docs: describe solution T through the levelised cost, ownership and scale
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
parent
ad0be79fdc
commit
79a00f3464
3 changed files with 29 additions and 11 deletions
12
CHANGELOG.md
12
CHANGELOG.md
|
|
@ -96,3 +96,15 @@ All notable changes to this project will be documented in this file.
|
|||
refuse solution T and a loss of demand until chapter 17 is taken through them. No result has been computed.
|
||||
- Present values are now exactly rounded sums. As dot products the same computation did not give the same last
|
||||
digit every time, for every solution. A test runs the same computation six times and requires equal numbers.
|
||||
- Solution T and the loss of demand through the levelised cost, the business economics, the ownership forms
|
||||
and scale (`nivaaisert.py`, `eierskap.py`, `skala.py`): the power cost per module, with a renewable module's
|
||||
own portfolio as in C and the nuclear modules of T-K on shared units as in B; tariff, building, IT hardware
|
||||
and residual value per module; and the factor of S51 per vintage in S19, S27, S31 and S42. For the five
|
||||
solutions of chapters 0 to 16 without a loss every figure is unchanged to the last digit. A new independent
|
||||
reader coded the same from the specification alone: 1 760 made-up paths through both codes, 6.6 million
|
||||
figures compared, without a difference. Six clarifications (82–87) in chapter 16 say how the text is read
|
||||
and name one property the reader found that is in favour of nuclear power on the grid in the business
|
||||
economics (`modell/fagfellevurdering-utkast-2-og-3.md`, part 12). M5 and the verdicts do not know solution T yet. No
|
||||
result has been computed.
|
||||
- The technologies of a facility are kept in a fixed order. As a set of names their order differed from run to
|
||||
run, and the last digit of the figures for solution C with it.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue