docs(rapport): corrections after the fresh-reader test (round 9d)
Six new readers who had seen nothing, two of them well-informed supporters of nuclear power, read the built PDFs, the carousel proposal and the post; a controller tried to refute each finding. 73 findings: 30 confirmed, 42 partly, 1 rejected. No measured number, equation or code was wrong. One sentence in chapter 4 was (interest during the data centre's construction time does not apply equally to Norway and the competitor); clarification 143 corrects it and chapter 8 lists it as not computed. - grid-connected nuclear now stands next to the dedicated plant where the conclusion is drawn; caveats are listed in both directions - what the dedicated plant is in the model; Barakah in chapter 7 and 8 (new entry K28-011) - the direction of the discount rate is explained from S26 instead of "not explained"; what remains unexplained is still said outright - the price rule, the numerator and denominator of the scale target, the state's rate, requirements that hold by construction, the two build-rate caps - the rest from reading rounds 9a and 9b; title of K06-016 corrected - the web page rebuilt (7211 numbers checked against the result files) - report 171 pages, summary 2 pages (set in 10 pt); PDFs rebuilt The carousel is unchanged: its new wording is a proposal until the project owner has approved it. Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
parent
fe83f9f194
commit
6443c4f151
36 changed files with 826 additions and 418 deletions
Binary file not shown.
Binary file not shown.
Loading…
Add table
Add a link
Reference in a new issue