docs: review log part 31, changelog and project notes

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
Kjell Tore Guttormsen 2026-11-23 19:33:21 +01:00
commit 762b3ce0d5
Signed by: ktg
SSH key fingerprint: SHA256:JakMjO6FTBBzN0Bhfj9saOoEjaFxlSdYuZQQpM/lF9Q
3 changed files with 86 additions and 1 deletions

View file

@ -307,3 +307,17 @@ All notable changes to this project will be documented in this file.
two-page summary is set in 10 pt to stay on two pages. The results page is rebuilt but not published again;
the carousel changes were a proposal until the project owner approved them the same evening (carousel rebuilt, 28 slides, copied to `pdf/`); the post is moved to 2026-11-26. The report is 171 pages. Review
log part 30.
- Reading round 9e (2026-11-23): four new readers who had seen nothing (two well-informed supporters of nuclear
power, an economist and a sceptical reader) read the corrected PDFs, the carousel, the LinkedIn post and the
text of the results page, each with a controller: 49 findings, 17 confirmed, 30 partly, 2 rejected; no measured
number, equation or code was wrong and no new calculation was needed. The summaries, chapters 6, 8 and 10 and
the results page now say that "about twelve years after the decision" applies to the Emirates only, that a full
yes was in practice out of reach, that the first-year cash flow is a year without chip purchases, that the cost
range for nuclear power is the one the consultants gave the Nuclear Power Committee (which itself found nuclear
power unprofitable in Norway), that the study behind the dedicated plant found the grid as backup cheaper, why
security of supply holds less often with nuclear power on the grid, that the sources disagree on whether the
cost range is a budget or a final cost, that nature loss from wind power carries no price, and what the cooling
water and emission columns on the results page are. The source bank counts 1,237 entries (was 1,236). The
results page has 7,213 numbers and is published again to the same artifact. The carousel changes (ten slides)
are a proposal until the project owner says yes; `pdf/` keeps the approved carousel. The report is 171 pages.
Review log part 31.