nnv-median}~mrd.~kr med ny fornybar
kraft og \tall{dommer.normalisering.t1.A.nnv-median}~mrd.~kr med eget kjernekraftverk, og nåverdien er
positiv i høyst \tall{dommer.normalisering.t1.C.m1.andel}~\% av de \tall{dommer.antall} trekningene.
Andelen er regnet med prisen lik kostnaden til en konkurrent med samme avkastningskrav som Norge, så den
sier ikke hvor sannsynlig en høyere pris er. Hvor mye høyere prisen må være, viser pristerskelen (under). At påslaget er borte så tidlig, er et
valg uten kilde, låst før noe ble regnet; den eneste tallfestede analogien i kildebanken, inntjeningen i skipsfarten etter et
sjokk, peker samme vei \kilde{K13-016}. Kjernekraft på nettet kommer bedre ut enn eget kjernekraftverk, men gir også tap: medianen er
\tall{dommer.normalisering.t1.B.nnv-median}~mrd.~kr. Med kjernekraft, eget kraftverk eller på nettet, dekker prisen heller ikke kostnaden for virksomheten:
kostnaden per enhet regnekraft er under prisen i \tall{dommer.normalisering.t1.A.m2.andel}~\% av
trekningene (\cref{sec:res-dommer}).
regnekraft er borte før det første anlegget er i drift. At påslaget er borte så tidlig, er et valg uten
kilde, låst før modellen ble regnet; den eneste tallfestede analogien i kildebanken, inntjeningen i
skipsfarten etter et sjokk, peker samme vei \kilde{K13-016}. Der er netto nåverdi for samfunnet, alle
gevinster minus alle kostnader for Norge regnet om til verdien i dag, negativ i medianen for alle fem
løsningene. For ett anlegg på 1\,000~MW er medianen \tall{dommer.normalisering.t1.C.nnv-median}~mrd.~kr
med ny fornybar kraft, \tall{dommer.normalisering.t1.B.nnv-median}~mrd.~kr med kjernekraft på nettet og
\tall{dommer.normalisering.t1.A.nnv-median}~mrd.~kr med eget kjernekraftverk. Eget kjernekraftverk er i
modellen et kraftverk uten nettforbindelse, bygd av mange små reaktorer med reserveenheter, etter oppsettet
i en studie fra amerikanske nasjonallaboratorier \kilde{K12-001} (\cref{sec:kraftlosningene}). Med
kjernekraft, eget kraftverk eller på nettet, dekker prisen heller ikke kostnaden for virksomheten: kostnaden
per enhet regnekraft er under prisen i \tall{dommer.normalisering.t1.A.m2.andel}~\% av trekningene
(\cref{sec:res-dommer}).
Det som skiller regnekraft fra oljen, er at det norske fortrinnet har et tak. I modellen koster brikkene
det samme i Norge som andre steder, og kraften, der Norge står sterkt, er om lag 7~\% av årskostnaden for et anlegg \kilde{K08-K03}. Når knappheten er
borte, kan et norsk anlegg utover vanlig avkastning bare tjene forskjellen i kraftkostnad og lokale
kostnader (\cref{eq:S19}).
Det som skiller regnekraft fra oljen, er at det norske fortrinnet har et tak. I et normalt marked er prisen
på regnekraft i modellen satt lik kostnaden til en ny konkurrent med vanlig avkastning, og kraften, der
Norge står sterkt, er om lag 7~\% av årskostnaden for et anlegg \kilde{K08-K03}. Brikkene koster det samme
i Norge som andre steder, så utover vanlig avkastning kan et norsk anlegg bare tjene forskjellen i
kraftkostnad og lokale kostnader (\cref{eq:S19}). Gevinsten er dermed begrenset av måten prisen er satt på,
mens tapet er et funn: med ny fornybar kraft går anlegget i null i medianen hvis prisen er
\tall{terskler.pris.C.normalisering.pst-over}~\% høyere (under). Nåverdien er positiv i høyst
\tall{dommer.normalisering.t1.C.m1.andel}~\% av de \tall{dommer.antall} trekningene, men fordi prisen er
satt lik kostnaden, sier andelen ikke hvor sannsynlig en høyere pris er. Hvor tapet med ny fornybar kraft
kommer fra, viser følsomhetene bare delvis: uten eksportstansene blir medianen
\tall{folsomheter.rad.23.normalisering.C.median}~mrd.~kr, uten regelen som tar bort overskuddet til
kraftverkene på nettet (\cref{eq:S45}) \tall{folsomheter.rad.22.normalisering.C.median}~mrd.~kr og uten
skattekostnaden \tall{folsomheter.rad.17a.normalisering.C.median}~mrd.~kr (\cref{sec:res-folsomheter}).
Hvor mye hvert ledd bærer samlet, er ikke regnet.
Skalaen er langt unna. Grensen for at satsingen skal kunne kalles en ny olje, er 5~\% av statens netto
kontantstrøm fra petroleum, 26,8~mrd.~kr per år (\cref{sec:maalene}). Ett anlegg ligger under den i
\tall{dommer.normalisering.t1.A.m6.andel-ikke}~\% av trekningene, med alle løsningene. Flere anlegg løfter
kontantstrøm fra petroleum, 26,8~mrd.~kr per år (\cref{sec:maalene}). Telleren er bidraget til Norges
inntekt utover vanlig avkastning på kapitalen, nevneren statens kontantstrøm fra petroleum. Ett anlegg
ligger under grensen i \tall{dommer.normalisering.t1.A.m6.andel-ikke}~\% av trekningene, med alle
løsningene. Målt som statens kontantstrøm i første år med stabil drift, samme slags størrelse som
oljeinntektene, er ett anlegg i medianen \tall{eierformer.A.kontantstrom.median} til
\tall{eierformer.C.kontantstrom.median}~\% av dem. Det tallet trekker ikke fra avkastningen på kapitalen
som er bundet, og er ikke målet som ble satt på forhånd (\cref{sec:res-eierformer}). Flere anlegg løfter
ikke bidraget over grensen, og de lar seg ofte ikke bygge: et program på fem anlegg lar seg ikke bygge
innen 2100 i
\tall{dommer.normalisering.t5.TK.m1.ikke-byggbar} til \tall{dommer.normalisering.t5.TF.m1.ikke-byggbar}~\%
@ -43,32 +60,47 @@ kjernekraft og ny fornybar kraft som kan settes i drift per år, og hvor stor de
AI-servere ett program kan få. Dommene leses derfor av på trinnet med \tall{dommer.trinn} anlegg,
fordi regelen som ble satt på forhånd, gir det: ingen løsning når 5~\% av oljeinntektene i minst 80~\% av
trekningene uansett antall anlegg, og da leses dommene av på det største programmet der minst én løsning
har et år med stabil drift i minst 80~\% av trekningene (\cref{sec:res-dommer}).
har et år med stabil drift i minst 80~\% av trekningene (\cref{sec:res-dommer}). I et normalt marked
kunne grensen i praksis ikke nås, fordi prisen er satt lik kostnaden og store programmer ikke rekker å bli
bygget. Neiet til hypotesen kommer fra lønnsomheten.
\paragraph{Hva som kunne endre svaret}
Resultatet er ikke at regnekraft aldri kan lønne seg. Tre ting trekker den andre veien.
\begin{itemize}[leftmargin=1.2em,itemsep=1pt,topsep=2pt]
\item \emph{Renten.} Hovedberegningen bruker et markedsbasert avkastningskrav, fordi statens regler sier
det for statlig forretningsdrift i konkurranse med private (\cref{sec:kalkulasjonsrenten}). Regnet med
\item \emph{Renten.} Hovedberegningen bruker et markedsbasert avkastningskrav, fordi statens regler, slik
vi leser dem, sier det for statlig forretningsdrift i konkurranse med private (\cref{sec:kalkulasjonsrenten}). Regnet med
statens vanlige kalkulasjonsrente (4~\%, lavere etter 40 år) blir nåverdien positiv med ny fornybar kraft:
median \tall{folsomheter.rad.16.normalisering.C.median}~mrd.~kr, positiv i
\tall{folsomheter.rad.16.normalisering.C.m1-andel}~\% av trekningene (\cref{sec:res-folsomheter}). Da er
\tall{karusell.rad16.C.m1-andel}~\% av trekningene (\cref{sec:res-folsomheter}). Med kjernekraft på nettet
blir medianen \tall{folsomheter.rad.16.normalisering.B.median}~mrd.~kr, positiv i
\tall{karusell.rad16.B.m1-andel}~\%; med eget kjernekraftverk blir den lavere enn i hovedberegningen,
\tall{folsomheter.rad.16.normalisering.A.median}~mrd.~kr. En lavere rente gjør tapet i kraftverket, som
ligger år fram i tid, større i dagens kroner, og for eget kjernekraftverk veier det tyngre enn at prisen
fortsatt bygger på markedets krav; hvor mye hvert ledd gir, er ikke regnet ut med de frosne tallene. Da er
bare nåverdien regnet om: prisen på regnekraft bygger fortsatt på markedets avkastningskrav, og skalaen
er ikke regnet på nytt. At regelen for forretningsdrift i konkurranse med private gjelder her, er
er ikke regnet på nytt. Regnemåten betyr at staten bærer risikoen som markedet ellers tar betalt for; et
lavere krav også i markedet ville i modellen gitt lavere pris. At regelen for forretningsdrift i konkurranse med private gjelder her, er
prosjektets tolkning, og avkastningskravet for regnekraft er en åpen forutsetning. Får bare kraftverket
for kjernekraft på nettet et høyere avkastningskrav (rad~4 i \cref{tab:folsomheter}), blir medianen for
den løsningen bedre, ikke dårligere; det er ikke forklart hvorfor.
den løsningen bedre, ikke dårligere: salget betaler ikke tilbake reaktoren, og et tap som ligger år fram i
tid, blir mindre i dagens kroner jo høyere renten er. Av samme grunn trekker det i favør av eget
kjernekraftverk at hovedberegningen regner verket med avkastningskravet for regnekraft, som er høyere enn
kravet for kraft; med kravet for kraft blir medianen \tall{folsomheter.rad.3.normalisering.A.median}~mrd.~kr
(rad~3).
\item \emph{Knappheten.} Varer dagens knapphetspåslag i ti år etter at det første anlegget er i drift, er
medianen positiv med ny fornybar kraft
(\tall{dommer.knapphet.t1.C.nnv-median}~mrd.~kr, positiv i \tall{dommer.knapphet.t1.C.m1.andel}~\% av
trekningene), men fortsatt negativ med eget kjernekraftverk (\tall{dommer.knapphet.t1.A.nnv-median}~mrd.~kr).
trekningene), men fortsatt negativ med kjernekraft på nettet (\tall{dommer.knapphet.t1.B.nnv-median}~mrd.~kr,
positiv i \tall{dommer.knapphet.t1.B.m1.andel}~\%) og med eget kjernekraftverk
(\tall{dommer.knapphet.t1.A.nnv-median}~mrd.~kr).
Hypotesen holder ikke der heller: et ja krever vilkår som kan tallfestes med tall fra kildene, og det
kan de ikke her (\cref{sec:res-dommer,sec:res-terskler}). Scenarioet er konstruert og har ingen
kilde.
\item \emph{Prisen.} Utfallet avgjøres først av prisen på regnekraft, og den kan ingen kilde forutsi. I
normalscenarioet må den ligge \tall{terskler.pris.C.normalisering.pst-over}~\% over modellens forløp for at
et anlegg med ny fornybar kraft skal gå i null i medianen, og
\tall{terskler.pris.A.normalisering.pst-over}~\% over med eget kjernekraftverk (\cref{sec:res-terskler}). Etter prisen betyr dette mest: med eget
et anlegg med ny fornybar kraft skal gå i null i medianen,
\tall{terskler.pris.B.normalisering.pst-over}~\% over med kjernekraft på nettet og
\tall{terskler.pris.A.normalisering.pst-over}~\% med eget kjernekraftverk (\cref{sec:res-terskler}). Etter prisen betyr dette mest: med eget
kjernekraftverk skalafordeler, kostnadsoverskridelser og byggetid; med ny fornybar kraft hvor mye ny kraft
som kan settes i drift per år, et tall uten kilde.
\end{itemize}
@ -80,30 +112,45 @@ Resultatet er ikke at regnekraft aldri kan lønne seg. Tre ting trekker den andr
bindes: utfallet står og faller på en pris staten ikke rår over. At prisen bør være avtalt, er en
vurdering; modellen regner ikke en slik avtale. Trinnvis utbygging gir likevel større tap
i modellen i et normalt marked, og verdien av å kunne stoppe underveis er ikke regnet.
\item \emph{Kraften først. Eget kjernekraftverk ga størst tap.} Medianen er lavest av de fem løsningene, og
på like vilkår er eget kjernekraftverk best i \tall{dommer.m7.normalisering.t1.A.alene}~\% av trekningene
for ett anlegg, ny fornybar kraft i \tall{dommer.m7.normalisering.t1.C.alene}~\% (\cref{sec:res-m7}).
\item \emph{Kraften først. Eget kjernekraftverk uten nett ga størst tap, kjernekraft på nettet mindre.}
Med eget kjernekraftverk er medianen lavest av de fem løsningene, og sammenlignet med samme modell og
regler er det best i \tall{karusell.m7.t1.A.alene}~\% av trekningene for ett anlegg, ny fornybar kraft i
\tall{karusell.m7.t1.C.alene}~\% (\cref{sec:res-m7}).
Sammenligningen gir ingen dom (\cref{sec:m7}): den sier hvor ofte hver er best, og at en løsning er best,
betyr ikke at den lønner seg. Med fem anlegg er løsningene med kjernekraft oftere best
(\tall{karusell.m7.t5.kjernekraft} mot \tall{karusell.m7.t5.fornybar}~\%), fordi så mye ny fornybar kraft
sjelden lar seg bygge, men der er nåverdien nesten aldri positiv, uansett løsning. Strømprisen øker høyst 5~\% med ett anlegg i \tall{dommer.normalisering.t1.C.m3.andel}~\% av
trekningene, med alle fem løsningene, regnet som årspris, ikke time for time. Kjøpes kraften fra nettet uten at ny kraft bygges, gjelder det bare
i \tall{dommer.normalisering.t1.R.m3.andel}~\%, og forsyningssikkerheten svekkes i
\tall{dommer.normalisering.t1.R.m4.andel-ikke}~\%, per definisjon: «svekkes» betyr svakere enn uten
anlegget, uansett hvor lite. Med eget kjernekraftverk svekkes den ikke; med ny
fornybar kraft er den ikke svakere i \tall{dommer.normalisering.t1.C.m4.andel}~\% av trekningene. Hvor mye
ny kraft som kan bygges per år, bør utredes før noe annet.
sjelden lar seg bygge; der den kan bygges, er den best i \tall{dommer.m7.normalisering.t5.C.blant}~\%.
Hvor mye ny fornybar kraft og hvor mye kjernekraft som kan settes i drift per år, er åpne forutsetninger
uten kilde og svært ulike, 0,2 til 0,6~TWh ny fornybar kraft ut over det som bygges uansett mot 500 til
2\,000~MW kjernekraft, og sammenligningen med fem anlegg hviler på dem. Med fem anlegg er nåverdien nesten
aldri positiv, uansett løsning. Kravet til strømprisen holder i \tall{dommer.normalisering.t1.C.m3.andel}~\%
av trekningene med alle fem løsningene, fordi de er bygd med like mye ny kraft som datasenteret bruker;
prisen er regnet som årspris for landet samlet, ikke time for time og ikke der anlegget ligger. Kjøpes
kraften fra nettet uten at ny kraft bygges, holder kravet bare i \tall{dommer.normalisering.t1.R.m3.andel}~\%,
og den andelen hviler mest på hvor mye av uttaket som tar plassen til private datasentre i nettkøen, en
åpen forutsetning (førsteordens Sobol-indeks
\tall{terskler.betingelse.normalisering.R.m3.delta-V.minst.indeks}, \cref{sec:res-terskler}).
Forsyningssikkerheten svekkes da i \tall{dommer.normalisering.t1.R.m4.andel-ikke}~\%, per definisjon:
«svekkes» betyr svakere enn uten anlegget, uansett hvor lite. Med eget kjernekraftverk holder den per
definisjon, fordi verket ikke er koblet til nettet. De andre løsningene er vurdert uten tiltakene som er
betalt, og med ny fornybar kraft er den ikke svakere i \tall{dommer.normalisering.t1.C.m4.andel}~\% av
trekningene. Miljøkravet holder per definisjon for ny fornybar kraft. For kjernekraft holder det på vilkår,
fordi kjernekraften i én av tre kilder ligger over vind på land, 12 mot 11~g CO\textsubscript{2} per kWh
(\cref{sec:res-dommer}). Hvor mye ny kraft som kan bygges per år, bør utredes før noe annet.
\item \emph{Det tar lang tid.} Trinnvis utbygging i moduler på 100~MW har de første modulene i drift i
\tall{tidslinje.dom.TF.median-aar} i medianen. Et helt anlegg på 1\,000~MW er i drift i
\tall{tidslinje.dom.C.halv-1000-aar} med ny fornybar kraft og i \tall{tidslinje.dom.A.halv-1000-aar} med
kjernekraft (\cref{sec:res-tidslinje}).
kjernekraft (\cref{sec:res-tidslinje}). Årstallet for de første modulene bygger på forutsetningen om 3 til
7 år fra beslutning til første tilknytning til nettet som finnes, en åpen forutsetning. Årstallene for
kjernekraft bygger på forutsetningen om 15 til 25 år fra beslutning til første kjernekraft i drift
\kilde{K05-031, K05-032}.
\item \emph{Etterspørselen kan flytte.} Flytter 80~\% av AI-bruken utenom trening til brukernes egne
maskiner, faller medianen for den beste løsningen til mellom \tall{dommer.egne-lav.t1.C.nnv-median} og
\tall{dommer.egne-hoy.t1.C.nnv-median}~mrd.~kr, og ingen trekning gir positiv nåverdi
(\cref{sec:res-dommer}). Forløpet med egne maskiner er prosjektets eget og har ingen kilde.
\item \emph{Eierformen redder ikke regnestykket.} Ingen av de fire statlige eierformene kan anbefales framfor
de andre: nåverdien for staten er negativ med alle fire i \tall{eierformer.C.direkte.tap} til
\tall{eierformer.A.direkte.tap}~\% av trekningene. Om de er forenlige med statsstøttereglene i
de andre: nåverdien for staten er negativ med alle fire i \tall{karusell.eier.tap-lav} til
\tall{karusell.eier.tap-hoy}~\% av trekningene. Om de er forenlige med statsstøttereglene i
EØS-avtalen, står åpent: vi fant ingen kilde som vurderer det (\cref{sec:eierformene,sec:res-eierformer}).
\item \emph{Tett kunnskapshullene før store beslutninger.} De åpne tallene for inntekt per megawatt
regnekraft er selskapenes egne og spriker mye, og ingen kilde måler hvor mye av kapasiteten som blir
@ -120,13 +167,32 @@ Resultatet er ikke at regnekraft aldri kan lønne seg. Tre ting trekker den andr
Modellen er et regnestykke, ikke en offentlig utredning og ikke en anbefaling om å bygge. Den prøver
statlig eide datasentre som selger regnekraft til utlandet. Om private datasentre lønner seg for eierne,
er ikke prøvd; de ligger i nullalternativet, det satsingen sammenlignes med. Om private eiere ville gjort
det bedre enn staten, er heller ikke prøvd. Verdien av norsk kontroll over regnekraft for beredskap og
det bedre enn staten, er heller ikke prøvd. Modellens anlegg eier både bygget og brikkene; at staten bare
eier tomt, bygg og kraft og leier dem ut til andre som eier brikkene, er ikke prøvd. Verdien av norsk kontroll over regnekraft for beredskap og
suverenitet er ikke prissatt, og annen bruk av KI er ikke regnet. 40 av de 137
parameterne er åpne forutsetninger, der ingen kilde gir tallet direkte. Kildene er kontrollert av
språkmodeller, ikke av fagpersoner, og resultatene er ikke vurdert av eksterne fagfolk. To kjente begrensninger kan gjøre
kjernekraft dyrere enn i modellen: kostnadsoverskridelsene kan ha en tyngre hale enn modellen regner med, og
tilpasning av et utenlandsk reaktordesign til norsk regelverk er ikke regnet inn. To observasjoner i de
samme kildene trekker motsatt vei, mot raskere bygging og mer læring (\cref{sec:fagmiljoene,sec:begrensninger}).
Tre forenklinger trekker i favør av ny fornybar kraft: vannmagasinene jevner ut uten kostnad, verdien av
vindkraft faller ikke når mye bygges, og en kald uke uten vind er ikke regnet.
Det modellen ikke regner på, står i \cref{sec:ikke-med}.
språkmodeller, ikke av fagpersoner, og resultatene er ikke vurdert av eksterne fagfolk. Resultatfilene er
gjenskapt på samme maskin, ikke på en annen ennå.
Forbeholdene går begge veier. To kjente begrensninger kan gjøre kjernekraft dyrere enn i modellen:
kostnadsoverskridelsene kan ha en tyngre hale enn modellen regner med, og tilpasning av et utenlandsk
reaktordesign til norsk regelverk er ikke regnet inn. Andre forhold trekker i kjernekraftens favør. Kildene
viser mer læring og raskere bygging enn de frosne spennene tillater, og sluttkostnader for store reaktorer
under spennet i modellen, som er 10\,500 til 16\,500~USD/kW uten renter: Olkiluoto~3 i Finland endte på
7\,200 og Saeul~1--2 i Korea på 2\,700~USD/kW (2023-dollar, uten renter) \kilde{K28-008}. Emiratene, et
nytt kjernekraftland, bygde Barakah med en finansieringsramme på om lag 4\,400~USD/kW med renter, nominelt
\kilde{K03-011}, og fikk første enhet på nettet om lag tolv år etter vedtaket, under nedre grense på 15 år
i modellen \kilde{K05-034}; andre nye kjernekraftland har brukt lenger tid \kilde{K05-035, K05-038}. I om
lag halvparten av trekningene leses kostnadsspennet for kjernekraft som et budsjett, og en overskridelse
legges oppå. Leses det som sluttkostnad i alle trekningene, blir medianen
\tall{folsomheter.rad.1.normalisering.A.median}~mrd.~kr med eget kjernekraftverk og
\tall{folsomheter.rad.1.normalisering.B.median}~mrd.~kr med kjernekraft på nettet (rad~1 i
\cref{tab:folsomheter}). Observasjonene i kildene er ikke regnet inn (\cref{sec:fagmiljoene,sec:begrensninger}).
Tre forenklinger trekker i favør av ny fornybar kraft: vannmagasinene som finnes, jevner ut uten kostnad
(ny lagring bygges ikke), verdien av vindkraft faller ikke når mye bygges, og en kald uke uten vind er ikke
regnet. To trekker mot satsingen med alle løsningene: prisen på regnekraft har ingen renter i datasenterets
byggetid, mens Norge betaler bygget og de første brikkene før oppstart, og bare Norge kan rammes av stans i
leveransene av brikker. Hva Statnetts funksjonskrav for datasentre på nettet koster, er ikke regnet; det
trekker i favør av løsningene på nettet. Høyere strømpris regnes som en gevinst for landet så lenge Norge
eksporterer kraft, og hvem som betaler, er ikke regnet. Det modellen ikke regner på, står i
\cref{sec:ikke-med}.

View file

@ -4,7 +4,8 @@
Forhåndsregistreringen ble godkjent 11.~november 2026, før noe var regnet, og presisert samme dag etter to
uavhengige fagfellevurderinger og på nytt 12.~november 2026 etter tre til. Fagfellevurderingene er gjort av
språkmodeller (\cref{sec:begrensning-gjennomgang}). Den sier hva modellen skal
språkmodeller (\cref{sec:begrensning-gjennomgang}). Senere presiseringer og endringen av hypotesen,
13. og 14.~november 2026, står i \cref{app:endringer}. Forhåndsregistreringen sier hva modellen skal
teste, og hva som skal til for at hypotesen regnes som «holder», «holder under betingelser» eller «holder
ikke». Kriteriene endres ikke etter at resultater finnes uten at endringen og grunnen føres under
«Endringer» i forhåndsregistreringen, med dato (\cref{app:endringer}). Etter prosjektets egen arbeidsregel
@ -328,13 +329,16 @@ de andre til avklaringer i kapittel 16. Grunnen til hver står under «Endringer
oversikt. To av dem gjør hypotesen lettere å oppfylle i ett
tilfelle hver, og det står i forhåndsregistreringen: presisering~19 (trinnet med ett anlegg kan ikke være
25~\%-trinnet) og presisering~21 (ingen navngitt betingelse kreves for M6). Begge ble gjort før tallene
fantes, fordi de ikke kan gjøres etter uten å være en tilpasning.
fantes, fordi de ikke kan gjøres etter uten å være en tilpasning. I presisering~17 ville den andre
lesningen latt «holder under betingelser» i M5 virke som «holder ikke» for alle løsningene med
kjernekraft; den lesningen er ikke valgt (\cref{app:endringer}).
{\footnotesize
\setlength{\tabcolsep}{4pt}
\renewcommand{\arraystretch}{1.1}
\begin{xltabular}{\linewidth}{@{}P{7mm}LP{24mm}@{}}
\caption{Presiseringene i forhåndsregistreringen, med overskriften ordrett.}\label{tab:presiseringer}\\
\caption{Presiseringene i forhåndsregistreringen, med overskriften ordrett. Teksten i kursiv i rad~18 er
rapportens forklaring.}\label{tab:presiseringer}\\
\toprule
Nr. & Overskrift & Godkjent \\
\midrule
@ -362,7 +366,7 @@ Nr. & Overskrift & Godkjent \\
15 & Regnestykket «med fradrag» (regel 5). & 12.11.2026 \\
16 & Kjølevann og tidslinje. & 12.11.2026 \\
17 & Betingelsene når M5 er ett av målene. & 13.11.2026 \\
18 & Falt bort 2026-11-14. (Sa hva del~II var når ingen trinn lar seg bygge; del~II finnes ikke lenger.) & 13.11.2026, falt bort 14.11.2026 \\
18 & Falt bort 2026-11-14. \emph{(Sa hva del~II var når ingen trinn lar seg bygge; del~II finnes ikke lenger.)} & 13.11.2026, falt bort 14.11.2026 \\
19 & 25~\%-trinnet når ett anlegg alene når 25~\%. Endrer presisering 1 og 11. & 13.11.2026 \\
20 & Banene eierformene sammenlignes på. & 13.11.2026 \\
21 & Skalaen (M6) i betingelsene. Endrer presisering 17. & 13.11.2026 \\

View file

@ -5,8 +5,10 @@
\subsection{Kraftløsningene}\label{sec:kraftlosningene}
Modellen sammenligner fem kraftløsninger på like vilkår, et nullalternativ og en referansekjøring
(\cref{tab:alternativer}). Tabellen er ordrett fra forhåndsregistreringen.
(\cref{tab:alternativer}). Tabellen er ordrett fra forhåndsregistreringen. Modellen bygger ingen lagring for C;
hva «lagring og fleksibilitet» er i modellen, står under C nedenfor.
\needspace{14\baselineskip}
{\small
\setlength{\tabcolsep}{4pt}
\renewcommand{\arraystretch}{1.15}
@ -72,11 +74,11 @@ dimensjoneres; brytes det, står det. Ligningene står i \cref{sec:modellen}.
starten av fase~1, når en kjernekraftorganisasjon opprettes, IAEA minst 10--15 år fra starten av fase~1,
og utvalget minst 20 år fra forberedelsene starter \kilde{K05-032, K05-030, K05-031}. Modellen regner løpet fra beslutningen
og trekker det mellom 15 og 25 år, mest sannsynlig 20. Det andre er minste tid til
byggestart, 5 år \kilde{K05-032}, pluss byggetiden for en enhet, 6--17,1 år, mest sannsynlig 9,5
byggestart, 5 år \kilde{K05-032}, pluss byggetiden for en enhet, 6--17,1 år, mest sannsynlig 9,5, som i kilden er et snitt
\kilde{K03-K03, K03-046, K03-002}. Med beslutning i 2027 gir fordelingene første kjernekraft tidligst i
2042; forhåndsregistreringen sier tidligst rundt 2045. C og R venter på ny
nettkapasitet, 5--14 år, mest sannsynlig 10 \kilde{K17-012, K17-027, K06-039}, og kan da tidligst starte i
2032. Statnett stanset 9.~november 2026 nye reservasjoner for datasentre, og stansen ventes opphevet senest
nettkapasitet, 5--14 år \kilde{K17-012, K17-027, K06-039}, og kan da tidligst starte i 2032. Toppunktet i
fordelingen, 10 år, står ikke i postene; det er prosjektets valg (\cref{sec:begrensning-kilder}). Statnett stanset 9.~november 2026 nye reservasjoner for datasentre, og stansen ventes opphevet senest
1.~august 2027 \kilde{K06-016, K22-001}. Tilgangen på nett er derfor regnet som en ledetid og ikke som ledig
kapasitet. Bare løsning T kan starte innenfor nettet som finnes, før nytt nett er på plass (under).
@ -88,7 +90,10 @@ er analytikeres anslag, gjengitt av IEA, for hvor mange AI-servere minneproduksj
fram til 2027 \kilde{K01-015}. Tallet holdes fast for alle år, fordi ingen kilde sier hvor mye
produksjonen vokser etter det. Nye anlegg og utskifting av utstyr konkurrerer om de samme brikkene. Med en
sannsynlighet på 0--24~\% per år (åpen forutsetning) innføres en eksportregel som stanser leveranser av
brikker til store klynger i 1--4 år (åpen forutsetning). Et anlegg settes i drift det første året grensene rommer det. Står
brikker til store klynger i 1--4 år (åpen forutsetning). De to takene for kraft er begge åpne
forutsetninger uten kilde for Norge, og de er satt svært ulikt: takten for fornybar kraft kommer i tillegg
til utbyggingen i nullalternativet, mens nullalternativet ikke har kjernekraft. Sammenligningen av
løsningene med fem anlegg hviler på dem (\cref{sec:res-m7}). Et anlegg settes i drift det første året grensene rommer det. Står
ikke alle anleggene i banen i drift innen 2100, lar banen seg ikke bygge, og det er et resultat
(presisering~1). Løsningene med kjernekraft (A, B, $B'$, og T-K når den bygger kjernekraft) bærer i
tillegg de faste kostnadene for et nytt kjernekraftland (\cref{eq:S41}): myndighetenes andel, 20--25~\%
@ -116,6 +121,15 @@ til 1--2~mill.\ kr per årsverk (åpen forutsetning).
til det, så prisen og balansen for resten av landet endres ikke, og A trenger ingen dimensjonering mot
nettet. Ingen kilde tallfester avkastningskravet for et kraftverk med én kunde \kilde{K14-K03}.
Kontrakten med datasenteret senker kravet, mens risikoen for at verket står uten bruk, øker det.
Oppsettet, et kraftverk uten nettforbindelse bygd av mange små reaktorer med reserveenheter, er det
samme som i en studie fra tre amerikanske nasjonallaboratorier for et datasenter på 1\,000~MWe uten
nett: 21 enheter på 50~MWe for 99,995~\% tilgjengelighet. Med nettet som reserve klarer samme datasenter
seg i studien med én reaktor på 1\,000~MWe, til lavere kostnad per MWh \kilde{K12-001, K15-009}. Flere
av de inngåtte avtalene mellom kjernekraftverk og datasentre leverer kraften via nettet \kilde{K12-012,
K12-015, K12-017}. En avtale om samlokalisering ved et amerikansk kjernekraftverk ble lagt om til
levering via nettet i april 2026, etter at regulatoren hadde avvist en utvidelse av lasten ved verket
\kilde{K12-016, K12-017}, og Kjernekraftutvalget skriver at løsninger uten nett senker kjøperens
verdsetting av kraften \kilde{K12-012}.
Hovedkjøringen bruker kravet for regnekraft; kravet for kraft som selges i markedet, vises som
følsomhet (linje~3 i \cref{tab:folsomheter}). Kostnaden står i \cref{sec:kraftverket}.
\item[B, kjernekraft koblet til nettet.] Kjernekraftverket selger til markedet, og datasentrene kjøper fra
@ -220,8 +234,10 @@ kjernekraft bare når resten av utbyggingen trenger minst én hel enhet.
Staten eier både datasentrene og kraftverkene. Eierformen er en egen dimensjon på tvers av
kraftløsningene. Forhåndsregistreringen nevner som kandidater som minst skal sammenlignes: direkte statlig
eierskap; ett heleid statlig selskap; statlig majoritet med børsnotert privat minoritet; et statlig
selskap i kombinasjon med statens direkte eierandeler, grunnrenteskatt og et fond for gevinsten; og andre
former kildene viser er relevante. Modellen sammenligner de fire første (spesifikasjonen kapittel~8).
selskap i kombinasjon med statens direkte eierandeler, grunnrenteskatt (særskatten i modellen) og et fond for gevinsten;
og andre former kildene viser er relevante. Modellen sammenligner de fire første (spesifikasjonen
kapittel~8). Kortnavnene er «direkte», «heleid selskap», «majoritet med børs» og «petroleumsmodellen»; i
tabellene står de som Direkte, Heleid, Majoritet og Petroleumsmodellen.
Dommen over hypotesen regnes med ett heleid statlig selskap (\cref{sec:dompermaal}). Eierformene
sammenlignes for hver av løsningene A, B, C, T-F og T-K for seg, på trinnet dommene leses av på, i
«normalisering», over trekningene der løsningens bane lar seg bygge (presisering~20).

View file

@ -2,7 +2,7 @@
\section{Modellen}\label{sec:modellen}
% =================================================================
Modellen er en års-oppløst tekno-økonomisk modell med usikkerhet. Kraftmarkedet er representert i
Modellen er en årsoppløst tekno-økonomisk modell med usikkerhet. Kraftmarkedet er representert i
redusert form: én kurve mellom kraftbalanse og pris per prisområde, to værår og én stresstime. Beslutningsåret
er $T_0 = 2027$, og analysen slutter i $T_s = 2100$. Alle beløp er reelle 2025-kroner. To regnemåter blandes
ikke: \emph{kontantstrøm}, der investeringer føres i året de betales og diskonteres, og som alle dommer som
@ -164,7 +164,9 @@ K03-045, K16-017}. $\xi_N$ trekkes én gang per trekning og gjelder hele program
Referanseklassen er etter alt å dømme regnet med renter \kilde{K16-015}, og $o_\xi$ har rangkorrelasjon 0,5 med $\tau_N$
(en åpen forutsetning \kilde{K03-006}); noe av forsinkelsen kan dermed være telt to ganger i
budsjettlesningen. Kostnadene for fornybar kraft er NVEs tall fra anlegg i drift, og NVEs tall for havvind
har 10~\% reserve; de får ingen overskridelsesfaktor. Halen i fordelingen for $o_\xi$ er omtalt i
har 10~\% reserve; de får ingen overskridelsesfaktor. Vannkraft har også overskridelser i referanseklassen, i
snitt 36,7~\% mot 102,5~\% for kjernekraft og 5,2~\% for vind \kilde{K03-045}; at fornybar kraft ikke får
noen, trekker i dens favør i trekningene der spennet for kjernekraft leses som budsjett. Halen i fordelingen for $o_\xi$ er omtalt i
\cref{sec:begrensning-fagmiljo}.
\paragraph{Kjernekraft: drift}
@ -516,8 +518,11 @@ driftsår (avklaring 15 og 42):
c_a(t_v) = \sum_{t} (1+\rho_D)^{-(t-t_v)}\, c_a(t) \Big/ \sum_{t} (1+\rho_D)^{-(t-t_v)},
\]
med $t$ fra $t_v$ til $t_v + L_H - 1$, uten år etter $T_s$ eller etter anleggets siste driftsår. Renter i
datasenterets byggetid er ikke med i den nivåiserte formen; byggetiden er ett til fire år, og forenklingen
gjelder Norge og konkurrenten likt. (S15) gir kostnaden i Norge og, med konkurrentens tall, prisen på
datasenterets byggetid er ikke med i den nivåiserte formen, og dermed heller ikke i prisen på regnekraft
(S18). I Norges kontantstrøm betales bygg og første årgang derimot jevnt over byggetiden, ett til fire år,
før oppstart (over); senere årganger betales året før de settes i drift, som i den
nivåiserte formen. Forenklingen trekker derfor mot satsingen i netto nåverdi, med alle løsningene. Hvor mye,
er ikke regnet (\cref{sec:begrensning-modell}; avklaring~143). (S15) gir kostnaden i Norge og, med konkurrentens tall, prisen på
regnekraft (S18).
% -----------------------------------------------------------------
@ -714,7 +719,8 @@ Avklaringene leser (S22) slik:
IT-levetid rekker til, $s_{\text{brikker}}\, G_{\text{server}}\, L_H / P_{IT}$ (med $G_{\text{server}}$
i MW), pluss det lageret rekker til når kraftsiden har holdt utbyggingen tilbake. Med spennene i
parameterfila er leveransene 250 til 1\,400~MW IT per år, og over én IT-levetid rekker de til mellom 0,75
og 9,8 anlegg. Det er lest ut av parameterfila og er ikke et modellresultat.
og 9,8 anlegg. Det er lest ut av parameterfila og er ikke et modellresultat. Nederst i spennene rekker de
altså ikke til ett helt anlegg, så grensen kan ramme også ett anlegg.
\item \emph{Anlegg uten brikker} (avklaring 26). En årgang som er utlevd og ikke kan byttes, står uten
inntekt til den byttes. Anlegget bruker da ikke kraft, men drift utenom kraft, kraftverkets faste
kostnader og ulykkeskostnaden løper, og kraftverk på nettet produserer og selger som før.
@ -723,7 +729,12 @@ Avklaringene leser (S22) slik:
K20-004, K20-K01} og $D_X$ jevn 1--4~år, begge åpne forutsetninger. Hvert år har ett jevnt fordelt tall
per trekning, fra en egen strøm av tilfeldige tall; en regel innføres når tallet er lavere enn $\phi_X$.
En regel som innføres mens en annen gjelder, forlenger stoppen. I år med stopp leveres ingenting, og
verken nye anlegg eller nye årganger starter. Dommen som teller, er den med $\phi_X$ trukket; dommen
verken nye anlegg eller nye årganger starter. Den øvre grensen for $\phi_X$ svarer til én hendelse på om
lag 4,1 år: et utkast fra 2026 som ville rammet store klynger også i allierte land, og som ble trukket
\kilde{K20-004, K20-K01}. Utkastet satte vilkår for lisens, ikke et forbud; modellen leser en regel som
full stans i leveransene, og det trekker mot satsingen. Under regelen fra januar 2025 var Norge blant
landene med de lempeligste vilkårene \kilde{K02-029}. Risikoen gjelder bare Norge, fordi konkurrenten er
i USA. Dommen som teller, er den med $\phi_X$ trukket; dommen
gitt at det ikke skjer, vises ved siden av.
\item \emph{Bygging når oppstarten forskyves} (avklaring 28). Byggingen følger året anlegget faktisk
starter, også når brikkene forskyver det. Modellen regner altså som om forsinkelsen er kjent når
@ -767,7 +778,8 @@ kraftprisen i kontantstrømmen bygger på (spesifikasjonen kapittel~5).
NVE har regnet tolv scenarioer for 2035, med kraftbalanse for Norge og pris per prisområde \kilde{K21-086,
K21-087, K06-021, K06-005}. For hvert område og for Norge samlet tilpasses en rett linje
$P_z(S) = \alpha_z + b_z S$ med minste kvadraters metode til de tolv punktene, der $S$ er Norges
kraftbalanse i et normalår (produksjon minus forbruk, i TWh). Rapporten oppgir ikke prisnivået. Prisene
kraftbalanse i et normalår (produksjon minus forbruk, i TWh). Hellingen er tatt på tvers av NVEs
scenarioer, som skiller seg i mer enn kraftbalansen; den er derfor ikke en målt marginal prisvirkning. Rapporten oppgir ikke prisnivået. Prisene
er tatt som 2023-kroner, fordi Basis er lik NVEs langsiktige analyse i 2023-kroner, og regnet om til
2025-kroner \kilde{K21-086}. Utenfor området NVE har regnet på, brukes
\begin{equation}
@ -852,7 +864,8 @@ timene og taper inntekten for dem.
\end{equation}
$F_a$ er i kroner per år for hele programmet. $c_{\text{fast}}$ er kostnaden for ny fast effekt (en
gassturbin, per MW som kan regnes med): PERT 1\,296\,000/1\,421\,000/1\,461\,000~kr/MW per år
\kilde{K17-021, K17-K02}. $c_{\text{res}}$ er kostnaden for reserve mot utfall av største enhet: jevn
\kilde{K17-021, K17-K02}. Gassturbinen er en prisreferanse for fast effekt; utslipp fra drift i de knappe timene og
leveringstiden er ikke regnet. $c_{\text{res}}$ er kostnaden for reserve mot utfall av største enhet: jevn
800\,000--1\,696\,000~kr/MW per år \kilde{K17-017, K17-020}. $h_{\text{knapp}}$ er timene per år
datasenteret må koble ut: jevn 0--200, en åpen forutsetning \kilde{K17-014, K15-010}. Andre arm er den
tapte inntekten: prisen per MW IT og time, delt på $\mathit{PUE}$ for å gjelde per MW uttak. $F_a$ regnes
@ -883,7 +896,8 @@ førsteordens virkninger), er $Q^{S} - D = S^{0}$ før og etter, og
i kroner per år, med $\Delta \bar p$ som prisendringen for Norge samlet i kr/MWh og $S^{0}$ i MWh. Sammen
med kontantstrømmen gir det endringen i Norges eksportinntekt. En prisoppgang i et land som eksporterer,
er en gevinst for landet samlet og et tap for forbrukerne. Hvor mye husholdninger og næringsliv betaler mer
eller mindre, er ikke regnet; M3 viser prisendringen per prisområde (\cref{sec:begrensning-modell}).
eller mindre, er ikke regnet; M3 viser prisendringen per prisområde slik den følger av Norges samlede
kraftbalanse, og hvor anlegget ligger, er ikke med (\cref{sec:begrensning-modell}).
$\Delta W$ regnes for normalår.
Flaskehalsinntekter mellom norske områder og på utenlandskablene, og statens utgifter til strømstøtte, er
ikke med.
@ -1097,9 +1111,9 @@ egenkapitalkravet etter skatt; $r_{\text{stat}}$ er reell.
\toprule
Eierform & $s_e$ & $\vartheta_e$ & $\tau_{g,e}$ & $h_e$ & $r_{d,e}$ & $r_{q,e}$ & $\zeta_e$ \\
\midrule
Direkte statlig eierskap & 1 & 0 & 0 & 1 & $r_{\text{stat}}$ & -- & 1 \\
Heleid statlig selskap & 1 & 0 & 0 & 0,5 & 0,0516 & 0,10 & 1 \\
Majoritet med børsnotert minoritet & 0,67 & 0 & 0 & 0,5 & 0,055 & 0,115 & 1 \\
Direkte & 1 & 0 & 0 & 1 & $r_{\text{stat}}$ & -- & 1 \\
Heleid & 1 & 0 & 0 & 0,5 & 0,0516 & 0,10 & 1 \\
Majoritet & 0,67 & 0 & 0 & 0,5 & 0,055 & 0,115 & 1 \\
Petroleumsmodellen & 0,67 & 0,3 & 0,56 & 0,5 & 0,055 & 0,115 & 1 \\
\bottomrule
\end{tabular}

View file

@ -11,8 +11,9 @@ de andre trinnene i stigen og fordelingen av netto nåverdi.
Løsningene er de sju i forhåndsregistreringen (\cref{sec:kraftlosningene}). A, B, C, T-F og T-K er
kraftløsningene hypotesen gjelder. $B'$ er det samme kraftverket som i A, koblet til nettet, og er
sammenligningen regel~4 krever. R er referansekjøringen: statlige datasentre som kjøper kraft fra nettet
uten ny kraftproduksjon. $B'$ og R får dom per mål, men kan ikke gi «holder» for hypotesen og er ikke med i
stigen eller i sammenligningen M7 (presisering~3, avklaring~88).
uten ny kraftproduksjon. $B'$ og R regnes på alle trinnene i
stigen og får dom per mål, men kan ikke gi «holder» for hypotesen, teller ikke når trinnet dommene leses av
på, bestemmes, og er ikke med i sammenligningen M7 (presisering~3, avklaring~88).
\paragraph{Trinnet dommene leses av på}
Forhåndsregistreringen bruker en fast stige av programstørrelser: \tall{dommer.stige.0},
@ -76,23 +77,45 @@ nåverdi er høyest for C, \tall{dommer.normalisering.t1.C.m1.andel}~\%, og for
\tall{dommer.normalisering.t1.A.m1.andel}~\%. Medianen er negativ for alle: fra
\tall{dommer.normalisering.t1.C.nnv-median}~mrd.~kr for C til
\tall{dommer.normalisering.t1.Bm.nnv-median}~mrd.~kr for $B'$, og
\tall{dommer.normalisering.t1.A.nnv-median}~mrd.~kr for A. M2 er «holder ikke» for A, B og $B'$, og
\tall{dommer.normalisering.t1.A.nnv-median}~mrd.~kr for A. Prisen på regnekraft er i «normalisering» satt lik
kostnaden til en ny konkurrent med vanlig avkastning (S18), og kraft er om lag 7~\% av årskostnaden for et
anlegg (\cref{sec:inntekten}). Gevinsten er dermed begrenset av måten prisen er satt på, mens tapet er et
funn: med ny fornybar kraft går medianen i null med \tall{terskler.pris.C.normalisering.pst-over}~\% høyere
pris (\cref{sec:res-terskler}). Tapet er ikke delt opp etter ledd. Følsomhetslista viser noen av leddene hver
for seg: for C blir medianen \tall{folsomheter.rad.23.normalisering.C.median}~mrd.~kr uten eksportstans,
\tall{folsomheter.rad.22.normalisering.C.median} uten tilleggsregelen (S45) og
\tall{folsomheter.rad.17a.normalisering.C.median} uten skattekostnad (\cref{sec:res-folsomheter}). M2 er «holder ikke» for A, B og $B'$, og
«holder under betingelser» for C, R, T-F og T-K. M2 er et annet regnestykke enn M1: det regner blant annet
med nettariff og elavgift i stedet for marginale nettap, uten nettinvesteringen og tilleggsregelen (S45),
med bare utkoblingsarmen i (S47) og med hver årgang regnet over hele sin levetid, som en egen
investeringsbeslutning (\cref{sec:bedriftsokonomi}). Hvor mye hvert
ledd forklarer av avstanden mellom andelene i M1 og M2, er ikke regnet; rad~22 i følsomhetslista viser
virkningen av tilleggsregelen alene (\cref{sec:res-folsomheter}). M3 holder for alle unntatt R. M4 holder for A og $B'$, er «holder under betingelser»
virkningen av tilleggsregelen alene (\cref{sec:res-folsomheter}). M3 holder for alle unntatt R. For de andre følger det av dimensjoneringen: de
er bygd med minst like mye ny kraft som datasentrene bruker, og eget kjernekraftverk tar ingenting fra nettet,
så strømprisen kan ikke stige (\cref{sec:losninger}). Prisen i hvert område er regnet fra Norges samlede
kraftbalanse, ikke fra hvor anlegget ligger (\cref{sec:kraftsystemet}). For R hviler andelen nesten bare på
hvor mye av statens uttak som tar plassen til private datasentre i nettkøen, $\delta_V$, en åpen
forutsetning (indeks \tall{terskler.betingelse.normalisering.R.m3.delta-V.minst.indeks}); den
forutsetningen sparer nettinvestering bare for løsningene på nettet. M4 holder for A og $B'$, for A per
definisjon, fordi verket ikke er koblet til nettet. M4 vurderes uten tiltakene som er kostnadsført i M1,
og er «holder under betingelser»
for B, C, T-F og T-K, og «holder ikke» for R, som bygger ingen ny kraft og svekker kraftbalansen i
\tall{dommer.normalisering.t1.R.m4.andel-ikke}~\% av trekningene også med tiltak. M6 er «holder ikke» for
alle sju.
alle sju. Telleren i M6 er bidraget utover vanlig avkastning på kapitalen, og nevneren er statens netto
kontantstrøm fra petroleum. Målt som statens kontantstrøm i første år med stabil drift, samme slags
størrelse som nevneren, er ett anlegg i medianen \tall{eierformer.A.kontantstrom.median} til
\tall{eierformer.C.kontantstrom.median}~\% av oljeinntektene; det tallet er ikke målet som ble satt på
forhånd (\cref{sec:res-eierformer}). I et normalt marked kunne grensen i M6 i praksis ikke nås, fordi
prisen er satt lik kostnaden og store programmer ikke rekker å bli bygget (over og
\cref{tab:res-stige}). Neiet til hypotesen kommer fra lønnsomheten (M1).
M5 er en dom etter regler, uten trekninger og uten andeler. Den bygger på kildenes egne tall for utslipp
over livsløpet (i) og areal (ii), er den samme på alle trinn og i alle scenarioer, og gir C, R og T-F
«holder» per definisjon (presisering~7, 9 og~13; avklaring~55, 68 og~88). For løsningene med kjernekraft
(A, B, $B'$ og T-K, som vurderes som kjernekraft) er M5 «holder under betingelser». I tabellen over
kildenes tall (avklaring~68) ligger kjernekraften høyere enn den laveste av vind på land og vannkraft i én
av de tre kildene, IPCC, men ikke over den høyeste verdien kilden oppgir for vind på land; (ii) holder,
av de tre kildene, IPCC (12 mot 11~g CO\textsubscript{2}-ekvivalenter per kWh for vind på land), men ikke
over den høyeste verdien kilden oppgir for vind på land; (ii) holder,
for var begge brutt, ville M5 vært «holder ikke» (presisering~9). Betingelsen er da at kildene der
kjernekraften ikke ligger høyere, legges til grunn, og den regnes som navngitt (presisering~17,
avklaring~93).

View file

@ -6,7 +6,7 @@ Trinnet er trinnet med \tall{eierformer.trinn}~anlegg, og grunnlaget for det er
(\cref{sec:res-dommer}). $B'$ og R er ikke med. De fire eierformene er de forhåndsregistreringen nevner
(\cref{sec:eierformene}): direkte statlig eierskap («direkte» i tabellene); ett heleid statlig selskap
(«heleid selskap»); statlig majoritet med børsnotert privat minoritet («majoritet med børs»); og et statlig
selskap i kombinasjon med statens direkte eierandeler, grunnrenteskatt og et fond for gevinsten
selskap i kombinasjon med statens direkte eierandeler, grunnrenteskatt (særskatten i modellen) og et fond for gevinsten
(«petroleumsmodellen»). Tallene står i \fil{eierformer.json}. Hele tabellen vises, slik
forhåndsregistreringen krever, i \cref{tab:res-eierformer-verdi,tab:res-eierformer-risiko}.

View file

@ -99,7 +99,10 @@ følsomhet og merkes som avvik fra rundskrivet. Kjernekraftutvalget (NOU 2026:~4
vurdering.
\end{ordrett}
Raden er altså et avvik fra rundskrivets regel for forretningsdrift i konkurranse, og den endrer bare
Raden er altså et avvik fra rundskrivets regel for forretningsdrift i konkurranse, slik vi leser statens
regler. Regnemåten betyr at staten bærer risikoen markedet ellers tar betalt for: prisen på regnekraft bygger
fortsatt på markedets avkastningskrav, og et lavere krav for alle ville i modellen også gitt lavere pris
(\cref{sec:proving}). Raden endrer bare
netto nåverdi, det vil si M1 og M7 (avklaring~118~b). \Cref{tab:res-fols-rad16} gir tallene for alle sju
løsningene. Med rundskrivets rente får C, R, T-F og T-K positiv netto nåverdi i over 80~\% av trekningene
og positiv median, så dommeordet i M1 blir «holder»; for B blir det «holder under betingelser». For A og
@ -126,7 +129,7 @@ I \fil{folsomheter.json} er ordet for hypotesen satt uten terskler, «så langt
(avklaring~112 og~116). Der står «holder under betingelser» når målene alene ikke avgjør; om betingelser
kan navngis, regnes ikke for radene. I \fil{dommer.json} er dommen satt med tersklene, og «holder under
betingelser» krever der at betingelsene kan navngis. De to kan derfor være ulike også for hovedkjøringen.
\Cref{tab:res-fols-del1} sammenligner dem: de er like i alle scenarioene unntatt «knapphet varer», der
\Cref{tab:res-fols-del1} sammenligner dem: de er like i alle scenarioene der en rad leses av, unntatt «knapphet varer», der
følsomhetstabellens egen hovedrad har «\tall{folsomheter.hoved.knapphet.del-i}» og \fil{dommer.json} har
«\tall{folsomheter.dommerfil.knapphet.del-i}», fordi ingen betingelser kan navngis der
(\cref{sec:res-dommer}).
@ -176,8 +179,14 @@ tilleggsregelen (avklaring~117, 118~a og 124~f). De to radene trekker i samme re
kraftverkets egne ledd gir høyere median, lavere rente gir lavere. Det samme mønsteret står i flate (c)
over alle trekningene, for alle fire løsningene med kjernekraft (\cref{sec:res-terskler}). For A i rad~3
følger retningen for kraftverkets del av ligningene: kraftverket i A selger ikke kraft, så leddene er bare
kostnader (S35), og en lavere rente gjør nåverdien av dem mer negativ. For B og $B'$ i rad~4 selger
kraftverket kraft, og der er fortegnet ikke forklart.
kostnader (S35), og en lavere rente gjør nåverdien av dem mer negativ, mens inntekten som skal betale krafta,
står i datasenterets kontantstrøm (S34) og fortsatt diskonteres med $\rho_D$. For B og $B'$ i rad~4 selger
kraftverket kraft, men salget minus drift betaler ikke tilbake investeringen, som kommer i årene før
oppstart, flere år etter 2027. Med en høyere rente krymper nåverdien av investeringen mer enn nåverdien av
nettosalget, og tapet blir mindre (\cref{sec:res-terskler}). Regnet ledd for ledd på det oppdiktede
grunnlaget var det investeringen som endret seg mest, og raden hevet netto nåverdi for B i alle trekningene
der. Et høyere krav gjør altså ikke kjernekraften bedre; det gjør et tap som ligger fram i tid, mindre i
dagens kroner.
\emph{Rad 23} tar bort eksportstansene, men medianen for A går fra
\tall{folsomheter.hoved.normalisering.A.median} til \tall{folsomheter.rad.23.normalisering.A.median}~mrd.~kr,
@ -186,8 +195,13 @@ og for $B'$ fra \tall{folsomheter.hoved.normalisering.Bm.median} til
\tall{folsomheter.rad.23.normalisering.Bm.median}~mrd.~kr; for C, R, T-F og T-K blir den høyere.
Spesifikasjonen sier hva en stans gjør: et anlegg uten brikker kjøper ikke kraft, og i A betales ikke
variabel drift, brensel og avfallsavgift, mens kraftverket på nettet produserer og selger som før
(avklaring~26), og byggingen følger året anlegget faktisk starter (avklaring~28). Hvorfor det gir lavere
median uten stans for de tre løsningene med kjernekraft og høyere for de andre, er ikke forklart.
(avklaring~26), og byggingen følger året anlegget faktisk starter (avklaring~28). Uten stans starter noen
anlegg tidligere. For A, B og $B'$, der kraftverket bærer et stort tap, kommer tapet da tidligere og blir
større i nåverdi fra 2027; for C, R og T veier det tyngre at anlegget slipper år uten last (avklaring~26). På
det oppdiktede grunnlaget endret netto nåverdi seg nesten bare i trekningene der starten ble flyttet, og der
i denne retningen. Med eksportregelen slått av i en kontroll på 200 av de frosne trekningene falt medianen
for A og steg den for T-K (fagfelleloggen del~30). Hvordan det fordeler seg på ledd med de frosne tallene,
er ikke regnet.
\emph{Rad 10} har merknaden at den kan trekke i favør av A, men medianen for A går fra
\tall{folsomheter.hoved.normalisering.A.median} til \tall{folsomheter.rad.10.normalisering.A.median}~mrd.~kr.
@ -203,9 +217,17 @@ og for T-F fra \tall{folsomheter.hoved.normalisering.TF.median} til
og at en bane kan komme annerledes ut på måter som ikke er opplagte: senere start gir senere utskifting, og
i T-K kan flere moduler stå igjen til kjernekraften. Hvorfor medianen stiger, er ikke forklart utover det.
I \emph{rad 16} blir medianen lavere for A og $B'$ samtidig som andelen med positiv netto nåverdi stiger
(\cref{tab:res-fols-rad16}). Det er ikke forklart. At medianen faller når renten blir lavere, er samme
mønster som i flate (c) (\cref{sec:res-terskler}).
I \emph{rad 16} blir medianen lavere for A og $B'$ samtidig som andelen med positiv netto nåverdi stiger,
for A fra \tall{folsomheter.hoved.normalisering.A.m1-andel} til
\tall{folsomheter.rad.16.normalisering.A.m1-andel}~\% (\cref{tab:res-fols-rad16}). Raden gjør to ting
samtidig. Den diskonterer alt med rundskrivets lavere rente, og det gjør et tap som ligger fram i tid, større,
slik som i flate (c) (\cref{sec:res-terskler}). Samtidig bygger prisen på regnekraft fortsatt på markedets
avkastningskrav (avklaring~118~b), så datasenteret får betalt kapitalen med en høyere rente enn den nåverdien
regnes med, og det løfter alle løsningene. For A og $B'$ veier det første tyngst. En lavere rente forstørrer
også alle nåverdiene, så trekningene sprer seg: de typiske blir verre, og de som lå nær null, går over null.
En kontroll på 200 av de frosne trekningene med begge rentene satt lavt, også i prisen, ga lavere median for
alle løsningene, også C og T-K, mens andelen positive steg (fagfelleloggen del~30). Oppdelingen er omtrentlig
og ikke regnet ledd for ledd med de frosne tallene.
\paragraph{Rader som ikke endrer noe tall}
Noen rader gir de samme tallene som hovedkjøringen til siste siffer for en løsning de gjelder. Det står
@ -234,8 +256,8 @@ en brøkdel av hovedkjøringens (avklaring~113); rad 35 er en egen bane som i fi
(M7) står for hver rad i \cref{tab:res-fols-m7}. \Cref{fig:res-fols-tornado} viser for A, B og C de åtte
radene som flytter medianen i M1 mest.
\begin{table}[htbp]
\centering\footnotesize\setlength{\tabcolsep}{4pt}
\begin{table}[H]
\centering\footnotesize\setlength{\tabcolsep}{2.8pt}
\caption{Hovedkjøringens tall i scenarioene radene leses av i, på trinnet dommene leses av på, fra
\texttt{folsomheter.json} (de er like tallene i \texttt{dommer.json}). Andelene er andelen trekninger som
oppfyller vilkåret for «holder» i målet; medianen er netto nåverdi i milliarder reelle 2025-kroner,
@ -292,7 +314,8 @@ for C (hovedkjøringen \tall{folsomheter.eier.hoved.C.heleid.verdi}~mrd.~kr), og
For C, T-F og T-K kommer alle fire formene da under risikogrensen; for T-F og T-K går
petroleumsmodellen ut fordi heleid selskap er bedre på alle de tre første kriteriene, og resten blir
rangert (\cref{tab:res-fols-eierrang}); for B blir verdien positiv, men
sannsynligheten for tap er \tall{folsomheter.eier.24.B.heleid.tap}~\%, over grensen. For A blir verdien
sannsynligheten for tap er \tall{folsomheter.eier.24.B.heleid.tap}~\%, over grensen, så ingen form er
rangert, og også der går petroleumsmodellen ut. For A blir verdien
lavere, \tall{folsomheter.eier.24.A.heleid.verdi}~mrd.~kr mot \tall{folsomheter.eier.hoved.A.heleid.verdi},
samtidig som sannsynligheten for tap faller til \tall{folsomheter.eier.24.A.heleid.tap}~\%.
I \emph{rad 28} faller verdien for direkte eierskap og heleid selskap, samtidig som sannsynligheten for
@ -303,9 +326,11 @@ mønsteret står for T-F og T-K. Spesifikasjonen sier at kostnadene ganges med $
trekningens $\epsilon_e$ (avklaring~122), og forhåndsregistreringen at effektiviteten legges inn «som et
spenn som også inneholder null». Kostnadene blir da lavere i noen trekninger og høyere i andre, og det
kan gi lavere forventet verdi og likevel færre trekninger med tap. Det er ikke kontrollert her. Det samme
mønsteret, lavere verdi og lavere sannsynlighet for tap, står for A i rad 24; det er ikke forklart. At
verdien faller når staten regner med en lavere rente, er samme mønster som i flate (c)
(\cref{sec:res-terskler}).
mønsteret, lavere verdi og lavere sannsynlighet for tap, står for A i rad 24. Verdien er et snitt over
trekningene. Med statens lave rente blir tapene i trekningene som taper mest, større i nåverdi og trekker
snittet ned, mens trekningene som lå nær null, går over; prisen på regnekraft bygger fortsatt på markedets
krav, slik som i rad 16. Det er trolig samme mekanisme som i rad 16 og flate (c)
(\cref{sec:res-terskler}), men den er ikke regnet ledd for ledd for eierformene.
\emph{Rad 25} endrer bare de to formene med private eiere, og \emph{rad 28} bare direkte eierskap og
heleid selskap; ingen av dem får noen form under risikogrensen. \emph{Rad 29} endrer bare oppgjøret for
formene med private eiere, og ingenting for C og T-F.

View file

@ -61,7 +61,8 @@ trekning. «Best alene» for de fem, «plassen er delt» og «ingen lar seg bygg
ylabel={Andel av alle trekningene, \%}, ymin=-3, ymax=103,
ymajorgrids, grid style={black!12},
tick label style={font=\small}, label style={font=\small},
legend style={font=\small, at={(0.5,1.02)}, anchor=south, legend columns=4, draw=none},
legend style={font=\small, at={(0.5,1.02)}, anchor=south, legend columns=4, draw=none,
/tikz/every even column/.append style={column sep=8pt}},
legend cell align=left,
/pgf/number format/.cd, use comma, 1000 sep={\,}]
\addplot[cA, thick, mark=*, mark options={solid}] table[x=pos, y expr=\thisrow{A}*100] {generert/dommer-m7.dat};

View file

@ -244,7 +244,7 @@ et datasenter kjølt med sjøvann skal etter kapittel~17.5 vises ved siden av, m
xtick={2030,2050,2070,2090}, x tick label style={/pgf/number format/1000 sep={}},
y tick label style={/pgf/number format/.cd, use comma, 1000 sep={\,}},
tick label style={font=\scriptsize}, label style={font=\footnotesize},
legend pos=south east, legend style={font=\scriptsize}, legend cell align=left,
legend style={font=\scriptsize, at={(0.66,0.03)}, anchor=south}, legend cell align=left,
]
\addplot[cA, thick] table[x=aar, y expr=\thisrow{Adc}/1e6] {generert/miljo-vann.dat};
\addlegendentry{A, B, $B'$}

View file

@ -95,7 +95,7 @@ $\varepsilon_d$, som ikke har kilde, og teller aldri som betingelse.
En terskel finnes for en løsning og et mål med dommen «holder under betingelser»: den minst strenge
betingelsen på én trukket størrelse, innenfor 10- og 90-persentilen, som målet holder under (avklaring 108).
\Cref{tab:res-terskler-normalisering} viser alle tersklene i «normalisering». \emph{Sannsynlighet} er andelen
av alle trekningene der betingelsen er oppfylt, og \emph{andel oppfylt} andelen av dem der vilkåret for
av alle trekningene der betingelsen er oppfylt, under de frosne fordelingene, og \emph{andel oppfylt} andelen av dem der vilkåret for
«holder» i målet er oppfylt. \emph{Indeks} er Sobol-indeksen for størrelsen og vilkåret, \emph{kilde} om
størrelsen har status «kilde» i parameterfila, \emph{påvist} om virkningen består kjikvadratprøven
(presisering~22), og \emph{begge halvdeler} om målet også holder under betingelsen i begge halvdelene av
@ -222,18 +222,24 @@ enn i den laveste, i hver klasse av reaktorkostnaden. For A og $\rho_D$ er media
lave krav er altså ikke det gunstige. Rad 3, 4, 16 og 24 i følsomhetslista viser samme mønster
(\cref{sec:res-folsomheter}).
Dette er kjent om grunnen. Avkastningskravene er rentene netto nåverdi diskonteres med (S26): $\rho_D$ for
datasenteret og, i A, for kraftverket, og $\rho_N$ for kraftverk på nettet og for virkningene for resten av
Norge (avklaring~36). Alle leddene diskonteres fra 2027, også investeringene, som kommer flere år senere.
Et høyere krav gjør alle leddene mindre, de sene mest. I A selger kraftverket ingen kraft, så
kontantstrømmen for kraftverket består bare av kostnader (S35), og nåverdien av den blir mindre negativ
når $\rho_D$ stiger. Den delen av retningen følger av ligningene. For datasenteret virker $\rho_D$ også på
prisen på regnekraft, gjennom konkurrentens kapitalkostnad (S15 og S18), og der gir ligningene alene ingen
retning. For kraftverkene på nettet i B, $B'$ og T-K, som selger kraft, avhenger retningen av hvor store
kostnadene og inntektene er år for år, og når de kommer. Resultatfilene har ikke kontantstrømmen år for
år, så det er ikke vist. $\rho_N$ og $\rho_D$ er dessuten trukket med rangkorrelasjon 0,5 (kapittel~11 i
spesifikasjonen), så flaten for $\rho_N$ viser også noe av virkningen av $\rho_D$. Retningen for hele
medianen er derfor ikke forklart.
Grunnen ligger i hvordan nåverdien regnes. Avkastningskravene er rentene netto nåverdi diskonteres med (S26):
$\rho_D$ for datasenteret og, i A, for kraftverket, og $\rho_N$ for kraftverk på nettet og for virkningene for
resten av Norge (avklaring~36). Alt diskonteres fra 2027, mens ingenting tjener penger før anleggene starter,
og investeringene kommer flere år senere. Taper en bane penger, og ligger tapet ikke tidligere enn
inntektene, blir tapet mindre i dagens kroner når renten er høyere, og større når den er lavere. For A er
det slik: reaktoren betales i årene før oppstart, kraftverket selger ikke kraft (S35), og inntekten som skal
betale krafta, er konkurrentens kraftkostnad i prisen (S15 og S18). Prisen på regnekraft stiger med
$\rho_D$, men kapitaldelen av den og datasenterets egen investering følger hverandre: for en årgang som går
hele levetiden, er nåverdien av kapitaldelen lik investeringen, uansett rente. Det som blir igjen, er tapet;
på det oppdiktede grunnlaget lå det i kraftverket. For B, $B'$ og T-K flytter $\rho_D$ medianen lite; mønsteret i flaten for $\rho_D$ kommer for
dem av at $\rho_N$ og $\rho_D$ er trukket med rangkorrelasjon 0,5 (kapittel~11 i spesifikasjonen). $\rho_N$
virker på samme måte: leddene som diskonteres med den (kraftverk på nettet, nett, effektkostnad og
virkningene for resten av Norge), er samlet en kostnad som ligger år fram i tid, og det gjelder også C, som
ikke har kjernekraft. En lavere rente forstørrer dessuten alle nåverdiene, så trekningene sprer seg: de
typiske blir verre, og de som lå nær null, kan gå over. Mekanismen er regnet ledd for ledd og år for år på
det oppdiktede grunnlaget, og en kontroll med de committede verktøyene på 200 av de frosne trekningene, med
faste verdier for $\rho_D$ og $\rho_N$, ga samme retning (fagfelleloggen del~30; tallene står ikke i
resultatfilene). Hvordan tapet fordeler seg på ledd med de frosne tallene, er ikke regnet.
Den høyeste andelen positive trekninger i en rute er
\tall{terskler.flate-b.R.andel}~\% (R, flate (b)). I flate (c) går klassene for $\rho_D$ fra median
@ -261,6 +267,7 @@ regel~7 krever: $^{\ast}$ er en åpen forutsetning uten kilde, $^{\dagger}$ et v
har størrelsen kilde. For utfall der alle trekningene har samme verdi, har indeksen ingen verdi
(\cref{tab:res-sobol-uten}). Indeksene for de andre størrelsene står i \fil{terskler.json}.
\needspace{14\baselineskip}
{\footnotesize
\setlength{\tabcolsep}{2pt}
\begin{xltabular}{\linewidth}{@{}llcccc@{}}

View file

@ -216,8 +216,12 @@ eksportregelen slått av og en levetid lengre enn horisonten hadde anlegget last
alle trekningene, og med regelen på falt hvert år uten last før slutten av levetiden i et år med stopp. Ikke
kontrollert: hvor stor del av fallet hver regel gir på de frosne tallene. Modellen er ikke kjørt på dem for
dette, og ingen resultatfil deler andelen etter grunn. At stoppene gir taket og levetiden fallet, er derfor
vår lesning av reglene og tallene over. Det er heller ikke forklart hvorfor andelen i T-F og T-K faller litt
fra toppen i \tall{tidslinje.dom.TF.toppaar} i årene før noen modul kan ha nådd slutten
av levetiden (den første er i drift i \tall{tidslinje.dom.TF.forste-aar}, og levetiden er minst
\tall{tidslinje.param.LN-lav} år). En mulig grunn er at moduler som får byttet utstyret samme år etter en stopp, deretter går ut
samtidig; det er ikke vist.
vår lesning av reglene og tallene over; at stoppene gir taket, er bekreftet i en kontroll (under). Andelen i T-F og T-K faller litt fra toppen i
\tall{tidslinje.dom.TF.toppaar} i årene før noen modul kan ha nådd slutten av levetiden (den første er i
drift i \tall{tidslinje.dom.TF.forste-aar}, og levetiden er minst \tall{tidslinje.param.LN-lav} år). Det
kommer av eksportstoppene: like etter utbyggingen har alle modulene nytt utstyr, senere må det byttes hvert
\tall{tidslinje.param.LH-lav} til \tall{tidslinje.param.LH-hoy} år, og et bytte som faller i en stopp, gir
år uten last (avklaring~26 og~27). En kontroll med de committede verktøyene på 200 av de frosne
trekningene, med sannsynligheten for eksportregel satt til null, ga 100~\% hvert år fra utbyggingen til
levetiden begynte å gå ut, for T-K og for A (fagfelleloggen del~30; tallene står ikke i resultatfilene).
Hvordan fallet fordeler seg over årene, er ikke regnet ut.

View file

@ -11,25 +11,32 @@ frosset i parameterfila, og om spennet dekker kildene. Kapitlet gjengir ingen re
parameter bygger på område 27. To funn dekkes ikke av spennene i parameterfila; de står som kjente
begrensninger i \cref{sec:begrensning-fagmiljo}. Raden om kostnadsnivået for kjernekraft i
\cref{tab:fagmiljo} og avsnittet om det i \cref{sec:fagmiljo-storrelse} ble lagt til 23.~november 2026, etter at
resultatene forelå. De bygger også på område 03 og 28 og endrer ingen parameter. Tallene for Olkiluoto~3 og Korea i raden
ligger under spennet; de står også i \cref{sec:begrensning-fagmiljo}.
resultatene forelå. De bygger også på område 03, 16 og 28 og endrer ingen parameter. Emiratene, Polen og Tyrkia i
\cref{sec:fagmiljo-tidslinje} ble lagt til samme dag, fra område 05 og 27. Tallene for Olkiluoto~3, Korea og
Barakah i raden ligger under spennet; de står også i \cref{sec:begrensning-fagmiljo}.
Tallene gjengis slik postene har dem etter kontrollen. Valuta og prisår er ikke regnet om. Det et selskap
skriver, står som selskapets syn. \Cref{tab:fagmiljo} sammenfatter sammenligningen.
\begin{table}[htbp]
\centering\small
\caption{Hva kildene i område 27 sier, holdt mot de frosne fordelingene (fagfelleloggen del~19). PERT er
oppgitt som lav\,/\,modus\,/\,høy. Raden om kostnadsnivået er lagt til 23.~november 2026, etter
resultatene, fra område 03, 27 og 28.}
\label{tab:fagmiljo}
\begin{tabularx}{\textwidth}{@{}>{\raggedright\arraybackslash}p{2.3cm}
{\small
\begin{xltabular}{\textwidth}{@{}>{\raggedright\arraybackslash}p{2.3cm}
>{\raggedright\arraybackslash}X
>{\raggedright\arraybackslash}p{3.2cm}
>{\raggedright\arraybackslash}p{3.3cm}@{}}
\caption{Hva kildene i område 27 sier, holdt mot de frosne fordelingene (fagfelleloggen del~19). PERT er
oppgitt som lav/modus/høy. Raden om kostnadsnivået og Emiratene i raden om tiden til første
kjernekraft er lagt til 23.~november 2026, etter resultatene, fra område 03, 05, 16, 27 og 28.}
\label{tab:fagmiljo}\\
\toprule
Tema & Hva kildene sier & Frosset & Vurdering \\
\midrule
\endfirsthead
\toprule
Tema & Hva kildene sier & Frosset & Vurdering \\
\midrule
\endhead
\bottomrule
\endfoot
Læring per dobling & Fra ingen læring etter de første enhetene til om lag 15~\% per dobling; IEAs
implisitte rate for SMR etter 2040, om lag 20~\%, kalles høy \kilde{K27-001, K27-004, K27-007 til
K27-011, K27-016, K27-047}
@ -39,31 +46,34 @@ skriver, står som selskapets syn. \Cref{tab:fagmiljo} sammenfatter sammenlignin
\addlinespace
Byggetid per enhet & Snitt 7~år (IEA) og 9,4--9,5~år (WNISR); enkeltenheter over 10~år; de raskeste i
modne serier om lag fire til fem år \kilde{K27-101, K27-138, K03-K03, K27-013, K27-046}
& $\tau_N$ PERT 6\,/\,9,5\,/\,17,1~år, samme for hver enhet
& $\tau_N$ PERT 6/9,5/17,1~år, samme for hver enhet
& Dekker snittene og de lange; de raskeste i modne serier ligger under nedre grense \\
\addlinespace
Fra beslutning til første kjernekraft i Norge & Statnett: ingen bidrag fram mot 2045; om lag 12~år i
Finland, som har kjernekraft; minst 10--15~år for nye land (IAEA) \kilde{K27-142, K27-134, K05-030}
& $\tau_F$ PERT 15\,/\,20\,/\,25~år
Finland, som har kjernekraft, og i Emiratene, et nytt land (oppnådd); minst 10--15~år for nye land
(IAEA) \kilde{K27-142, K27-134, K05-034, K05-030}
& $\tau_F$ PERT 15/20/25~år
& Dekker kildene for Norge \\
\addlinespace
Store mot små reaktorer & Om lag 15~\% lavere kostnad per kW ved dobbel størrelse, en eksponent på om
lag 0,76; første SMR antatt dobbelt så dyr per kW som en stor reaktor bygget i tide \kilde{K27-009,
K27-027}
& $\nu$ PERT 0,2\,/\,0,84\,/\,1,0
& $\nu$ PERT 0,2/0,84/1
& Dekker kildene \\
\addlinespace
Kostnadsnivå for kjernekraft & IEA, 2023-dollar per kW brutto, uten renter: Vogtle 14\,700,
Flamanville~3 11\,000, Hinkley Point~C nesten 16\,000 (budsjett, under bygging), Olkiluoto~3 7\,200,
Saeul~1--2 i Korea 2\,700~USD/kW; de første SMR-prosjektene om lag 10\,000, dobbelt så dyre per kW som
Saeul~1--2 i Korea 2\,700~USD/kW; Barakah~1--4 i Emiratene, et nytt kjernekraftland, ferdig med
«limited cost overrun» (IEA) og en finansieringsramme på om lag 4\,400~USD/kW, nominelt med renter i
byggetiden og første brensel, og 5\,700 i konsulentenes egen tabell (nominelt, ulikt grunnlag); de første SMR-prosjektene om lag 10\,000, dobbelt så dyre per kW som
store reaktorer bygget innenfor tid og budsjett; leverandørenes mål 2\,000--3\,400; fire små reaktorer
ved Darlington om lag 17\,400 kanadiske dollar per kW (utregnet), nominelt med renter, og første enhet
ventes ikke lenger ferdig i tide og innenfor budsjettet \kilde{K28-008, K27-027, K03-032, K03-033,
K28-010}
ventes ikke lenger ferdig i tide og innenfor budsjettet \kilde{K28-008, K28-011, K03-011, K16-009,
K27-027, K03-032, K03-033, K28-010}
& $c_{N,\text{ref}}$ jevn 10\,500--16\,500~USD/kW (2025-dollar), uten renter, med eierkostnader og
første brensel; overskridelse oppå når spennet leses som budsjett
& Vogtle og Flamanville~3 i spennet, Hinkley Point~C like under øvre grense, uten omregning av prisår;
Olkiluoto~3, Korea, en stor reaktor bygget innenfor tid og budsjett etter IEAs antakelse og
Olkiluoto~3, Korea, Barakah (nominelt, renter med), en stor reaktor bygget innenfor tid og budsjett etter IEAs antakelse og
leverandørenes mål under; Darlington kan ikke sammenlignes direkte (renter med) \\
\addlinespace
Kostnads\-overskridelse & Om lag 200 kjernekraftbygg: median 60~\%, 80-persentil 300~\% \kilde{K27-138}
@ -84,9 +94,8 @@ skriver, står som selskapets syn. \Cref{tab:fagmiljo} sammenfatter sammenlignin
\kilde{K27-137, K27-139}
& Ingen egen parameter; eierformene (avklaring 62 til 66)
& Gjelder eierformene, ikke en parameter \\
\bottomrule
\end{tabularx}
\end{table}
\end{xltabular}
}
% -----------------------------------------------------------------
\subsection{Læring per dobling}\label{sec:fagmiljo-laering}
@ -102,7 +111,7 @@ datasett for designspesifikke læringsrater. I DOEs uttrykkelig illustrative reg
enheten 50~\% av den første ved 15~\% læringsrate \kilde{K27-007}.
For små modulære reaktorer (SMR) venter to kilder 5--10~\% per dobling \kilde{K27-028, K27-029}. En rapport for det danske Energistyrelsen leser ut av
IEAs framskriving en læringsrate på 10~\% fram mot 2040 og om lag 20~\% etter 2040, kaller 20~\% høyt fordi
IEAs framskriving en læringsrate på 10~\% fram mot 2040 og om lag 20~\% etter 2040 i to av IEAs scenarier, kaller 20~\% høyt fordi
mye av kostnaden er sivile arbeider, og bruker selv 8, 10 og 12,5~\% på maskindelen \kilde{K27-016}.
Motstemmene kommer fra økonometriske studier. Med data fra Frankrike og USA er læringen bare signifikant
@ -156,7 +165,7 @@ AP1000-enhet ikke raskere enn den første \kilde{K27-046}. Ved Barakah ble tiden
anlegg med store reaktorer og samme kapasitet \kilde{K27-035}.
\paragraph{Frosset}
Byggetiden per enhet, $\tau_N$, er PERT 6\,/\,9,5\,/\,17,1~år: utfallstall for store reaktorer (verdenssnitt
Byggetiden per enhet, $\tau_N$, er PERT 6/9,5/17,1~år: utfallstall for store reaktorer (verdenssnitt
2016--2025, Kina, Flamanville~3) \kilde{K03-K03, K03-046, K03-002}. Den brukes også for små enheter, fordi
kortere byggetid for små enheter ikke er dokumentert; følsomhetslista halverer den for enheter under 300~MW i A
og $B'$. Den trukne byggetiden gjelder hver enhet i programmet. Modellen har ingen læring i byggetiden.
@ -186,17 +195,23 @@ sammen om lag 12~år, og at et nytt anlegg kan stå ferdig om lag 2035--2040 hvi
tidligst kan gi kraft i Norden i andre halvdel av 2030-tallet (selskapets syn) \kilde{K27-105}. Egypt, et nytt kjernekraftland, inngikk
mellomstatlig avtale med Russland i november 2015 og kontraktene i desember 2017, startet byggingen i juli
2022 og planlegger første enhet i drift innen utgangen av 2028, om lag 13 år etter avtalen. Det er planlagt, ikke oppnådd, og et russisk
statslån dekker 85~\% av den utenlandske delen av byggekontrakten \kilde{K27-135, K27-108}.
statslån dekker 85~\% av den utenlandske delen av byggekontrakten \kilde{K27-135, K27-108}. De forente
arabiske emirater, også et nytt kjernekraftland, vedtok programmet i 2008 og koblet første enhet til nettet i
august 2020, om lag 12 år senere; det er oppnådd \kilde{K05-034}. Kostnadene ble i hovedsak båret av
byggekonsortiet, med lån fra leverandørlandets eksportbank og statsstøttede lån \kilde{K27-117}. Andre nye
kjernekraftland har brukt lenger tid: Polen vedtok en plan i 2009 og venter første enhet i 2036
\kilde{K05-038}, og Tyrkia, som inngikk avtalen i 2010, hadde ingen enhet i drift i 2026 \kilde{K05-035}.
\paragraph{Frosset}
Tiden fra beslutning til første kjernekraft i drift, $\tau_F$, er PERT 15\,/\,20\,/\,25~år, fra utvalget og
Tiden fra beslutning til første kjernekraft i drift, $\tau_F$, er PERT 15/20/25~år, fra utvalget og
konsulentene \kilde{K05-031, K05-032, K05-030}. Byggetiden inngår, og med de frosne fordelingene kan første
kjernekraft tidligst komme i 2042 (\cref{sec:utbyggingen}).
\paragraph{Vurdering}
Spennet dekker kildene for Norge. Tidslinjene fra Finland og Egypt, om lag 12 og 13 år, ligger under nedre
grense, men gjelder et land som har kjernekraft, og et land der leverandørens hjemland er partner og
långiver.
Spennet dekker kildene for Norge. Tidslinjene fra Finland, Egypt og Emiratene, om lag 12, 13 og 12 år,
ligger under nedre grense. Finland har kjernekraft. Egypt og Emiratene er nye kjernekraftland der
leverandørens hjemland er långiver; i Egypt er tidslinjen planlagt, i Emiratene er den oppnådd. Polen ventes
å bruke lenger tid enn øvre grense.
% -----------------------------------------------------------------
\subsection{Store mot små reaktorer}\label{sec:fagmiljo-storrelse}
@ -213,7 +228,7 @@ ble bygget \kilde{K27-028}. Kjernekraftutvalget skriver at det gjenstår å se o
enheter kan oppveie stordriftsfordelene for store reaktorer \kilde{K27-035}.
\paragraph{Frosset}
Skalaeksponenten $\nu$ er PERT 0,2\,/\,0,84\,/\,1,0, med modus fra Argonnes kurve og nedre grense fra
Skalaeksponenten $\nu$ er PERT 0,2/0,84/1, med modus fra Argonnes kurve og nedre grense fra
litteraturspennet 0,2--0,75 (\cref{sec:kraftverket}). Følsomhetslista har 0,6. Eksponenten virker bare der enhetene har en annen
størrelse enn 1\,000~MW, i A og $B'$; i B og T-K er enhetene på 1\,000~MW.
@ -229,7 +244,13 @@ trekningene legges en overskridelse oppå (\cref{sec:fagmiljo-overskridelse}). I
prosjekter i 2023-dollar per kW brutto effekt, og noten til figuren sier at tallene er uten renter. Vogtle
steg til 14\,700 og Flamanville~3 til 11\,000, begge i spennet, og budsjettet for Hinkley Point~C, som er under
bygging, er nesten 16\,000, like under øvre grense før prisåret er regnet om. Olkiluoto~3 endte på 7\,200 og
Saeul~1--2 i Korea (tidligere Shin Kori~3--4) på 2\,700, under spennet \kilde{K28-008}. Etter IEAs antakelse
Saeul~1--2 i Korea (tidligere Shin Kori~3--4) på 2\,700, under spennet \kilde{K28-008}. Barakah~1--4 i
Emiratene, et nytt kjernekraftland, ble ifølge IEA ferdig med forsinkelser på linje med Saeul~1--2 og «limited
cost overrun» \kilde{K28-011}. Finansieringsrammen, med renter i byggetiden og første brensel, er om lag
4\,400~USD/kW nominelt; det er rammen, ikke en revidert sluttkostnad, og den ligger under spennet
\kilde{K03-011}. Konsulentenes egen tabell over rapporterte kostnader har Barakah på 5\,700, Akkuyu i Tyrkia
på 5\,600 og El Dabaa i Egypt på 6\,200~USD/kW; tallene er nominelle, fra ulike år og på ulikt grunnlag, og
kan ikke holdes direkte mot spennet \kilde{K16-009}. Etter IEAs antakelse
over koster en stor reaktor bygget innenfor tid og budsjett halvparten av de første SMR-prosjektene, altså
under spennet, men alle de fire vestlige prosjektene over gikk eller går over tid og budsjett \kilde{K27-027,
K28-008}. Leverandørenes 2\,000--3\,400~USD/kW for små reaktorer er mål, ikke oppnådde kostnader
@ -237,7 +258,7 @@ K28-008}. Leverandørenes 2\,000--3\,400~USD/kW for små reaktorer er mål, ikke
anslått til om lag 20,9~mrd. kanadiske dollar, nominelt og med renter, prisstigning og reserver. Regnet ut
per kW blir det om lag 17\,400 kanadiske dollar, og tallet kan ikke holdes direkte mot spennet. Eieren venter
ikke lenger at første enhet blir ferdig i tide og innenfor budsjettet \kilde{K03-032, K03-033, K28-010}.
Tallene for Olkiluoto~3 og Korea ble holdt mot spennet først etter resultatene og er ikke regnet inn
Tallene for Olkiluoto~3, Korea og Barakah ble holdt mot spennet først etter resultatene og er ikke regnet inn
(\cref{sec:begrensning-fagmiljo}).
% -----------------------------------------------------------------

View file

@ -60,20 +60,34 @@ enhet for enhet, andre ikke (\cref{sec:fagmiljo-byggetid}). Ble senere enheter i
raskere, ville de kommet i drift tidligere enn modellen regner med; det er ikke regnet.
\paragraph{Observasjoner som trekker motsatt vei}
Da \cref{sec:fagmiljoene} ble skrevet, etter at resultatene forelå, ble det funnet to steder der kildene i
område 27 ligger utenfor de frosne spennene i kjernekraftens favør. De sto ikke i sammenholdningen
prosjekteier fikk lagt fram før kjøringen (fagfelleloggen del~19), og ingen verdi er endret. En rapport for
det danske Energistyrelsen leser ut av IEAs framskriving en læringsrate for små reaktorer på om lag 20~\%
etter 2040 og kaller den høy \kilde{K27-016}; øvre grense for $\ell$ er 15~\%. De raskeste enhetene i modne
serier, i Korea og Kina, er bygd på om lag fire til fem år \kilde{K27-013, K27-101}; nedre grense for
byggetiden $\tau_N$ er seks år. Kjernekraft kan altså bli billigere og raskere enn modellen regner med i
de beste utfallene, slik de to funnene over sier at den kan bli dyrere i de dårligste. Runden med
fagmiljøene ble gjort etter parameterfrysen. Sammenholdningen prosjekteier fikk før kjøringen, viste bare
avvik som kan gjøre kjernekraft dyrere, og bare de to funnene over ble avgjort før kjøringen. Ingen av de
fire er regnet inn. Raden om kostnadsnivået i \cref{tab:fagmiljo}, lagt til 23.~november 2026, viser i
tillegg to sluttkostnader under spennet for $c_{N,\text{ref}}$: Olkiluoto~3 med 7\,200 og Saeul~1--2 i Korea
med 2\,700~USD/kW (IEA, 2023-dollar, uten renter) \kilde{K28-008}. De er fra område 28, ikke område 27, og
er heller ikke regnet inn.
Da \cref{sec:fagmiljoene} ble skrevet, etter at resultatene forelå, ble det funnet to tema, læring og
byggetid, der kildene i område 27 ligger utenfor de frosne spennene i kjernekraftens favør. De sto ikke i
sammenholdningen prosjekteier fikk lagt fram før kjøringen (fagfelleloggen del~19), og ingen verdi er
endret. Øvre grense for læringsraten $\ell$ er 15~\% per dobling, og tre anslag ligger over den
(\cref{sec:fagmiljo-laering}). En rapport for det danske Energistyrelsen leser ut av IEAs framskriving en
læringsrate for små reaktorer på om lag 20~\% etter 2040 i to av IEAs scenarier og kaller den høy
\kilde{K27-016}. NEA gjengir at kostnaden ved Barakah falt med over 50~\% fra første til fjerde enhet, som er
to doblinger; tallet er ekstrapolert \kilde{K27-001}. For en tvilling av Sizewell B som ble planlagt, men ikke
bygget, anslo NEA 37~\% lavere kostnad for de to enhetene; det er et planleggingsanslag \kilde{K27-004}.
De raskeste enhetene i modne serier, i Korea og Kina, er bygd på om lag fire til fem år
\kilde{K27-013, K27-101}; nedre grense for byggetiden $\tau_N$ er seks år. Kjernekraft kan altså bli
billigere og raskere enn modellen regner med i de beste utfallene, slik de to funnene over sier at den kan
bli dyrere i de dårligste. Runden med fagmiljøene ble gjort etter parameterfrysen. Sammenholdningen
prosjekteier fikk før kjøringen, viste bare avvik som kan gjøre kjernekraft dyrere, og bare de to funnene
over ble avgjort før kjøringen. Ingen av funnene eller observasjonene er regnet inn. Raden om kostnadsnivået i \cref{tab:fagmiljo}, lagt til 23.~november 2026, viser i
tillegg tre kostnader under spennet for $c_{N,\text{ref}}$: Olkiluoto~3 med 7\,200 og Saeul~1--2 i Korea
med 2\,700~USD/kW (IEA, 2023-dollar, uten renter) \kilde{K28-008}, og Barakah~1--4 i Emiratene, som IEA sier
ble ferdig med begrenset overskridelse, med en finansieringsramme på om lag 4\,400~USD/kW, nominelt og med
renter i byggetiden \kilde{K28-011, K03-011}. De er fra område 28 og 3, ikke område 27, og er heller ikke
regnet inn. Samtidig legges overskridelsen oppå kostnadsspennet i om lag halvparten av trekningene, der
spennet leses som budsjett (S46). Leses det som sluttkostnad i alle trekningene, blir medianen for
kjernekraft på nettet \tall{folsomheter.rad.1.normalisering.B.median} i stedet for
\tall{dommer.normalisering.t1.B.nnv-median}~mrd.~kr, og for eget kjernekraftverk
\tall{folsomheter.rad.1.normalisering.A.median} i stedet for
\tall{dommer.normalisering.t1.A.nnv-median}~mrd.~kr (rad~1 i følsomhetslista). Tre forenklinger i modellen
trekker på sin side i favør av ny fornybar kraft: magasinene som finnes, jevner ut uten kostnad,
vindkraftens verdi faller ikke når mye bygges, og en kald uke uten vind er ikke regnet
(\cref{sec:ikke-med-modell}, punkt~1 og~2).
% -----------------------------------------------------------------
\subsection{Kildene}\label{sec:begrensning-kilder}
@ -196,15 +210,20 @@ er heller ikke regnet inn.
kostnadsformelen (S15), som prisen på regnekraft regnes fra (S18), gir 8,756 mot Epochs
8,514~mrd.~USD per GW og år, 2,8~\% over \kilde{K08-K03}. Knapphetspåslaget og de konstruerte
prisscenarioene har ingen prøve mot kjente svar.
\item \emph{Eksportregelen er lest strengt.} Den øvre grensen for $\phi_X$ bygger på et utkast som satte
vilkår for lisens. Modellen leser en regel som full stans i leveransene i 1--4~år, og risikoen gjelder
bare Norge, fordi konkurrenten er i USA (\cref{sec:utbyggingen}). Det trekker mot satsingen med alle
løsningene.
\item \emph{Avstemmingen mot uavhengig kode har grenser.} Ligningene, dommene og følsomhetene er kodet
på nytt av uavhengige lesere fra teksten, uten prosjektets kode, og de to kodene er avstemt mot
på nytt av uavhengige lesere fra teksten, uten prosjektets kode; leserne er språkmodeller, og de to kodene er avstemt mot
hverandre. De to kodene er skrevet fra samme tekst, så en feil begge leser likt, oppdages ikke. Radene i
følsomhetslista er avstemt på programmer med 1, 2, 3 og 5 anlegg og på få oppdiktede
trekninger; trinnene med 10, 20 og 40 anlegg er ikke kjørt gjennom begge kodene. Kriteriet for kapitalkostnadens virkning i linje 28 av følsomhetslista er ikke avstemt,
fordi leserens kode mangler en faktor (fagfelleloggen del~16). Hva «uavhengig» betyr i prosjektet, står
i \cref{sec:begrensning-gjennomgang}.
\item \emph{Flere beregninger er ikke gjort.} Seks kritikere og hver sin kontrollør, alle språkmodeller,
leste rapporten 23.~november 2026, etter at resultatene forelå, og pekte på flere beregninger enn de sju
\item \emph{Flere beregninger er ikke gjort.} Seks kritikere og hver sin kontrollør, og
deretter seks nye lesere og hver sin kontrollør, alle språkmodeller, leste rapporten 23.~november 2026,
etter at resultatene forelå, og pekte på flere beregninger enn de sju
tingene spesifikasjonen sier skal rapporteres. Ingen av dem er gjort; en slik beregning ville være gjort
etter at resultatene forelå. Retningen står der den er kjent. (1) Et anlegg med en pris avtalt på forhånd for hele
driftstiden; i modellen er prisen fast bare for hver årgang brikker, gjennom utstyrets levetid
@ -213,15 +232,16 @@ er heller ikke regnet inn.
(\cref{tab:res-pristerskel}). Retningen avhenger av prisen i avtalen. (2) En høyere takt for ny fornybar
kraft enn 0,6~TWh per år, øvre grense i trekningene. Den ville latt C og T-F bygge raskere der det er
takten og ikke potensialet som binder. (3) Følsomheter som endrer
flere ting samtidig, for eksempel rundskrivets rente sammen med en dyrere konkurrent
(\cref{sec:res-folsomheter}). (4) Andre fordelinger og korrelasjoner enn de valgte
flere ting samtidig, for eksempel rundskrivets rente sammen med en dyrere konkurrent, eller en dyrere
konkurrent sammen med ingen eksportregel (\cref{sec:res-folsomheter}). (4) Andre fordelinger og korrelasjoner enn de valgte
(\cref{sec:trekningene}). (5) En kraftmarkedsmodell time for time, som ville tallfestet verdien av fast
kraft. Tre av utelatelsene i \cref{sec:ikke-med-modell}, punkt~1 og~2 (den faste
verdifaktoren, den kalde uken uten vind og de gratis magasinene), trekker i favør av løsningene med ny
fornybar kraft; for de andre er retningen ikke oppgitt. (6) Kontantstrømmen år for år for kjernekraft på nettet, som kunne
forklare hvorfor B og $B'$ kommer bedre ut med høyere avkastningskrav for kjernekraft
(\cref{sec:res-folsomheter,sec:res-terskler}).
Fortegnet er ikke forklart. (7) En prisregel der prisen settes av den marginale konkurrenten. En
fornybar kraft; for de andre er retningen ikke oppgitt. (6) Kontantstrømmen år for år med de frosne tallene. Retningen i
rad~3, 4 og 23 i følsomhetslista og i flate~(c) er forklart, og i rad~16 og 24 delvis
(\cref{sec:res-folsomheter,sec:res-terskler}): der en bane taper penger, blir tapet mindre i dagens
kroner med høyere rente og senere oppstart. Hvor stor del hvert ledd har, er bare regnet på det
oppdiktede grunnlaget. (7) En prisregel der prisen settes av den marginale konkurrenten. En
fagfelle pekte før frysen på at den som bygger neste anlegg i USA, kan betale mer for strøm enn snittet
for industri når strøm og nett er det som binder (fagfelleloggen del~2). En slik regel ville trukket i
favør av satsingen. Regnet er bare en konkurrent som betaler EU-snittet for de største kundene, som er
@ -229,7 +249,20 @@ er heller ikke regnet inn.
flate~(b) (\cref{sec:res-terskler}); en konkurrent som betaler mer enn det, er ikke regnet. (8) En kostnad for vindkraftens inngrep i
natur (\cref{sec:ikke-med-annet}, punkt~3). Utelatelsen trekker i favør av ny fornybar kraft. (9) En høyere
verdi for private datasentre som skyves ut av nettkøen enn elavgiften de ville betalt
(\cref{sec:samfunnsokonomi}). Et høyere tall ville gitt lavere netto nåverdi for satsingen.
(\cref{sec:samfunnsokonomi}). Et høyere tall ville gitt lavere netto nåverdi for satsingen. (10) Renter i datasenterets byggetid.
Prisen på regnekraft har dem ikke, men i Norges kontantstrøm betales bygg og første årgang over
byggetiden før oppstart (\cref{sec:datasenteret}; avklaring~143 i spesifikasjonen). Det trekker mot
satsingen med alle løsningene. (11) En følsomhet der statens uttak ikke tar plassen til noen private
datasentre i nettkøen ($\delta_V = 0$). Andelen for R i M3 hviler nesten bare på denne forutsetningen
(\cref{sec:res-dommer}), og den sparer nettinvestering bare for løsningene på nettet, men den koster
også elavgiften de private ville betalt (punkt~9); retningen for netto nåverdi er ikke oppgitt.
(12) Forventet netto nåverdi. Datafilene har medianen og persentilene, ikke snittet. Fordelingene har en
lang venstre hale (1-persentilen for eget kjernekraftverk er
\tall{dommer.normalisering.t1.A.nnv.p1}~mrd.~kr), så snittet kan ligge under medianen. (13) Halv
byggetid for små enheter sammen med fritt valg av enhetsstørrelse for eget kjernekraftverk; hver for seg
er de rad~9 og rad~8 i følsomhetslista. Kortere byggetid for små enheter er ikke dokumentert, så
hovedkjøringen gir dem samme byggetid som store. (14) En oppdeling av tapet med ny fornybar kraft
etter ledd. Følsomhetslista viser noen ledd hver for seg (\cref{sec:res-dommer}).
\end{itemize}
% -----------------------------------------------------------------

View file

@ -116,7 +116,9 @@ T bygges i moduler på 100~MW IT, og $t_N$ er året kjernekraften tidligst kan k
\item \emph{Lavere etterspørsel gir i modellen ikke billigere brikker}, og kostnaden til konkurrenten,
som prisen på regnekraft er regnet fra (\cref{sec:inntekten}), er uendret.
\item \emph{Statnetts funksjonskrav og den varslede konsesjonsordningen.} Hva de betyr for statlige
anlegg, er ikke kjent, og det er ikke med. Regjeringen skrev 9.~november 2026 at den «tar sikte på å
anlegg, er ikke kjent, og det er ikke med. Kostnaden kan bare ramme løsningene på nettet; eget
kjernekraftverk har ingen forbindelse til nettet og bærer i stedet et batteri for lastsprangene. At
kravene ikke er med, trekker derfor i favør av løsningene på nettet. Regjeringen skrev 9.~november 2026 at den «tar sikte på å
innføre en konsesjonsordning for eksisterende og framtidige datasentre» \kilde{K12-035}.
\item \emph{Brikker som leveres mens krafta holder utbyggingen tilbake, blir liggende på lager}
(avklaring 25). C og T-F har derfor nesten alltid brikker til utskifting, også rett etter en

View file

@ -123,6 +123,12 @@ DEL = re.compile(
TRYGG_KODE = re.compile(r"^[A-Za-z0-9._/-]+$")
# Printable ASCII but the characters \url cannot take (" is a shorthand in babel norsk).
TRYGG_URL = re.compile(r"^[!#-\[\]_a-z|~]+$")
# A URL template with a placeholder (ÅÅÅÅ-MM-DD, <dato>) is shown, not linked: it is not an address.
URL_MAL = re.compile(r"ÅÅÅÅ|<[^<>]+>")
# A space between a digit and a group of three digits is a thousands separator; it must not break.
TUSENSKILLE = re.compile(r"(?<=\d) (?=\d{3}(?!\d))")
# The report writes «NOU 2026: 4»; a few Kilde fields have «NOU 2026:4».
NOU = re.compile(r"\bNOU (\d{4}):(?=\d)")
SLUTT_URL = ".,;:!?"
# LaTeX for the ASCII characters that need it in running text.
@ -491,6 +497,14 @@ def tex_url(url: str, sted: str) -> str:
\href with the letters percent-encoded as UTF-8 in the link, and shown as it
stands in the entry, in the typewriter font of \url, with break points.
"""
if URL_MAL.search(url):
if TRYGG_URL.match(url):
return r"\nolinkurl{" + url.replace("%", r"\%").replace("#", r"\#") + "}"
return (
r"\texttt{"
+ "".join(tex_tegn(c, sted) + (r"\allowbreak{}" if c in "/.-=&?" else "") for c in url)
+ "}"
)
if TRYGG_URL.match(url):
return r"\url{" + url.replace("%", r"\%").replace("#", r"\#") + "}"
ascii_ = "".join(c if ord(c) < 128 else quote(c, safe="") for c in url) # noqa: PLR2004
@ -520,9 +534,9 @@ def tex_tekst(tekst: str, sted: str, *, kursiv: bool = True) -> str:
while True:
m = DEL.search(tekst, pos)
if not m:
ut.append(tex_tegn(tekst[pos:], sted))
ut.append(TUSENSKILLE.sub("~", tex_tegn(tekst[pos:], sted)))
return "".join(ut)
ut.append(tex_tegn(tekst[pos : m.start()], sted))
ut.append(TUSENSKILLE.sub("~", tex_tegn(tekst[pos : m.start()], sted)))
if m.group("kode") is not None:
kode = m.group("kode")
if not TRYGG_KODE.match(kode):
@ -548,6 +562,7 @@ def offentlig(post: Post) -> Post:
for monster, erstatning in ARBEIDSNOTATER:
tittel = monster.sub(erstatning, tittel)
kilde = monster.sub(erstatning, kilde)
tittel, kilde = NOU.sub(r"NOU \1: ", tittel), NOU.sub(r"NOU \1: ", kilde)
for felt, verdi in (("title", tittel), ("Kilde field", kilde)):
spor = ARBEIDSSPOR.search(verdi)
if spor:

View file

@ -332,7 +332,7 @@ def _logjevn(f: dict[str, object], _pert_form: int) -> str:
def _pert(f: dict[str, object], pert_form: int) -> str:
"""PERT low / mode / high; the form only when it is not the file's common one."""
punkter = " / ".join(tall(_felt(f, k)) for k in ("lav", "modus", "hoy"))
punkter = r"/\allowbreak{}".join(tall(_felt(f, k)) for k in ("lav", "modus", "hoy"))
form = _felt(f, "form")
tillegg = "" if form == pert_form else f", form {tall(form)}"
return f"PERT {punkter}{tillegg}"

View file

@ -8,7 +8,7 @@
\renewcommand{\textfraction}{0.08}
\hypersetup{
pdftitle={Tokenfabrikker: kan statlig eide AI-datasentre bli en inntektskilde for Norge slik oljen har vært?},
pdftitle={Tokenfabrikker: kan statlig eide AI-datasentre bli en inntektskilde for Norge slik oljen har vært? (utkast)},
pdfauthor={Kjell Tore Guttormsen},
pdflang={nb-NO},
pdfsubject={Forhåndsregistrert matematisk modell av kraftløsninger og eierformer for statlig eide AI-datasentre},
@ -17,7 +17,7 @@
\pagestyle{fancy}
\fancyhf{}
\fancyhead[L]{\small\itshape Tokenfabrikker}
\fancyhead[L]{\small\itshape Tokenfabrikker (utkast)}
\fancyhead[R]{\small\itshape Guttormsen (2026)}
\fancyfoot[C]{\small\thepage}
\renewcommand{\headrulewidth}{0.4pt}

View file

@ -1,7 +1,7 @@
\documentclass[11pt,a4paper]{article}
\documentclass[10pt,a4paper]{article}
\input{preamble}
\usepackage{xstring}
\geometry{top=12mm,bottom=12mm,left=18mm,right=18mm}
\geometry{top=12mm,bottom=12mm,left=18mm,right=18mm,headsep=3.5mm}
\hypersetup{pdftitle={Tokenfabrikker: sammendrag for beslutningstakere},pdfauthor={Kjell Tore Guttormsen},pdflang={nb-NO}}
\pagestyle{fancy}
\fancyhf{}
@ -11,7 +11,7 @@
\renewcommand{\headrulewidth}{0.4pt}
\fancypagestyle{plain}{\fancyhf{}\fancyfoot[C]{\small\thepage}\renewcommand{\headrulewidth}{0pt}}
\setlist{itemsep=0.6pt,topsep=1.5pt}
\titlespacing*{\section}{0pt}{1.1ex plus .2ex}{0.5ex}
\titlespacing*{\section}{0pt}{0.9ex plus .2ex}{0.4ex}
\titlespacing*{\paragraph}{0pt}{0.5ex plus .2ex}{0.5em}
% Tall fra resultatfilene, skrevet av lag_resultater.py (bygg.sh)
@ -40,40 +40,52 @@
\begin{tcolorbox}[enhanced,colback=boxbg,colframe=accent,boxrule=0.6pt,arc=1.5pt,left=7pt,right=7pt,top=4pt,bottom=4pt]
\textbf{Svaret er nei: hypotesen holder ikke.} Et statlig eid AI-datasenter som selger regnekraft til
utlandet, gir tap for Norge når dagens knapphet på regnekraft går over i et normalt marked. Det gjelder alle
de fem måtene å skaffe strøm på som er prøvd, og eget kjernekraftverk er den dyreste. Satsingen blir heller
ikke stor nok til å bli en ny olje. Regnekraft som statlig eksportnæring i stor skala bør derfor ikke stå
som mål i den nasjonale KI-strategien.
de fem måtene å skaffe strøm på som er prøvd. Tapet er størst med eget kjernekraftverk, et kraftverk uten
nettforbindelse bygd av mange små reaktorer; kjernekraft på nettet taper mindre, og ny fornybar kraft minst.
Satsingen blir heller ikke stor nok til å bli en ny olje. Regnekraft som statlig eksportnæring i stor skala
bør derfor ikke stå som mål i den nasjonale KI-strategien; rådet bygger på et normalt marked.
\end{tcolorbox}
\section{Spørsmålet}
Vi har prøvd om tokenfabrikker, AI-datasentre som i prinsippet eies av staten og eksporterer
ferdig prosessert regnekraft, kan bli en inntektskilde for Norge slik oljen har vært. Hypotesen var at «statlig eide tokenfabrikker i stor skala lønner seg for Norge og
oppfyller vilkårene for strøm og miljø, med den beste av kraftløsningene». Prøven er ærlig ment: svaret
kunne blitt ja, nei eller «bare på visse vilkår».
Tokenfabrikker er AI-datasentre som i prinsippet eies av staten og eksporterer ferdig prosessert regnekraft.
Hypotesen var at «statlig eide tokenfabrikker i stor skala lønner seg for Norge og oppfyller vilkårene for
strøm og miljø, med den beste av kraftløsningene». Prøven er ærlig ment: svaret kunne blitt ja, nei eller
«bare på visse vilkår». Målene og grensene for svaret (lønnsomhet for samfunnet og for virksomheten,
strømpris, forsyningssikkerhet, miljø og skala mot petroleumsinntektene) ble godkjent før modellen ble
regnet. De ligger i prosjektets åpne git-historikk, ikke i et offentlig register, og presiseringene av dem
ble skrevet etter grove overslag fra prosjektets fagfeller, som er språkmodeller.
\section{Hva vi fant}
Mye er usikkert, fra byggekostnader til prisen på regnekraft. Modellen er derfor regnet
\tall{dommer.antall} ganger, hver gang med nye verdier innenfor spennene, fra kildene der de finnes. Hver slik beregning kalles en trekning. Tallene under er \emph{medianen}, verdien halvparten av
trekningene ligger under, eller andelen av trekningene. Scenarioet som teller, er
\emph{normalscenarioet}: prisen på regnekraft har mistet dagens knapphetspåslag før det første anlegget er
i drift. At det skjer så tidlig, er et valg uten kilde, låst før noe ble regnet.
Modellen har 137 parametere, hver med kilde eller merket som åpen forutsetning, og er regnet
\tall{dommer.antall} ganger med nye verdier for de 91 usikre (hver beregning er en trekning). Tallene er
\emph{medianen}, verdien halvparten av trekningene ligger under, eller andelen av trekningene. Scenarioet som
teller, er \emph{normalscenarioet}: prisen på regnekraft har mistet dagens knapphetspåslag før det første
anlegget er i drift, et valg uten kilde, låst på forhånd.
\paragraph{Ett anlegg gir tap for samfunnet}
Lønnsomheten for samfunnet måles som \emph{netto nåverdi}: alle gevinster minus alle kostnader for Norge
over hele levetiden, regnet om til verdien i dag. For ett anlegg på 1\,000~MW er medianen
\tall{dommer.normalisering.t1.C.nnv-median}~mrd.~kr med ny fornybar kraft og
\tall{dommer.normalisering.t1.A.nnv-median}~mrd.~kr med eget kjernekraftverk. Nåverdien er positiv i høyst
\tall{dommer.normalisering.t1.C.m1.andel}~\%, med prisen lik kostnaden til en konkurrent med samme avkastningskrav.
over levetiden, regnet om til verdien i dag. For ett anlegg på 1\,000~MW er medianen
\tall{dommer.normalisering.t1.C.nnv-median}~mrd.~kr med ny fornybar kraft,
\tall{dommer.normalisering.t1.B.nnv-median}~mrd.~kr med kjernekraft på nettet og
\tall{dommer.normalisering.t1.A.nnv-median}~mrd.~kr med eget kjernekraftverk. I et normalt marked er prisen
på regnekraft satt lik kostnaden til en ny konkurrent med vanlig avkastning, og kraften er om lag 7~\% av
den kostnaden. Gevinsten er dermed begrenset av måten prisen er satt på, mens tapet er et funn: med ny
fornybar kraft går anlegget i null hvis prisen er \tall{terskler.pris.C.normalisering.pst-over}~\% høyere.
Nåverdien er positiv i høyst \tall{dommer.normalisering.t1.C.m1.andel}~\%, men andelen sier ikke hvor
sannsynlig en høyere pris er.
\paragraph{Satsingen blir ikke en ny olje}
Før noe ble regnet, satte vi en grense: gir satsingen mindre enn 5~\% av statens netto kontantstrøm fra
petroleum, det vil si 26,8~mrd.~kr per år, er den ikke «den nye oljen». Ett anlegg ligger under grensen i
\tall{dommer.normalisering.t1.A.m6.andel-ikke}~\% av trekningene, med alle fem løsningene. Et program på
fem anlegg lar seg ikke bygge innen 2100 i \tall{dommer.normalisering.t5.TK.m1.ikke-byggbar} til
\tall{dommer.normalisering.t5.TF.m1.ikke-byggbar}~\% av trekningene, avhengig av løsningen. Det hviler på
tre åpne forutsetninger om hvor fort kraft og servere kan komme på plass. Dommen over
hypotesen er den samme i alle de seks scenarioene: tre for prisen på regnekraft og tre der etterspørselen
faller.
Grensen satt på forhånd: gir satsingen utover vanlig avkastning på kapitalen mindre enn 5~\% av statens
netto kontantstrøm fra petroleum, 26,8~mrd.~kr per år, er den ikke «den nye oljen». Ett anlegg ligger under
i \tall{dommer.normalisering.t1.A.m6.andel-ikke}~\% av trekningene med alle fem løsningene. Målt som statens
kontantstrøm i første år med stabil drift, samme slags størrelse som oljeinntektene, er det i medianen
\tall{eierformer.A.kontantstrom.median} til \tall{eierformer.C.kontantstrom.median}~\% av dem, men uten
fradrag for avkastningen på kapitalen; det er ikke målet som ble satt. Fem anlegg lar seg ikke bygge innen
2100 i \tall{dommer.normalisering.t5.TK.m1.ikke-byggbar} til
\tall{dommer.normalisering.t5.TF.m1.ikke-byggbar}~\% av trekningene, etter tre åpne forutsetninger om hvor
fort kraft og servere kan komme på plass. I et normalt marked kunne grensen derfor i praksis ikke nås; neiet
til hypotesen kommer fra lønnsomheten. Dommene leses av på \tall{dommer.trinn} anlegg, slik regelen satt på
forhånd sier, og dommen over hypotesen er den samme i alle de seks scenarioene.
\talltilpgf{dommer.normalisering.t1.A.nnv.p10}{\aLo}\talltilpgf{dommer.normalisering.t1.A.nnv.p50}{\aMe}\talltilpgf{dommer.normalisering.t1.A.nnv.p90}{\aHi}%
\talltilpgf{dommer.normalisering.t1.B.nnv.p10}{\bLo}\talltilpgf{dommer.normalisering.t1.B.nnv.p50}{\bMe}\talltilpgf{dommer.normalisering.t1.B.nnv.p90}{\bHi}%
@ -87,7 +99,7 @@ faller.
\begin{center}
\captionsetup{hypcap=false}
\begin{tikzpicture}
\begin{axis}[width=112mm, height=23mm, scale only axis,
\begin{axis}[width=112mm, height=17.5mm, scale only axis,
xmin=-575, xmax=150, ymin=0.4, ymax=5.6, ytick={1,...,5},
yticklabels={Trinnvis med kjernekraft (T-K), Trinnvis med fornybar (T-F), Ny fornybar kraft (C),
Kjernekraft på nettet (B), Eget kjernekraftverk (A)},
@ -100,90 +112,102 @@ faller.
\nnvrad{2}{\fLo}{\fMe}{\fHi}{TF}\nnvrad{1}{\kLo}{\kMe}{\kHi}{TK}%
\end{axis}
\end{tikzpicture}
\captionof{figure}{Netto nåverdi for Norge av ett anlegg på 1\,000~MW i normalscenarioet. Prikken er
medianen, og streken dekker de midterste 80~\% av trekningene (fra 10- til 90-persentilen). Alle strekene
ligger til venstre for null: selv de gode utfallene gir tap. Trinnvis med kjernekraft får nesten aldri kjernekraft med ett anlegg.}
\captionof{figure}{Netto nåverdi for Norge av ett anlegg på 1\,000~MW i normalscenarioet: median (prikk) og
de midterste 80~\% av trekningene (strek). Selv de gode utfallene gir tap. Trinnvis med kjernekraft får
nesten aldri kjernekraft med ett anlegg.}
\end{center}
\section{Hva som kunne endre svaret}
Resultatet er ikke at regnekraft aldri kan lønne seg. Tre ting kan snu regnestykket for ett anlegg.
\begin{itemize}[leftmargin=1.2em]
\item \textbf{Statens vanlige rente.} Hovedberegningen krever samme avkastning som private,
etter vår lesning av statens regler for virksomhet i konkurranse med private (rundskriv R-109/2021);
kravet for regnekraft er en åpen forutsetning. Regnet
med statens vanlige kalkulasjonsrente (4~\%, lavere etter 40 år) blir nåverdien positiv med ny fornybar
kraft: median \tall{folsomheter.rad.16.normalisering.C.median}~mrd.~kr, positiv i
\tall{folsomheter.rad.16.normalisering.C.m1-andel}~\% av trekningene. Prisen på regnekraft bygger da fortsatt
på markedets krav, og skalaen er ikke regnet på nytt.
\item \textbf{Knappheten varer.} Holder dagens knapphetspris seg i ti år etter at det første anlegget er i drift (et
konstruert scenario uten kilde), er medianen positiv med ny fornybar
kraft (\tall{dommer.knapphet.t1.C.nnv-median}~mrd.~kr, positiv i
\tall{dommer.knapphet.t1.C.m1.andel}~\% av trekningene), men fortsatt negativ med eget kjernekraftverk
\item \textbf{Statens vanlige rente.} Hovedberegningen krever samme avkastning som private, fordi statens
regler, slik vi leser dem, sier det for virksomhet i konkurranse med private; kravet for regnekraft er en
åpen forutsetning. Med statens kalkulasjonsrente (4~\%, lavere etter 40 år) blir nåverdien positiv med ny
fornybar kraft: median \tall{folsomheter.rad.16.normalisering.C.median}~mrd.~kr, positiv i
\tall{karusell.rad16.C.m1-andel}~\% av trekningene. Kjernekraft på nettet får median
\tall{folsomheter.rad.16.normalisering.B.median}~mrd.~kr (positiv i \tall{karusell.rad16.B.m1-andel}~\%),
eget kjernekraftverk lavere enn i hovedberegningen, \tall{folsomheter.rad.16.normalisering.A.median}~mrd.~kr,
mest fordi tapet i kraftverket, som ligger år fram i tid, blir større i dagens kroner. Staten bærer da
risikoen markedet ellers tar betalt for: prisen bygger fortsatt på markedets krav, og et lavere krav også
der ville gitt lavere pris. Skalaen er ikke regnet på nytt.
\item \textbf{Knappheten varer.} Holder dagens knapphetspris seg i ti år etter at det første anlegget er i
drift (et konstruert scenario uten kilde), er medianen positiv med ny fornybar kraft
(\tall{dommer.knapphet.t1.C.nnv-median}~mrd.~kr, positiv i \tall{dommer.knapphet.t1.C.m1.andel}~\%), men
negativ med kjernekraft på nettet (\tall{dommer.knapphet.t1.B.nnv-median}~mrd.~kr, positiv i
\tall{dommer.knapphet.t1.B.m1.andel}~\%) og eget kjernekraftverk
(\tall{dommer.knapphet.t1.A.nnv-median}~mrd.~kr). Hypotesen holder ikke der heller: vilkårene for et ja
lar seg ikke tallfeste med tall fra kildene.
\item \textbf{Prisen på regnekraft.} Den avgjør mest, og ingen kilde forutsier den. I normalscenarioet må
prisen ligge \tall{terskler.pris.C.normalisering.pst-over}~\% over modellens forløp før et anlegg med
ny fornybar kraft går i null i medianen, og \tall{terskler.pris.A.normalisering.pst-over}~\% med
eget kjernekraftverk.
prisen ligge \tall{terskler.pris.C.normalisering.pst-over}~\% over modellens forløp før et anlegg med ny
fornybar kraft går i null i medianen, \tall{terskler.pris.B.normalisering.pst-over}~\% med kjernekraft på
nettet og \tall{terskler.pris.A.normalisering.pst-over}~\% med eget kjernekraftverk.
\end{itemize}
\section{Hva vi lærte}
\begin{itemize}[leftmargin=1.2em]
\item \textbf{Prisen avgjør, og staten rår ikke over den.} Ikke bind staten til stor skala: ingen av
løsningene bærer et program på fem anlegg eller mer. Vurderes et statlig engasjement likevel, bør det være
lite, trinnvis og med avtalt pris før kapitalen bindes (en vurdering, ikke regnet i modellen). Trinnvis utbygging gir likevel større tap i
modellen i et normalt marked, og verdien av å kunne stoppe underveis er ikke regnet.
\item \textbf{Kraften først. Eget kjernekraftverk ga størst tap.} Medianen er lavest av de fem, og på
like vilkår er det best i \tall{dommer.m7.normalisering.t1.A.alene}~\% av trekningene for ett anlegg, ny
fornybar kraft i \tall{dommer.m7.normalisering.t1.C.alene}~\%. Sammenligningen gir ingen dom, og den
beste gir også tap. Med fem anlegg er løsningene med kjernekraft oftere best
(\tall{karusell.m7.t5.kjernekraft} mot \tall{karusell.m7.t5.fornybar}~\%), fordi så mye ny fornybar
kraft sjelden lar seg bygge, men nåverdien er nesten aldri positiv. Med ny fornybar kraft betyr det mest hvor mye ny kraft som kan
settes i drift per år, et tall ingen kilde gir; det bør utredes før noe annet. Strømmen tåler ett anlegg:
prisen øker høyst 5~\% i \tall{dommer.normalisering.t1.C.m3.andel}~\% av trekningene, med alle fem
løsningene, regnet som årspris, ikke time for time. Kjøpes kraften fra nettet uten ny kraft, gjelder det bare i
\tall{dommer.normalisering.t1.R.m3.andel}~\%, og forsyningssikkerheten svekkes per definisjon
i \tall{dommer.normalisering.t1.R.m4.andel-ikke}~\%.
\item \textbf{Det tar lang tid, og etterspørselen kan flytte.} I moduler på 100~MW er de
første i drift i \tall{tidslinje.dom.TF.median-aar} i medianen. Et helt anlegg på 1\,000~MW er i drift i
lite, trinnvis og med avtalt pris før kapitalen bindes (en vurdering, ikke regnet i modellen). Trinnvis
utbygging gir likevel større tap i modellen i et normalt marked, og verdien av å kunne stoppe underveis er
ikke regnet.
\item \textbf{Kraften først. Eget kjernekraftverk uten nett ga størst tap, kjernekraft på nettet mindre.}
Sammenlignet med samme modell og regler er eget kjernekraftverk best i \tall{karusell.m7.t1.A.alene}~\% av
trekningene for ett anlegg, ny fornybar kraft i \tall{karusell.m7.t1.C.alene}~\%. Sammenligningen gir
ingen dom, og den beste gir også tap. Med fem anlegg er løsningene med kjernekraft oftere best
(\tall{karusell.m7.t5.kjernekraft} mot \tall{karusell.m7.t5.fornybar}~\%), fordi så mye ny fornybar kraft
sjelden lar seg bygge, men nåverdien er nesten aldri positiv. Hvor mye ny fornybar kraft og hvor mye
kjernekraft som kan settes i drift per år, er åpne forutsetninger uten kilde og svært ulike, og
sammenligningen med fem anlegg hviler på dem; det bør utredes før noe annet. Kravet til strømprisen holder i
\tall{dommer.normalisering.t1.C.m3.andel}~\% av trekningene med alle fem løsningene, fordi de er bygd med
like mye ny kraft som datasenteret bruker, regnet som årspris for landet samlet. Kjøpes kraften fra nettet
uten ny kraft, holder kravet bare i \tall{dommer.normalisering.t1.R.m3.andel}~\%, og forsyningssikkerheten
svekkes per definisjon i \tall{dommer.normalisering.t1.R.m4.andel-ikke}~\%. Med eget kjernekraftverk holder
den per definisjon, fordi verket ikke er koblet til nettet; med ny fornybar kraft, vurdert uten tiltak, i
\tall{dommer.normalisering.t1.C.m4.andel}~\%. Miljøkravet holder per definisjon for ny fornybar kraft og på
vilkår for kjernekraft, som i én av tre kilder har 12 mot 11~g CO\textsubscript{2} per kWh for vind på land.
\item \textbf{Det tar lang tid, og etterspørselen kan flytte.} I moduler på 100~MW er de første i drift i
\tall{tidslinje.dom.TF.median-aar} i medianen. Et helt anlegg på 1\,000~MW er i drift i
\tall{tidslinje.dom.C.halv-1000-aar} med ny fornybar kraft og i \tall{tidslinje.dom.A.halv-1000-aar} med
kjernekraft. Flytter 80~\% av AI-bruken utenom trening til brukernes egne maskiner (prosjektets eget forløp, uten kilde), faller medianen for den beste løsningen til mellom \tall{dommer.egne-lav.t1.C.nnv-median} og
\tall{dommer.egne-hoy.t1.C.nnv-median}~mrd.~kr.
kjernekraft; årstallet for de første modulene bygger på en åpen forutsetning om 3 til 7 år til første
tilknytning til nettet. Flytter 80~\% av AI-bruken utenom trening til brukernes egne maskiner (prosjektets eget
forløp, uten kilde), faller medianen for den beste løsningen til mellom
\tall{dommer.egne-lav.t1.C.nnv-median} og \tall{dommer.egne-hoy.t1.C.nnv-median}~mrd.~kr.
\item \textbf{Eierformen redder ikke regnestykket.} Med alle fire statlige eierformer er nåverdien for
staten negativ i \tall{eierformer.C.direkte.tap} til \tall{eierformer.A.direkte.tap}~\% av trekningene.
staten negativ i \tall{karusell.eier.tap-lav} til \tall{karusell.eier.tap-hoy}~\% av trekningene.
Om de er forenlige med statsstøttereglene i EØS-avtalen, står åpent: vi fant ingen kilde som vurderer det.
\item \textbf{Tett kunnskapshullene, og regn åpent.} De åpne tallene for inntekt per megawatt regnekraft er
selskapenes egne og spriker mye, og ingen kilde måler hvor mye av kapasiteten som blir solgt. Staten
publiserer ikke avkastningskravene til egne selskaper. Et kraftverk som forsyner ett datasenter uten
nett, har nesten ikke erfaringsgrunnlag. Hullene kan utredes nå og koster lite mot
investeringene det gjelder. Analysene bak store statlige investeringer i regnekraft og kraft bør være
åpne: forutsetninger, kilder og kode, og kriterier satt før det regnes.
\item \textbf{Tett kunnskapshullene, og regn åpent.} Det mangler åpne tall for inntekt og salgsandel per
megawatt regnekraft, for statens avkastningskrav og for kraftverk som forsyner ett datasenter uten nett.
Hullene kan utredes nå og koster lite mot investeringene det gjelder. Analyser av store investeringer i
regnekraft og kraft bør være åpne: forutsetninger, kilder og kode, og kriterier satt før det regnes.
\end{itemize}
\section{Slik er det prøvd}
Målene og grensene for svaret ble skrevet ned og godkjent før noe ble regnet: lønnsomhet for samfunnet og
for virksomheten, strømpris, forsyningssikkerhet, miljø og skala mot petroleumsinntektene. De fem
kraftløsningene i figuren sammenlignes på like vilkår, og fire statlige eierformer er regnet for hver. Modellen har 137 parametere; 91
av dem er usikre og trekkes på nytt i hver av de \tall{dommer.antall} trekningene. Hvert tall står i
parameterfila med kilde eller merket som åpen forutsetning. Parameterfila, kildebanken med 1\,236 poster,
modellen, koden og resultatfilene ligger åpent.
\section{Hva dette ikke er}
Modellen er et regnestykke, ikke en offentlig utredning og ikke en anbefaling om å bygge. Svaret gjelder
statlig eksport av regnekraft i stor skala, ikke private datasentre. Verdien av norsk kontroll over
regnekraft for beredskap og suverenitet, annen bruk av KI, og om private eiere ville gjort det bedre, er
ikke regnet. 40 av de 137
parameterne er åpne forutsetninger, der ingen kilde gir tallet direkte. Kildene er kontrollert av
språkmodeller, ikke av fagpersoner; 123 av 1\,236 poster er kontrollert en ekstra gang, også det av en
språkmodell. Resultatene er ikke
vurdert av eksterne fagfolk. To kjente begrensninger kan gjøre kjernekraft dyrere enn i modellen:
kostnadsoverskridelsene kan ha en tyngre hale enn modellen regner med, og tilpasning av et utenlandsk
reaktordesign til norsk regelverk er ikke regnet inn. To observasjoner i de samme kildene trekker motsatt
vei, mot raskere bygging og mer læring, og tre forenklinger trekker i favør av ny fornybar kraft: magasinene
jevner ut uten kostnad, vindkraftens verdi faller ikke når mye bygges, og en kald uke uten vind er ikke
regnet. Alt står i rapportens kapittel 6 til 9.
statlig eksport av regnekraft i stor skala fra anlegg som eier både bygg og brikker, ikke private
datasentre og ikke utleie av bygg og kraft. Verdien av norsk kontroll over regnekraft for beredskap og
suverenitet, annen bruk av KI, og om private eiere ville gjort det bedre, er ikke regnet. 40 av de 137
parameterne er åpne forutsetninger. Kildene er kontrollert av språkmodeller, ikke av fagpersoner; 123 av
1\,236 poster er kontrollert en ekstra gang, også det av en språkmodell. Resultatene er ikke vurdert av
eksterne fagfolk, og resultatfilene er gjenskapt bare på samme maskin.
\begin{tcolorbox}[enhanced,colback=boxbg,colframe=accent,boxrule=0.6pt,arc=1.5pt,left=7pt,right=7pt,top=2.5pt,bottom=2.5pt,before skip=5pt,after skip=5pt]
Forbeholdene går begge veier. Kjernekraft kan bli dyrere enn i modellen: overskridelsene kan ha en
tyngre hale, og tilpasning av et utenlandsk reaktordesign til norsk regelverk er ikke regnet inn. Den kan
også bli billigere og raskere: kildene viser mer læring og raskere bygging enn spennene tillater,
sluttkostnader under spennet for store reaktorer i Finland og Korea, og i Emiratene, et nytt
kjernekraftland, om lag 4\,400~USD/kW med renter og tolv år fra vedtak til første enhet på nettet; andre nye
kjernekraftland har brukt lenger tid. I om lag
halvparten av trekningene legges en overskridelse oppå kostnadsspennet; leses det som sluttkostnad, blir
medianen \tall{folsomheter.rad.1.normalisering.A.median}~mrd.~kr med eget kjernekraftverk og
\tall{folsomheter.rad.1.normalisering.B.median}~mrd.~kr med kjernekraft på nettet. Eget kjernekraftverk er
regnet med avkastningskravet for regnekraft, som er høyere enn kravet for kraft, og det trekker i dets favør:
med kravet for kraft blir medianen \tall{folsomheter.rad.3.normalisering.A.median}~mrd.~kr. Tre forenklinger trekker
i favør av ny fornybar kraft: magasinene som finnes, jevner ut uten kostnad (ny lagring bygges ikke),
vindkraftens verdi faller ikke når mye bygges, og en kald uke uten vind er ikke regnet. To trekker mot alle
løsningene: prisen har ingen renter i datasenterets byggetid, og bare Norge kan rammes av stans i
leveransene av brikker. Hva Statnetts funksjonskrav for datasentre på nettet koster, er ikke regnet; det
trekker i favør av løsningene på nettet. Alt står i rapportens kapittel 6 til 10.
\begin{tcolorbox}[enhanced,colback=boxbg,colframe=accent,boxrule=0.6pt,arc=1.5pt,left=7pt,right=7pt,top=1pt,bottom=1pt,before skip=3pt,after skip=3pt]
\small
\textbf{Rapport, modell, kilder og kode:} \url{https://git.fromaitochitta.com/open/tokenfabrikker}
\end{tcolorbox}

View file

@ -131,4 +131,4 @@
kraft-løsningen data-sentre data-senter token-fabrikker kjerne-kraft kjerne-kraftverk
parameter-fila parameter-frysen nåverdi netto-nåverdi utbyggings-banene kilde-banken
spesifikasjonen fagfelle-loggen kostnads-overskridelse kostnads-overskridelsen
eier-formene eier-form følsomhets-lista}
eier-formene eier-form følsomhets-lista petroleums-modellen}

View file

@ -788,7 +788,10 @@ def _eiertabeller(s: Samler, filer: dict[str, Any], ut: Path) -> None:
linjer = [
"{\\footnotesize",
"\\setlength{\\tabcolsep}{3pt}",
r"\begin{xltabular}{\linewidth}{@{}llXP{38mm}>{\raggedleft\arraybackslash}p{24mm}@{}}",
(
r"\begin{xltabular}{\linewidth}{@{}ll>{\raggedright\arraybackslash}XP{38mm}"
r">{\raggedleft\arraybackslash}p{24mm}@{}}"
),
(
"\\caption{Rangeringen av eierformene i hovedkjøringen og i radene 24, 25, 28 og 29: "
"formene som er rangert etter verdi for fellesskapet blant dem med sannsynlighet for "

View file

@ -49,9 +49,9 @@ KJERNEKRAFT = ("A", "B", "T-K")
FORNYBAR = ("C", "T-F")
# The colour of each solution, defined in karusell.tex.
FARGE = {"A": "farA", "B": "farB", "C": "farC", "T-F": "farTF", "T-K": "farTK"}
# Slide 18: the verdict words of the pre-registration as the carousel's table writes them. M5 has
# no share of the draws, so its conditional verdict is «på vilkår», not «delvis».
TABELLORD = {"holder": "Ja", "holder ikke": "Nei", "holder under betingelser": "Delvis"}
# Slide 18: the verdict words of the pre-registration as the carousel's table writes them. The
# conditional verdict has one word for every target, «på vilkår» (M5 has no share of the draws).
TABELLORD = {"holder": "Ja", "holder ikke": "Nei", "holder under betingelser": "På vilkår"}
TABELLORD_M5 = {"holder": "Ja", "holder under betingelser": "På vilkår"}
# Slide 15: the capacity whose first year in the median is marked (MW IT), and the rules of
# tidslinje.py for the other three marks (clarification 75).
@ -63,7 +63,7 @@ GRENSE_IKKE = 0.05
GRENSE_NY = 0.25
MM_PER_PST = 1.0
OLJE_VENSTRE = 26.0
BIDRAG_RAD = 7.0
BIDRAG_RAD = 6.0
PRIS_RAD = 22.0
LIK = 1e-9
@ -225,7 +225,7 @@ def _eierformer(e: Any, tall: dict[str, Tall]) -> None: # noqa: ANN401
def _krav(d: Any, tall: dict[str, Tall]) -> None: # noqa: ANN401
"""Slide 18: the verdict per target for one facility in «normalisering», as table words."""
for los in ("C", "A"):
for los in ("C", "B", "A"):
lk = LOSNING[los]
for maal in MAAL:
if maal == "M5":
@ -424,7 +424,7 @@ def _prikkfigurer() -> tuple[Prikkfigur, ...]:
"funn1",
Akse(-600.0, 150.0, 124.0),
tuple(Rad(LOSNING[x], NORMAL, x, FARGE[x]) for x in ("C", "T-F", "T-K", "B", "A")),
14.0,
11.0,
0.8,
2,
(-600, -500, -400, -300, -200, -100, 0, 100),
@ -541,7 +541,7 @@ def _tidslinje_figur(aar: dict[str, int]) -> list[str]:
def _pris_figur(ters: Any) -> list[str]: # noqa: ANN401
"""Slide 23: how far above the model's path the price must be, one bar per solution."""
linjer = [f"% Generated by rapport/resultater/karusell.py from {TERSK} (pristerskler, k)."]
for nr, los in enumerate(("C", "A")):
for nr, los in enumerate(("C", "B", "A")):
k = float(hent(ters, ("pristerskler", los, NORMAL, "k")))
lk = LOSNING[los]
y = -nr * PRIS_RAD
@ -564,13 +564,15 @@ def lag(data: Path, ut: Path) -> dict[str, Tall]:
aar = _tidslinje(les(data, TID), tall)
_eierformer(les(data, EIER), tall)
_krav(d, tall)
tall["karusell.rad16.C.m1-andel"] = fra_fil(
les(data, FOLS),
FOLS,
("rader", "16", "tabell", NORMAL, "losninger", "C", "M1", "andel_holder"),
"pst",
1,
)
fols = les(data, FOLS)
for los in ("C", "B"):
tall[f"karusell.rad16.{LOSNING[los]}.m1-andel"] = fra_fil(
fols,
FOLS,
("rader", "16", "tabell", NORMAL, "losninger", los, "M1", "andel_holder"),
"pst",
1,
)
for fig in _prikkfigurer():
_skriv(ut, f"karusell-prikker-{fig.navn}.tex", _prikkfigur(f, fig, tall))
_skriv(ut, "karusell-olje.tex", _olje())

View file

@ -110,6 +110,11 @@ def _escape(tekst: str) -> str:
return tekst.replace("_", "\\_")
def _vis(tekst: str) -> str:
"""A name or unit from the parameter file for the table: rho_A and CO2e as in the report."""
return _escape(tekst).replace("rho\\_A", r"$\rho_A$").replace("CO2e", r"CO\textsubscript{2}e")
def _ord(t: Tall, sann: str = "ja", usann: str = "nei") -> Tall:
"""A boolean from a file shown as a word; None as an en dash."""
vist = "--" if t.raa is None else (sann if t.raa else usann)
@ -700,7 +705,7 @@ def _storrelsestabell(storrelser: dict[str, Storrelse], brukt: set[str], ut: Pat
if navn not in brukt:
continue
rader.append(
f"{_symbol(navn, s, merke=False)} & {_escape(s.navn)} & {_escape(s.enhet)} & "
f"{_symbol(navn, s, merke=False)} & {_vis(s.navn)} & {_vis(s.enhet)} & "
f"{STATUSNAVN.get(s.status, s.status)} \\\\"
)
(ut / "terskler-storrelser.tex").write_text("\n".join(rader) + "\n", encoding="utf-8")

View file

@ -5,36 +5,53 @@
\paragraph{Svaret}
\textbf{Hypotesen holder ikke.} Et statlig eid AI-datasenter som selger regnekraft til utlandet, gir tap for
Norge når dagens knapphet på regnekraft går over i et normalt marked. Det gjelder alle de fem måtene å
skaffe strøm på som er prøvd, og eget kjernekraftverk er den dyreste. Satsingen blir heller ikke stor nok
til å bli en ny olje.
skaffe strøm på som er prøvd. Tapet er størst med eget kjernekraftverk, et kraftverk uten nettforbindelse
bygd av mange små reaktorer; kjernekraft på nettet taper mindre, og ny fornybar kraft minst. Satsingen blir
heller ikke stor nok til å bli en ny olje.
\paragraph{Spørsmålet}
Rapporten prøver om AI-datasentre som i prinsippet eies av staten, og som eksporterer ferdig prosessert
regnekraft, kan bli en inntektskilde for Norge slik oljen har vært. Hypotesen er at «statlig eide
tokenfabrikker i stor skala lønner seg for Norge og oppfyller vilkårene for strøm og miljø, med den beste av
kraftløsningene». Målene og grensene for svaret ble skrevet ned og godkjent før noe ble regnet
(\cref{sec:sporsmalet,sec:proving}). Fem kraftløsninger sammenlignes på like vilkår: eget kjernekraftverk for
hvert datasenter, kjernekraft på nettet, ny fornybar kraft med lagring, og trinnvis utbygging i moduler på
100~MW med fornybar kraft eller med kjernekraft når den kan komme (\cref{sec:kraftlosningene}). Mye er
kraftløsningene». Målene og grensene for svaret ble skrevet ned og godkjent før modellen ble regnet
(\cref{sec:sporsmalet,sec:proving}). De ligger i prosjektets egen åpne git-historikk, ikke i et offentlig
register. Prosjektets fagfeller er språkmodeller som har lest utkastene, og de hadde gjort grove overslag før
presiseringene av kriteriene ble skrevet. Hypotesen ble endret før modellen ble regnet, men etter at de samme
overslagene pekte mot at eget kjernekraftverk taper (\cref{sec:endringen,sec:begrensning-gjennomgang}). Fem
kraftløsninger sammenlignes med samme modell og regler: eget kjernekraftverk for hvert datasenter, et
kraftverk uten nettforbindelse bygd av mange små reaktorer med reserveenheter, etter oppsettet i en studie
fra amerikanske nasjonallaboratorier \kilde{K12-001}; kjernekraft på nettet; ny fornybar kraft fra vind og vann; og trinnvis utbygging i moduler på
100~MW med fornybar kraft eller med kjernekraft når den kan komme (\cref{sec:kraftlosningene}). Modellen bygger
ingen ny lagring; fleksibiliteten er vannmagasinene som finnes, fast effekt og utkobling. Mye er
usikkert, så modellen er regnet \tall{dommer.antall} ganger, hver gang med nye verdier for alt som er
usikkert (hver beregning kalles en trekning). Med ett anlegg får trinnvis med kjernekraft nesten
aldri kjernekraft: i intet år gjelder det mer enn \tall{tidslinje.dom.TK.kjerne-topp}~\% av trekningene,
og løsningen er da i praksis trinnvis med fornybar kraft. Scenarioet som teller, er normalscenarioet
(«\tall{dommer.teller}»), der prisen på regnekraft har mistet dagens knapphetspåslag før det første
anlegget er i drift. At påslaget er borte så tidlig, er et valg uten kilde, låst før noe ble regnet; den
anlegget er i drift. At påslaget er borte så tidlig, er et valg uten kilde, låst før modellen ble regnet; den
eneste tallfestede analogien i kildebanken, inntjeningen i skipsfarten etter et sjokk, peker samme vei \kilde{K13-016}.
\paragraph{Hva vi fant}
Lønnsomheten for samfunnet måles som netto nåverdi: alle gevinster minus alle kostnader for Norge over hele
levetiden, regnet om til verdien i dag. For ett anlegg på 1\,000~MW er medianen, verdien halvparten av
trekningene ligger under, \tall{dommer.normalisering.t1.C.nnv-median}~mrd.~kr med ny fornybar kraft og
\tall{dommer.normalisering.t1.A.nnv-median}~mrd.~kr med eget kjernekraftverk. Nåverdien er positiv i høyst
\tall{dommer.normalisering.t1.C.m1.andel}~\% av trekningene. Andelen er regnet med prisen lik
kostnaden til en konkurrent med samme avkastningskrav som Norge, så den sier ikke hvor sannsynlig en høyere
pris er. Hvor mye høyere prisen må være, viser pristerskelen (under). Kjernekraft på nettet kommer bedre ut enn eget
kjernekraftverk, men gir også tap: medianen er \tall{dommer.normalisering.t1.B.nnv-median}~mrd.~kr. Skalaen nås heller ikke: grensen for «den nye
oljen» er 5~\% av statens netto kontantstrøm fra petroleum, 26,8~mrd.~kr per år, og ett anlegg ligger under
den i \tall{dommer.normalisering.t1.A.m6.andel-ikke}~\% av trekningene. Et program på fem anlegg lar seg ikke
trekningene ligger under, \tall{dommer.normalisering.t1.C.nnv-median}~mrd.~kr med ny fornybar kraft,
\tall{dommer.normalisering.t1.B.nnv-median}~mrd.~kr med kjernekraft på nettet og
\tall{dommer.normalisering.t1.A.nnv-median}~mrd.~kr med eget kjernekraftverk. I et normalt marked er prisen
på regnekraft i modellen satt lik kostnaden til en ny konkurrent med vanlig avkastning, og kraften er om lag
7~\% av den kostnaden \kilde{K08-K03}. Gevinsten er dermed begrenset av måten prisen er satt på, mens tapet
er et funn: med ny fornybar kraft går anlegget i null i medianen hvis prisen er
\tall{terskler.pris.C.normalisering.pst-over}~\% høyere. Nåverdien er positiv i høyst
\tall{dommer.normalisering.t1.C.m1.andel}~\% av trekningene, men fordi prisen er satt lik kostnaden, sier
andelen ikke hvor sannsynlig en høyere pris er. Hvor tapet kommer fra, viser følsomhetene bare delvis
(\cref{sec:konklusjon}). Skalaen nås heller ikke: grensen for «den nye oljen» er 5~\% av statens netto
kontantstrøm fra petroleum, 26,8~mrd.~kr per år, og den måles mot bidraget utover vanlig avkastning på
kapitalen. Ett anlegg ligger under den i \tall{dommer.normalisering.t1.A.m6.andel-ikke}~\% av trekningene.
Målt som statens kontantstrøm i første år med stabil drift, samme slags størrelse som oljeinntektene, er ett
anlegg i medianen \tall{eierformer.A.kontantstrom.median} til \tall{eierformer.C.kontantstrom.median}~\% av
dem; det tallet trekker ikke fra avkastningen på kapitalen og er ikke målet som ble satt på forhånd
(\cref{sec:res-eierformer}). I et normalt marked kunne grensen i praksis ikke nås, fordi prisen er satt lik
kostnaden og store programmer ikke rekker å bli bygget; neiet til hypotesen kommer fra lønnsomheten. Et
program på fem anlegg lar seg ikke
bygge innen 2100 i \tall{dommer.normalisering.t5.TK.m1.ikke-byggbar} til
\tall{dommer.normalisering.t5.TF.m1.ikke-byggbar}~\% av trekningene. Den andelen hviler på tre åpne
forutsetninger uten kilde: hvor mye kjernekraft og ny fornybar kraft som kan settes i drift per år, og hvor
@ -45,20 +62,33 @@ programmet der minst én løsning har et år med stabil drift i minst 80~\% av t
hypotesen er den samme i alle de seks scenarioene, tre for prisen på regnekraft og tre der etterspørselen faller (\cref{sec:res-dommer}).
\paragraph{Hva som kunne endre svaret}
Resultatet er ikke at regnekraft aldri kan lønne seg. Regnet med statens vanlige kalkulasjonsrente (4~\%,
lavere etter 40 år) i stedet for et markedsbasert avkastningskrav blir nåverdien positiv for ett anlegg med
Resultatet er ikke at regnekraft aldri kan lønne seg. Hovedberegningen bruker et markedsbasert
avkastningskrav, fordi statens regler, slik vi leser dem, sier det for virksomhet i konkurranse med private.
Regnet med statens vanlige kalkulasjonsrente (4~\%, lavere etter 40 år) i stedet blir nåverdien positiv for ett anlegg med
ny fornybar kraft (median \tall{folsomheter.rad.16.normalisering.C.median}~mrd.~kr;
\cref{sec:res-folsomheter}). Da er bare nåverdien regnet om: prisen på regnekraft bygger fortsatt på
markedets avkastningskrav, og skalaen er ikke regnet på nytt. At statens regel for forretningsdrift i
\cref{sec:res-folsomheter}). Med kjernekraft på nettet blir medianen
\tall{folsomheter.rad.16.normalisering.B.median}~mrd.~kr og nåverdien positiv i
\tall{karusell.rad16.B.m1-andel}~\% av trekningene; med eget kjernekraftverk blir medianen lavere enn i
hovedberegningen, \tall{folsomheter.rad.16.normalisering.A.median}~mrd.~kr: en lavere rente gjør tapet i
kraftverket, som ligger år fram i tid, større i dagens kroner, og for eget kjernekraftverk veier det tyngre
enn at prisen fortsatt bygger på markedets krav (hvor mye hvert ledd gir, er ikke regnet ut med de frosne
tallene). Av samme grunn trekker det i favør av eget kjernekraftverk at hovedberegningen regner verket med
avkastningskravet for regnekraft, som er høyere enn kravet for kraft; med kravet for kraft blir medianen
\tall{folsomheter.rad.3.normalisering.A.median}~mrd.~kr. Da er bare nåverdien regnet om:
prisen på regnekraft bygger fortsatt på markedets avkastningskrav, og skalaen er ikke regnet på nytt.
Regnemåten betyr at staten bærer risikoen som markedet ellers tar betalt for; et lavere krav også i markedet
ville i modellen gitt lavere pris. At statens regel for forretningsdrift i
konkurranse med private gjelder her, er prosjektets tolkning, og avkastningskravet for regnekraft er en åpen
forutsetning (\cref{sec:kalkulasjonsrenten}). Varer knappheten i ti år etter at det første anlegget er i drift (et konstruert
scenario uten kilde), er medianen positiv med ny fornybar kraft
(\tall{dommer.knapphet.t1.C.nnv-median}~mrd.~kr), men fortsatt negativ med eget kjernekraftverk
(\tall{dommer.knapphet.t1.A.nnv-median}~mrd.~kr); hypotesen holder ikke der heller, fordi vilkårene ikke lar
(\tall{dommer.knapphet.t1.C.nnv-median}~mrd.~kr), men fortsatt negativ med kjernekraft på nettet
(\tall{dommer.knapphet.t1.B.nnv-median}~mrd.~kr, positiv i \tall{dommer.knapphet.t1.B.m1.andel}~\%) og med
eget kjernekraftverk (\tall{dommer.knapphet.t1.A.nnv-median}~mrd.~kr); hypotesen holder ikke der heller, fordi vilkårene ikke lar
seg tallfeste med tall fra kildene. Utfallet avgjøres først av prisen på regnekraft: i normalscenarioet må
den ligge \tall{terskler.pris.C.normalisering.pst-over}~\% over modellens forløp for at et anlegg med ny
fornybar kraft skal gå i null i medianen, og \tall{terskler.pris.A.normalisering.pst-over}~\% over med eget
kjernekraftverk (\cref{sec:res-terskler}).
fornybar kraft skal gå i null i medianen, \tall{terskler.pris.B.normalisering.pst-over}~\% over med
kjernekraft på nettet og \tall{terskler.pris.A.normalisering.pst-over}~\% med eget kjernekraftverk
(\cref{sec:res-terskler}).
\paragraph{Hva vi lærte}
\begin{itemize}[leftmargin=1.2em,itemsep=1pt,topsep=2pt]
@ -66,25 +96,36 @@ kjernekraftverk (\cref{sec:res-terskler}).
mer; et statlig engasjement bør i så fall være lite, trinnvis og med avtalt pris før kapitalen bindes. At
prisen bør være avtalt, er en vurdering; modellen regner ikke en slik avtale. Trinnvis utbygging gir likevel større tap i
modellen i et normalt marked, og verdien av å kunne stoppe underveis er ikke regnet.
\item \emph{Kraften først. Eget kjernekraftverk ga størst tap.} Medianen er lavest av de fem løsningene, og
på like vilkår er eget kjernekraftverk best i \tall{dommer.m7.normalisering.t1.A.alene}~\% av
trekningene, ny fornybar kraft i \tall{dommer.m7.normalisering.t1.C.alene}~\% (\cref{sec:res-m7}).
\item \emph{Kraften først. Eget kjernekraftverk uten nett ga størst tap, kjernekraft på nettet mindre.} Med
eget kjernekraftverk er medianen lavest av de fem løsningene, og sammenlignet med samme modell og regler er
det best i \tall{karusell.m7.t1.A.alene}~\% av
trekningene, ny fornybar kraft i \tall{karusell.m7.t1.C.alene}~\% (\cref{sec:res-m7}).
Sammenligningen gir ingen dom, slik forhåndsregistreringen sier: den viser hvor ofte hver er best, og den
beste gir også tap. Med fem anlegg er løsningene med kjernekraft oftere best
(\tall{karusell.m7.t5.kjernekraft} mot \tall{karusell.m7.t5.fornybar}~\%), fordi så mye ny fornybar kraft
sjelden lar seg bygge, men der er nåverdien nesten aldri positiv, uansett løsning. Hvor mye ny kraft som kan settes i drift
per år, betyr mest og har ingen kilde. Kjøpes kraften fra nettet uten ny kraft, svekkes
forsyningssikkerheten per definisjon i \tall{dommer.normalisering.t1.R.m4.andel-ikke}~\% av trekningene:
«svekkes» betyr svakere enn uten anlegget, uansett hvor lite. Også med ny kraft
holder den uten tiltak bare i en del av trekningene, med ny fornybar kraft i
\tall{dommer.normalisering.t1.C.m4.andel}~\%, mens den holder i alle med eget kjernekraftverk.
sjelden lar seg bygge; der den kan bygges, er den best i \tall{dommer.m7.normalisering.t5.C.blant}~\%. Hvor
mye ny fornybar kraft og hvor mye kjernekraft som kan settes i drift per år, er åpne forutsetninger uten
kilde og svært ulike (0,2 til 0,6~TWh ny fornybar kraft ut over det som bygges uansett, mot 500 til
2\,000~MW kjernekraft), og sammenligningen med fem anlegg hviler på dem. Etter prisen betyr takten mest for
ny fornybar kraft. Med fem anlegg er nåverdien nesten
aldri positiv, uansett løsning. Kravet til strømprisen holder i
\tall{dommer.normalisering.t1.C.m3.andel}~\% av trekningene med alle fem løsningene, fordi de er bygd med
like mye ny kraft som datasenteret bruker; prisen er regnet som årspris for landet samlet, ikke der
anlegget ligger. Kjøpes kraften fra nettet uten ny kraft, svekkes forsyningssikkerheten per definisjon i
\tall{dommer.normalisering.t1.R.m4.andel-ikke}~\% av trekningene: «svekkes» betyr svakere enn uten
anlegget, uansett hvor lite. Med eget kjernekraftverk holder den per definisjon, fordi verket ikke er koblet
til nettet. De andre løsningene er vurdert uten tiltakene som er betalt, og med ny fornybar kraft holder den
i \tall{dommer.normalisering.t1.C.m4.andel}~\%. Miljøkravet holder per definisjon for ny fornybar kraft;
for kjernekraft holder det på vilkår, fordi kjernekraften i én av tre kilder ligger over vind på land, 12
mot 11~g CO\textsubscript{2} per kWh.
\item \emph{Det tar lang tid, og etterspørselen kan flytte.} De første modulene er i drift i
\tall{tidslinje.dom.TF.median-aar} i medianen, et helt anlegg i \tall{tidslinje.dom.C.halv-1000-aar} med
ny fornybar kraft (\cref{sec:res-tidslinje}). Flytter 80~\% av AI-bruken utenom trening til brukernes
ny fornybar kraft (\cref{sec:res-tidslinje}). Det første årstallet bygger på en åpen forutsetning om 3 til
7 år fra beslutning til første tilknytning til nettet. Flytter 80~\% av AI-bruken utenom trening til brukernes
egne maskiner (et forløp som er prosjektets eget og uten kilde), faller medianen for den beste løsningen til mellom \tall{dommer.egne-lav.t1.C.nnv-median}
og \tall{dommer.egne-hoy.t1.C.nnv-median}~mrd.~kr.
\item \emph{Eierformen redder ikke regnestykket.} Nåverdien for staten er negativ med alle fire eierformene
i \tall{eierformer.C.direkte.tap} til \tall{eierformer.A.direkte.tap}~\% av trekningene
i \tall{karusell.eier.tap-lav} til \tall{karusell.eier.tap-hoy}~\% av trekningene
(\cref{sec:res-eierformer}). I hovedberegningen er eierformene like effektive, og private medeiere
betaler det andelen er verdt; om private eiere ville gjort det bedre enn staten, er ikke prøvd.
\item \emph{Tett kunnskapshullene, og regn åpent.} Det mangler åpne tall for inntekt og salgsandel per
@ -94,13 +135,29 @@ kjernekraftverk (\cref{sec:res-terskler}).
\paragraph{Hva dette ikke er}
Modellen er et regnestykke, ikke en offentlig utredning og ikke en anbefaling om å bygge. Den prøver
statlig eide datasentre som selger regnekraft til utlandet. Om private datasentre lønner seg for eierne,
er ikke prøvd; de ligger i nullalternativet, det satsingen sammenlignes med. Verdien av norsk kontroll over
regnekraft for beredskap og suverenitet er ikke prissatt, og annen bruk av KI er ikke regnet. 40 av 137
parametere er åpne forutsetninger uten kilde som gir tallet. Kildene og koden er kontrollert av
er ikke prøvd; de ligger i nullalternativet, det satsingen sammenlignes med. Modellens anlegg eier både
bygget og brikkene; at staten bare eier tomt, bygg og kraft og leier dem ut, er ikke prøvd. Verdien av norsk
kontroll over regnekraft for beredskap og suverenitet er ikke prissatt, og annen bruk av KI er ikke regnet.
40 av 137 parametere er åpne forutsetninger uten kilde som gir tallet. Kildene og koden er kontrollert av
språkmodeller, ikke av fagpersoner, og resultatfilene er gjenskapt på samme maskin, ikke på en annen
ennå. To kjente begrensninger kan gjøre kjernekraft dyrere enn i modellen: kostnadsoverskridelsene kan ha
en tyngre hale, og tilpasning av et utenlandsk reaktordesign til norsk regelverk er ikke regnet inn
(\cref{sec:fagmiljoene,sec:begrensninger,sec:ikke-med}). To observasjoner i de samme kildene trekker
motsatt vei, mot raskere bygging og mer læring. Tre forenklinger trekker i favør av ny fornybar kraft:
ennå.
Forbeholdene går begge veier (\cref{sec:fagmiljoene,sec:begrensninger,sec:ikke-med}). To kjente
begrensninger kan gjøre kjernekraft dyrere enn i modellen: kostnadsoverskridelsene kan ha en tyngre hale, og
tilpasning av et utenlandsk reaktordesign til norsk regelverk er ikke regnet inn. Andre forhold trekker i
kjernekraftens favør: kildene viser mer læring og raskere bygging enn de frosne spennene tillater, og
sluttkostnader for store reaktorer i Finland og Korea under spennet i modellen \kilde{K28-008}. Emiratene, et
nytt kjernekraftland, bygde Barakah med en finansieringsramme på om lag 4\,400~USD/kW med renter, nominelt
\kilde{K03-011}, og fikk første enhet på nettet om lag tolv år etter vedtaket, under modellens nedre grense
på 15 år \kilde{K05-034}; andre nye kjernekraftland har brukt lenger tid. I om lag halvparten av
trekningene leses kostnadsspennet for kjernekraft som et budsjett, og en overskridelse legges oppå; leses
det som sluttkostnad i alle, blir medianen \tall{folsomheter.rad.1.normalisering.A.median}~mrd.~kr med eget
kjernekraftverk og \tall{folsomheter.rad.1.normalisering.B.median}~mrd.~kr med kjernekraft på nettet.
Observasjonene i kildene er ikke regnet inn. Tre forenklinger trekker i favør av ny fornybar kraft:
vannmagasinene jevner ut uten kostnad, verdien av vindkraft faller ikke når mye bygges, og en kald uke uten
vind er ikke regnet. Konklusjonen står i \cref{sec:konklusjon}.
vind er ikke regnet. To trekker mot satsingen med alle løsningene: prisen på regnekraft har ingen renter i
datasenterets byggetid, mens Norge betaler bygget og de første brikkene før oppstart, og bare Norge kan
rammes av stans i leveransene av brikker. Hva Statnetts funksjonskrav for datasentre på nettet koster, er
ikke regnet; det trekker i favør av løsningene på nettet. Høyere strømpris regnes som en gevinst for landet
så lenge Norge eksporterer kraft, og hvem som betaler, er ikke regnet. Konklusjonen står i
\cref{sec:konklusjon}.

View file

@ -17,7 +17,9 @@ ligningen står i, funksjonene i koden som regner den (navnet har nummeret i seg
\fil{ligninger.s9_kraftkostnad_dedikert}), og funksjonene som setter den sammen over årene eller over
trekningene. Tabellen er laget av \fil{rapport/lag_vedlegg.py} fra kartet \fil{modell/kart.md}, som
koden selv skriver (\fil{tokenfabrikker.kart}); kommandoen \texttt{kontroll} i samme modul sier om
kartet er likt det koden lager. Tabellen rettes ikke for hånd.
kartet er likt det koden lager. Tabellen rettes ikke for hånd. S12 har ingen egen funksjon: skrankene for ny
fornybar kraft regnes der ledetiden for nett, porteføljen i C og utbyggingen regnes (S22, S33 og S39), og
funksjonene står i kolonnen for dem som setter ligningen sammen.
Funksjonene ligger i \fil{src/tokenfabrikker/}.
\input{vedlegg_kart}

View file

@ -5,9 +5,9 @@
\noindent \Cref{tab:endringer} viser hva som er endret etter at forhåndsregistreringen først ble
godkjent, når, om det var før eller etter at noe var regnet, og hva endringen gjør med testen slik
punktet selv sier det. Hver endring er godkjent av prosjekteier og ført inn med dato og grunn under
«Endringer» i \fil{FORHANDSREGISTRERING.md} (\url{https://git.fromaitochitta.com/open/tokenfabrikker}),
der hele lista står; punkter av samme slag samme dag står her i én rad. De tre radene med fet skrift er
punktet selv sier det. Hver endring er ført inn med dato under «Endringer» i
\fil{FORHANDSREGISTRERING.md} (\url{https://git.fromaitochitta.com/open/tokenfabrikker}), der hele lista
står, med grunnen og prosjekteiers godkjenning der punktet gir dem; punkter av samme slag samme dag står her i én rad. De tre radene med fet skrift er
det ene avviket fra parameterfrysen, endringen av hypotesen (\cref{sec:endringen}) og det ene avviket som
er ført etter at resultatene forelå (\cref{sec:begrensninger}). «Del~I» er hypotesen, og «del~II» er
påstanden om at dedikert kjernekraft er best, som falt bort med endringen. Hovedkjøringen på de frosne
@ -30,7 +30,8 @@ Dato & Hva som ble endret & Før eller etter resultatene & Virkning på testen \
\endhead
\bottomrule
\endfoot
11.11.2026 & Ni presiseringer i kriteriene etter den første fagfellevurderingen: samlet dom, M2 mot
11.11.2026 & Ni presiseringer i kriteriene etter to uavhengige fagfellevurderinger (av språkmodeller,
\cref{sec:begrensning-gjennomgang}): samlet dom, M2 mot
prisen på regnekraft, dom per prisscenario uten vekter, faste utbyggingsbaner, M3, M4, M6 og M7,
referansekjøringen R og grensen på 25~\% for statens risiko.
& Før noe var regnet.
@ -41,12 +42,12 @@ referansekjøringen R og grensen på 25~\% for statens risiko.
& Strengere. \\
\addlinespace
12.11.2026 & Parameterfrysen ført inn (\cref{sec:frys}).
& Punktet sier ikke.
& Før noe var regnet (avsnittet punktet viser til).
& Kriteriene er ikke endret. \\
\addlinespace
12.11.2026 & Presisering 1 til 12 (\cref{tab:presiseringer}), blant annet stigen av programstørrelser,
trinnet dommene leses av på, andel trekninger, betingelser og nevneren i M6.
& Før noe var regnet.
& Før noe var regnet med modellen, men etter fagfellenes grove overslag (\cref{sec:begrensning-gjennomgang}).
& Ordlyden var ikke entydig nok til at dommene kunne settes uten valg i etterkant. 5 er strengere, i 7
og 9 er det strengeste valgt, 6 gir høyere krav; i 2 ville det andre valget gjort det lettere å felle på
strømpris. \\