docs: describe solution T through the levelised cost, ownership and scale

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
Kjell Tore Guttormsen 2026-11-13 09:48:37 +01:00
commit 79a00f3464
Signed by: ktg
SSH key fingerprint: SHA256:JakMjO6FTBBzN0Bhfj9saOoEjaFxlSdYuZQQpM/lF9Q
3 changed files with 29 additions and 11 deletions

View file

@ -96,3 +96,15 @@ All notable changes to this project will be documented in this file.
refuse solution T and a loss of demand until chapter 17 is taken through them. No result has been computed.
- Present values are now exactly rounded sums. As dot products the same computation did not give the same last
digit every time, for every solution. A test runs the same computation six times and requires equal numbers.
- Solution T and the loss of demand through the levelised cost, the business economics, the ownership forms
and scale (`nivaaisert.py`, `eierskap.py`, `skala.py`): the power cost per module, with a renewable module's
own portfolio as in C and the nuclear modules of T-K on shared units as in B; tariff, building, IT hardware
and residual value per module; and the factor of S51 per vintage in S19, S27, S31 and S42. For the five
solutions of chapters 0 to 16 without a loss every figure is unchanged to the last digit. A new independent
reader coded the same from the specification alone: 1 760 made-up paths through both codes, 6.6 million
figures compared, without a difference. Six clarifications (82–87) in chapter 16 say how the text is read
and name one property the reader found that is in favour of nuclear power on the grid in the business
economics (`modell/fagfellevurdering-utkast-2-og-3.md`, part 12). M5 and the verdicts do not know solution T yet. No
result has been computed.
- The technologies of a facility are kept in a fixed order. As a set of names their order differed from run to
run, and the last digit of the figures for solution C with it.