feat(report): the four additional analyses in section 8.4
Section 8.4 of chapter 8 holds the four analyses made after the results (expected net present value, half the construction time for small units with the free choice of unit size, no displacement in the grid queue, net present value by term), outside the verdicts, each with its reservation and a list of what is not checked. Every number is a tillegg. key from the new module rapport/resultater/tillegg.py, which reads data/tillegg/ and stops the build if the files do not agree with the main run's. Section 8.3 now lists ten calculations not done, the row in appendix C says the analyses are done, one sentence in chapter 10 and one in each of three files of chapter 6 point to the section, and the README names the analyses and the commands that made them. The report is 177 pages and is copied to pdf/. The operator approved the wording 2026-11-24. Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
parent
3754917e0e
commit
7bf3d76e8e
10 changed files with 636 additions and 33 deletions
|
|
@ -4,7 +4,8 @@
|
|||
|
||||
Dette kapitlet samler de kjente begrensningene: to funn fra fagmiljøene som
|
||||
prosjekteier har avgjort skal stå som kjente begrensninger, begrensninger i kildene, i modellen og koden,
|
||||
og i gjennomgangene. Det modellen ikke regner i det hele tatt, står i \cref{sec:ikke-med}.
|
||||
og i gjennomgangene. Fire beregninger som kritikere og lesere ba om, er gjort etter at resultatene forelå;
|
||||
de står i et eget avsnitt, med det som ikke er kontrollert i dem. Det modellen ikke regner i det hele tatt, står i \cref{sec:ikke-med}.
|
||||
|
||||
% -----------------------------------------------------------------
|
||||
\subsection{To funn fra fagmiljøene som spennene ikke dekker}\label{sec:begrensning-fagmiljo}
|
||||
|
|
@ -223,10 +224,11 @@ kjernekraftens forventede ulykkeskostnad er regnet med (\cref{sec:ikke-med}).
|
|||
trekninger; trinnene med 10, 20 og 40 anlegg er ikke kjørt gjennom begge kodene. Kriteriet for kapitalkostnadens virkning i linje 28 av følsomhetslista er ikke avstemt,
|
||||
fordi leserens kode mangler en faktor (fagfelleloggen del~16). Hva «uavhengig» betyr i prosjektet, står
|
||||
i \cref{sec:begrensning-gjennomgang}.
|
||||
\item \emph{Flere beregninger er ikke gjort.} Seks kritikere og hver sin kontrollør, og
|
||||
\item \emph{Ti beregninger er ikke gjort.} Seks kritikere og hver sin kontrollør, og
|
||||
deretter seks nye lesere og hver sin kontrollør, alle språkmodeller, leste rapporten 23.~november 2026,
|
||||
etter at resultatene forelå, og pekte på flere beregninger enn de sju
|
||||
tingene spesifikasjonen sier skal rapporteres. Ingen av dem er gjort; en slik beregning ville være gjort
|
||||
etter at resultatene forelå, og pekte på fjorten beregninger ut over de sju
|
||||
tingene spesifikasjonen sier skal rapporteres. Fire av dem, nr.~11 til~14 under, er gjort og står i
|
||||
\cref{sec:begrensning-tillegg}. De ti andre er ikke gjort; en slik beregning ville også være gjort
|
||||
etter at resultatene forelå. Retningen står der den er kjent. (1) Et anlegg med en pris avtalt på forhånd for hele
|
||||
driftstiden; i modellen er prisen fast bare for hver årgang brikker, gjennom utstyrets levetid
|
||||
(\cref{eq:S16}). Det nærmeste er rad~12 i
|
||||
|
|
@ -242,8 +244,8 @@ kjernekraftens forventede ulykkeskostnad er regnet med (\cref{sec:ikke-med}).
|
|||
fornybar kraft; for de andre er retningen ikke oppgitt. (6) Kontantstrømmen år for år med de frosne tallene. Retningen i
|
||||
rad~3, 4 og 23 i følsomhetslista og i flate~(c) er forklart, og i rad~16 og 24 delvis
|
||||
(\cref{sec:res-folsomheter,sec:res-terskler}): der en bane taper penger, blir tapet mindre i dagens
|
||||
kroner med høyere rente og senere oppstart. Hvor stor del hvert ledd har, er bare regnet på det
|
||||
oppdiktede grunnlaget. (7) En prisregel der prisen settes av den marginale konkurrenten. En
|
||||
kroner med høyere rente og senere oppstart. Hvor stor del hvert ledd har i endringen med renten, er bare regnet på det
|
||||
oppdiktede grunnlaget; for hovedkjøringen står oppdelingen etter ledd i \cref{sec:begrensning-tillegg}. (7) En prisregel der prisen settes av den marginale konkurrenten. En
|
||||
fagfelle pekte før frysen på at den som bygger neste anlegg i USA, kan betale mer for strøm enn snittet
|
||||
for industri når strøm og nett er det som binder (fagfelleloggen del~2). En slik regel ville trukket i
|
||||
favør av satsingen. Regnet er bare en konkurrent som betaler EU-snittet for de største kundene, som er
|
||||
|
|
@ -254,19 +256,236 @@ kjernekraftens forventede ulykkeskostnad er regnet med (\cref{sec:ikke-med}).
|
|||
(\cref{sec:samfunnsokonomi}). Et høyere tall ville gitt lavere netto nåverdi for satsingen. (10) Renter i datasenterets byggetid.
|
||||
Prisen på regnekraft har dem ikke, men i Norges kontantstrøm betales bygg og første årgang over
|
||||
byggetiden før oppstart (\cref{sec:datasenteret}; avklaring~143 i spesifikasjonen). Det trekker mot
|
||||
satsingen med alle løsningene. (11) En følsomhet der statens uttak ikke tar plassen til noen private
|
||||
datasentre i nettkøen ($\delta_V = 0$). Andelen for R i M3 hviler nesten bare på denne forutsetningen
|
||||
(\cref{sec:res-dommer}), og den sparer nettinvestering bare for løsningene på nettet, men den koster
|
||||
også elavgiften de private ville betalt (punkt~9); retningen for netto nåverdi er ikke oppgitt.
|
||||
(12) Forventet netto nåverdi. Datafilene har medianen og persentilene, ikke snittet. Fordelingene har en
|
||||
lang venstre hale (1-persentilen for eget kjernekraftverk er
|
||||
\tall{dommer.normalisering.t1.A.nnv.p1}~mrd.~kr), så snittet kan ligge under medianen. (13) Halv
|
||||
byggetid for små enheter sammen med fritt valg av enhetsstørrelse for eget kjernekraftverk; hver for seg
|
||||
er de rad~9 og rad~8 i følsomhetslista. Kortere byggetid for små enheter er ikke dokumentert, så
|
||||
hovedkjøringen gir dem samme byggetid som store. (14) En oppdeling av tapet med ny fornybar kraft
|
||||
etter ledd. Følsomhetslista viser noen ledd hver for seg (\cref{sec:res-dommer}).
|
||||
satsingen med alle løsningene. Nr.~11 til~14 er gjort 24.~november 2026, etter at resultatene forelå, og står med
|
||||
tallene og forbeholdene i \cref{sec:begrensning-tillegg}: (11) ingen fortrengning i nettkøen
|
||||
($\delta_V = 0$), (12) forventet netto nåverdi, (13) halv byggetid for små enheter sammen med fritt valg
|
||||
av enhetsstørrelse for eget kjernekraftverk og $B'$, og (14) netto nåverdi etter ledd.
|
||||
\end{itemize}
|
||||
|
||||
% -----------------------------------------------------------------
|
||||
\subsection{Fire beregninger gjort etter resultatene}\label{sec:begrensning-tillegg}
|
||||
|
||||
Kritikerne og leserne av rapporten, alle språkmodeller, pekte på fjorten beregninger som ikke var gjort (punktet om dem i
|
||||
\cref{sec:begrensning-modell}). Fire av dem er gjort 24.~november 2026 på de frosne tallene, etter at
|
||||
resultatene forelå: forventet netto nåverdi (nr.~12 i lista), halv byggetid for små enheter sammen med fritt
|
||||
valg av enhetsstørrelse (nr.~13), ingen fortrengning i nettkøen (nr.~11) og netto nåverdi etter ledd
|
||||
(nr.~14). De fire ble valgt etter én regel, bestemt før noe ble regnet: først det som kan gjøres med de
|
||||
frosne verdiene alene, uten en ny verdi som må velges og uten en ny regel i modellkoden, uansett hvilken vei
|
||||
det ventes å trekke (avklaring~144 i spesifikasjonen). Planen, med hvilke beregninger, hvordan de regnes og
|
||||
hvor tallene lagres, ble skrevet og committet før noe ble regnet (avklaring 144 til~149), og prosjekteier
|
||||
godkjente den 23.~november 2026. Én ting var kjent da planen ble skrevet: de publiserte persentilene viste
|
||||
alt at snittet av netto nåverdi ligger under medianen i «normalisering» (avklaring~144~(d)). For de tre
|
||||
andre var ingen av de nye tallene sett. Kjent fra hovedkjøringen var rad~8 og~9 hver for seg, som begge
|
||||
trekker i favør av A og $B'$ (\cref{sec:res-folsomheter}), og at andelen for R i M3 hviler på $\delta_V$
|
||||
(\cref{sec:res-dommer}). Planen ventet at nr.~12 trekker mot satsingen og nr.~13 for
|
||||
A og $B'$; for nr.~11 var retningen ukjent, og nr.~14 har ingen retning (avklaring~144~(e)).
|
||||
|
||||
Det dette ikke er: beregningene står ved siden av dommene og teller ikke i dem. Ingen dom, terskel,
|
||||
parameter eller resultatfil er endret, og ingen av de fire gir en dom. Alt gjelder
|
||||
trinn~\tall{tillegg.trinn}, ett anlegg, som er trinnet dommene leses av på (\cref{sec:res-dommer}). Alle fire
|
||||
er regnet over alle \tall{tillegg.antall-trekninger} trekningene fra en egen, urørt kopi av koden (commit
|
||||
\texttt{979c13f}). Nr.~12, 13 og~14 er regnet med en egen kommando, som ble skrevet etter at resultatene
|
||||
forelå og committet før kjøringen; nr.~11 med kommandoen \texttt{scenario}, som fantes fra før. Modellkoden
|
||||
bak hovedkjøringen er ikke endret (fagfelleloggen del~32). De sju løsningene er de fem i sammenligningen (A,
|
||||
B, C, T-F og T-K) og de to som står ved siden av, $B'$ og R (\cref{sec:losninger}).
|
||||
Tallene er i mrd.~2025-kr med én desimal og andelene i prosent med to, som i \cref{sec:res-folsomheter}.
|
||||
|
||||
\paragraph{Nr.~12: forventet netto nåverdi}
|
||||
Dommen i M1 leses på medianen og andelen trekninger over null. Kritikerne ba om snittet, det forventede
|
||||
utfallet, fordi fordelingene har en lang venstre hale. For hver løsning er snittet av netto nåverdi regnet
|
||||
over trekningene der banen lar seg bygge, med standardfeilen, som er standardavviket
|
||||
delt på roten av antallet (avklaring~145). Banen lar seg bygge i \tall{tillegg.forventet.minste-antall-byggbare}
|
||||
av \tall{tillegg.antall-trekninger} trekninger for hver av de sju løsningene i begge scenarioene i
|
||||
\cref{tab:tillegg-forventet}. Persentilene ble regnet i samme gjennomløp og er de samme som i
|
||||
\fil{fordelinger.json}.
|
||||
|
||||
\begin{table}[htbp]
|
||||
\centering
|
||||
\small
|
||||
\setlength{\tabcolsep}{4pt}
|
||||
\caption{Nr.~12: snitt og median for netto nåverdi, trinn~\tall{tillegg.trinn}. Mrd.\ 2025-kr, nåverdi i
|
||||
2027. Standardfeilen sier hvor sikkert snittet er bestemt med \tall{tillegg.antall-trekninger} trekninger.
|
||||
Snittet gir ingen dom.}\label{tab:tillegg-forventet}
|
||||
\input{generert/tillegg-forventet}
|
||||
\end{table}
|
||||
|
||||
I «normalisering» ligger snittet under medianen for alle sju løsningene: for eget kjernekraftverk
|
||||
\tall{tillegg.forventet.normalisering.A.snitt} mot \tall{tillegg.forventet.normalisering.A.median}~mrd.~kr,
|
||||
for kjernekraft på nettet \tall{tillegg.forventet.normalisering.B.snitt} mot
|
||||
\tall{tillegg.forventet.normalisering.B.median}, og for ny fornybar kraft
|
||||
\tall{tillegg.forventet.normalisering.C.snitt} mot \tall{tillegg.forventet.normalisering.C.median}~mrd.~kr.
|
||||
Det forventede tapet er altså større enn det typiske, og det trekker mot satsingen med alle løsningene. I
|
||||
«knapphet varer» ligger snittet under medianen for A, B og $B'$, og over for C, R, T-F og T-K, der både
|
||||
snittet og medianen er positive; for C er snittet \tall{tillegg.forventet.knapphet.C.snitt} mot medianen
|
||||
\tall{tillegg.forventet.knapphet.C.median}~mrd.~kr. Der trekker snittet i favør av de fire. Standardfeilen
|
||||
er fra \tall{tillegg.forventet.normalisering.C.standardfeil} til
|
||||
\tall{tillegg.forventet.normalisering.Bm.standardfeil}~mrd.~kr i «normalisering». Snittet gir ingen dom:
|
||||
M1 dømmes som før på medianen og andelen over null (avklaring~145).
|
||||
|
||||
\paragraph{Nr.~13: halv byggetid for små enheter sammen med fritt enhetsvalg}
|
||||
Følsomhetslista har to rader for eget kjernekraftverk og $B'$ hver for seg: fritt valg av den
|
||||
enhetsstørrelsen som gir lavest kraftkostnad (rad~8), og halv byggetid for enheter under 300~MW (rad~9).
|
||||
Kritikerne ba om de to sammen. For hver trekning regnes kraftkostnaden for første anlegg for hver størrelse i
|
||||
det frosne settet, med halv byggetid for størrelsene under 300~MW og trekningens byggetid for de andre, og
|
||||
den billigste velges. Trekningen regnes så som rad~8 med den valgte størrelsen, og med halv byggetid overalt
|
||||
der byggetiden inngår når den valgte er under 300~MW (avklaring~146). Slik kan ikke en stor enhet få halv
|
||||
byggetid. Raden leses som en rad i følsomhetslista, i «normalisering» på hovedforløpet; ingen dom i den
|
||||
teller. Med samme kode ga beregningen uten halveringen rad~8, og uten det frie valget rad~9, slik de står i
|
||||
\fil{folsomheter.json}.
|
||||
|
||||
\begin{table}[htbp]
|
||||
\centering
|
||||
\small
|
||||
\setlength{\tabcolsep}{4pt}
|
||||
\caption{Nr.~13: median netto nåverdi med fritt enhetsvalg og halv byggetid for små enheter,
|
||||
«normalisering», trinn~\tall{tillegg.trinn}. Mrd.\ 2025-kr; andelen med netto nåverdi over null i prosent.
|
||||
Hovedkjøringen og rad~8 og~9 er fra \texttt{folsomheter.json}.}\label{tab:tillegg-halv}
|
||||
\input{generert/tillegg-halv}
|
||||
|
||||
\medskip
|
||||
\caption*{Antall trekninger som velger hver enhetsstørrelse, med de to radene sammen og i rad~8 alene.}
|
||||
\input{generert/tillegg-halv-valg}
|
||||
\end{table}
|
||||
|
||||
Medianen for eget kjernekraftverk blir \tall{tillegg.halv.A.sammen.median}~mrd.~kr, mot
|
||||
\tall{tillegg.halv.A.hoved.median} i hovedkjøringen, \tall{tillegg.halv.A.rad8.median} i rad~8 og
|
||||
\tall{tillegg.halv.A.rad9.median} i rad~9; for $B'$ blir den \tall{tillegg.halv.Bm.sammen.median}~mrd.~kr
|
||||
(\cref{tab:tillegg-halv}). De to sammen trekker altså mer i favør av A og $B'$ enn hver av radene alene, men mindre enn summen av de
|
||||
to.
|
||||
\tall{tillegg.halv.antall-halvert} av \tall{tillegg.antall-trekninger} trekninger velger en enhet under
|
||||
300~MW og får halv byggetid, og \tall{tillegg.halv.antall-annen-enn-rad-8} velger en annen størrelse enn i
|
||||
rad~8. Størrelsen 200~MW velges aldri i rad~8 og oftest av alle med de to sammen; hvorfor, er ikke undersøkt.
|
||||
I sammenligningen M7 er eget kjernekraftverk best alene i \tall{tillegg.halv.m7.A.sammen}~\% av
|
||||
trekningene, mot \tall{tillegg.halv.m7.A.hoved}~\% i hovedkjøringen. Ingen dommeord i raden skiller seg fra
|
||||
hovedkjøringens. Netto nåverdi er likevel ikke over null
|
||||
i noen trekning for A eller $B'$, heller ikke med begge endringene (\tall{tillegg.halv.A.sammen.over-null}
|
||||
og \tall{tillegg.halv.Bm.sammen.over-null}~\%). Forbeholdet står i avklaring~146~(f): kortere byggetid for
|
||||
små enheter er ikke dokumentert, og Kjernekraftutvalget skriver at et anlegg av flere små reaktorer trolig
|
||||
tar lengre tid å bygge enn et anlegg med store reaktorer og samme kapasitet (\cref{sec:fagmiljo-byggetid}).
|
||||
Hovedkjøringen gir små enheter samme byggetid som store. Tallene viser hva det ville bety om små enheter ble bygd på halve tiden, ikke at de blir
|
||||
det.
|
||||
|
||||
\paragraph{Nr.~11: ingen fortrengning i nettkøen}
|
||||
$\delta_V$ er andelen av statens uttak fra nettet som tar plassen til private datasentre i nettkøen i stedet
|
||||
for å kreve nytt nett. Den er en åpen forutsetning, trukket mellom 0,1 og 1 (\cref{sec:kraftsystemet}).
|
||||
Kritikerne ba om en beregning der statens uttak ikke tar plassen til noen. Her er $\delta_V = 0$ i alle
|
||||
trekninger, for alle sju løsningene, i «normalisering» på hovedforløpet, regnet med den committede kommandoen
|
||||
\texttt{scenario} og ingen ny kode (avklaring~147). Med null teller hele uttaket i kraft- og effektbalansen og
|
||||
får nytt nett, og verdien $V$ av det satsingen fortrenger i nettkøen, er null. Verdien ligger utenfor det
|
||||
frosne spennet og er et grensetilfelle, ikke et anslag. Den er den eneste verdien i de fire beregningene som
|
||||
ikke er frosset; den er gitt av spørsmålet og ikke valgt blant flere. Samme kommando uten den faste verdien ga
|
||||
hovedkjøringens tall til siste siffer, og tallene for eget kjernekraftverk, som ikke er på nettet, er
|
||||
uendret med $\delta_V = 0$.
|
||||
|
||||
\begin{table}[htbp]
|
||||
\centering
|
||||
\small
|
||||
\setlength{\tabcolsep}{3pt}
|
||||
\caption{Nr.~11: hovedkjøringen og $\delta_V = 0$, «normalisering», trinn~\tall{tillegg.trinn}. Median
|
||||
netto nåverdi i mrd.\ 2025-kr; andelen av trekningene der netto nåverdi er over null, og der M2, M3 og M4
|
||||
er oppfylt, i prosent. Hovedkjøringen er fra \texttt{dommer.json}.}\label{tab:tillegg-fortrengning}
|
||||
\input{generert/tillegg-fortrengning}
|
||||
\end{table}
|
||||
|
||||
Medianen blir litt bedre for B og $B'$, litt dårligere for C, T-F og T-K og dårligere for R, som går fra
|
||||
\tall{tillegg.fortrengning.R.hoved.median} til \tall{tillegg.fortrengning.R.null.median}~mrd.~kr; ingen
|
||||
løsning får positiv median (\cref{tab:tillegg-fortrengning}). For ny fornybar kraft går medianen fra
|
||||
\tall{tillegg.fortrengning.C.hoved.median} til \tall{tillegg.fortrengning.C.null.median}~mrd.~kr, og for
|
||||
kjernekraft på nettet fra \tall{tillegg.fortrengning.B.hoved.median} til
|
||||
\tall{tillegg.fortrengning.B.null.median}~mrd.~kr. Forsyningssikkerheten (M4) er oppfylt i færre trekninger
|
||||
for B, C, T-F og T-K, for B i \tall{tillegg.fortrengning.B.null.m4}~\% mot
|
||||
\tall{tillegg.fortrengning.B.hoved.m4}~\% og for C i \tall{tillegg.fortrengning.C.null.m4}~\% mot
|
||||
\tall{tillegg.fortrengning.C.hoved.m4}~\%. Strømprisen (M3) er for R oppfylt i
|
||||
\tall{tillegg.fortrengning.R.null.m3}~\% av trekningene mot \tall{tillegg.fortrengning.R.hoved.m3}~\%; andelen
|
||||
for R i M3 hviler altså på denne forutsetningen (\cref{sec:res-dommer}). I sammenligningen M7 er C best alene
|
||||
i \tall{tillegg.fortrengning.m7.C.null}~\% av trekningene, mot \tall{tillegg.fortrengning.m7.C.hoved}~\% i
|
||||
hovedkjøringen. Kommandoen setter egne dommeord; de er ikke rapportens dommer. Det eneste som skiller seg fra
|
||||
hovedkjøringens, er M2 for R: «holder ikke» mot «holder under betingelser».
|
||||
Beregningen trekker altså begge veier. For medianen av netto nåverdi trekker den svakt i favør av B og $B'$
|
||||
og mot C, R, T-F og T-K, men andelen over null blir litt høyere for C, R, T-F og T-K, for C
|
||||
\tall{tillegg.fortrengning.C.null.m1}~\% mot \tall{tillegg.fortrengning.C.hoved.m1}~\%. For
|
||||
forsyningssikkerheten trekker den mot B, C, T-F og T-K, for M2 mot C, R, T-F og T-K, og for strømprisen mot R. Hvorfor retningen er ulik for B og
|
||||
$B'$ og for de andre, er ikke undersøkt, og hvilke ledd som flytter medianen, er ikke regnet: oppdelingen i
|
||||
nr.~14 gjelder bare hovedkjøringen.
|
||||
|
||||
\paragraph{Nr.~14: netto nåverdi etter ledd}
|
||||
Kritikerne ba om en oppdeling av tapet etter ledd. I et eget gjennomløp av trekningene er den samme
|
||||
utbyggingen og det samme programmet som i hovedkjøringen regnet på nytt, og nåverdien av hvert av de tjue
|
||||
leddene i netto nåverdi (\cref{eq:S26}) er tatt ut med det fortegnet leddet har der (avklaring~148). Leddene
|
||||
står i fem grupper: datasenteret (S34, diskontert med $\rho_D$), kraften (S35, med $\rho_N$, og med $\rho_A$
|
||||
i A), de øvrige virkningene for resten av Norge (med $\rho_N$), restverdien (S40) og skattekostnaden.
|
||||
Kommandoen stanser hvis summen av leddene ikke er lik netto nåverdi, eller en gruppe ikke er lik modellens
|
||||
eget tall, i en trekning; den stanset ikke. Snittet av netto nåverdi er det samme som i nr.~12 til siste
|
||||
siffer. Oppdelingen gjelder hovedkjøringens netto nåverdi på trinn~\tall{tillegg.trinn} i «normalisering»;
|
||||
den forklarer ikke følsomhetsradene eller hvordan utfallet endrer seg med renten
|
||||
(\cref{sec:res-folsomheter,sec:res-terskler}).
|
||||
|
||||
\begin{table}[htbp]
|
||||
\centering
|
||||
\small
|
||||
\setlength{\tabcolsep}{4pt}
|
||||
\caption{Nr.~14: snittet av netto nåverdi i fem grupper, «normalisering», trinn~\tall{tillegg.trinn}.
|
||||
Mrd.\ 2025-kr, nåverdi i 2027. Snittene av gruppene summerer til snittet av netto nåverdi, i tabellen innenfor
|
||||
avrundingen; medianene ville ikke gjort det.}\label{tab:tillegg-ledd-grupper}
|
||||
\input{generert/tillegg-ledd-grupper}
|
||||
\end{table}
|
||||
|
||||
\begin{table}[htbp]
|
||||
\centering
|
||||
\footnotesize
|
||||
\setlength{\tabcolsep}{4pt}
|
||||
\caption{Nr.~14: snittet av de tjue leddene i netto nåverdi, «normalisering», trinn~\tall{tillegg.trinn}.
|
||||
Mrd.\ 2025-kr, nåverdi i 2027, med fortegnet leddet har i netto nåverdi. Hvert tall er avrundet for seg, så
|
||||
en gruppe summerer ikke alltid nøyaktig, og et ledd under 0,05~mrd.~kr står som 0,0. Symbolene er de samme
|
||||
som i \cref{sec:modellen}.}\label{tab:tillegg-ledd}
|
||||
\input{generert/tillegg-ledd}
|
||||
\end{table}
|
||||
|
||||
Snittene summerer til snittet av netto nåverdi; medianene, som også står i datafila, gjør ikke det, og
|
||||
derfor vises bare snittene (\cref{tab:tillegg-ledd-grupper,tab:tillegg-ledd}). For A, B og $B'$ ligger det
|
||||
meste av tapet i kraften: for eget kjernekraftverk \tall{tillegg.ledd.A.gruppe.kraft} av
|
||||
\tall{tillegg.ledd.A.nnv}~mrd.~kr. I A kjøper datasenteret ikke kraft, så hele kraftkostnaden ligger der i
|
||||
gruppen «kraften», og datasenteret går i snitt i pluss med \tall{tillegg.ledd.A.gruppe.datasenter}~mrd.~kr.
|
||||
Kraftsalget er regnet med faktoren i \cref{eq:S45}, regelen som tar bort overskuddet til kraftverkene på
|
||||
nettet; hva den betyr for ny fornybar kraft, viser rad~22 i følsomhetslista (\cref{sec:res-folsomheter}).
|
||||
For C, R, T-F og T-K er datasenteret den største gruppen: for ny fornybar kraft
|
||||
\tall{tillegg.ledd.C.gruppe.datasenter} mot \tall{tillegg.ledd.C.gruppe.kraft}~mrd.~kr for kraften.
|
||||
Inntekten er ikke den samme i de sju løsningene på trinn~\tall{tillegg.trinn}: i snitt fra
|
||||
\tall{tillegg.ledd.A.ledd.inntekt}~mrd.~kr for A til \tall{tillegg.ledd.R.ledd.inntekt}~mrd.~kr for R.
|
||||
Hvorfor er ikke undersøkt, så leddene bør ikke sammenlignes krone for krone mellom løsningene før det er
|
||||
gjort. Forbeholdet gjelder leddene hver for seg; netto nåverdi er den samme som i hovedkjøringen.
|
||||
|
||||
\paragraph{Det som er kontrollert, og det som ikke er det}
|
||||
Kjøringen ble startet og kontrollert av språkmodellen som styrer prosjektet, med et eget skript som bare
|
||||
leser datafilene, uten modellkoden: 36 kontroller, ingen avvik (fagfelleloggen del~32). Persentilene i nr.~12 er de samme som i \fil{fordelinger.json} til siste
|
||||
siffer, standardfeilen er standardavviket delt på roten av antallet, og snittet ligger innenfor grensene
|
||||
persentilene gir. I nr.~13 ga samme kode uten halveringen rad~8 og uten det frie valget rad~9 til siste
|
||||
siffer, og tellingene av valgt enhet stemmer. I nr.~11 ga kontrollkjøringen hovedkjøringens tall til siste
|
||||
siffer, og tallene for A er uendret med $\delta_V = 0$. I nr.~14 stanset ikke kommandoen, og snittet av netto
|
||||
nåverdi er det samme som i nr.~12. De åtte filene fra hovedkjøringen er urørt, og de nye filene har grunnlaget
|
||||
fra frysen. Skriptet som lager tallene i dette avsnittet, prøver noen av de samme sammenhengene på nytt hver
|
||||
gang rapporten bygges, og stanser bygget hvis en ikke holder.
|
||||
|
||||
Dette er ikke kontrollert:
|
||||
\begin{itemize}[leftmargin=*]
|
||||
\item Tallene som er nye (snittene, raden med rad~8 og~9 sammen, tallene med $\delta_V = 0$ og leddene),
|
||||
er regnet én gang på de frosne tallene, med én kode. Den uavhengige leseren kodet avklaring 145, 146 og
|
||||
148 på oppdiktede tall (avklaring~150), ikke på de frosne. Kontrollene er sammenligninger med
|
||||
hovedkjøringens filer og indre sammenhenger; snittet er bare holdt mot grensene persentilene gir.
|
||||
\item Faktoren i (S45) for programmets felles enheter i B og T-K ble ikke prøvd i sammenligningen med
|
||||
leseren, fordi den var 1 i alle de oppdiktede trekningene. Om den er under 1 i noen av de frosne
|
||||
trekningene, er ikke sett: ingen committet kommando skriver faktoren. Det som er kontrollert, er at
|
||||
gruppen «kraften» er lik modellens egen nåverdi for kraften i hver trekning for B og T-K; en feil faktor
|
||||
ville stanset kommandoen.
|
||||
\item Kjøringen er ikke gjentatt, og ikke gjort på en annen maskin.
|
||||
\item Hvorfor retningen i nr.~11 er ulik for B og $B'$ og for de andre løsningene, og hvorfor inntekten
|
||||
i nr.~14 er ulik mellom løsningene, er ikke undersøkt. Det samme gjelder hvorfor 200~MW aldri velges i
|
||||
rad~8.
|
||||
\end{itemize}
|
||||
Filene ligger i \fil{data/tillegg/}: \fil{forventet.json}, \fil{halv_byggetid.json}, \fil{ledd.json} og
|
||||
\fil{sjekksummer.json}, og for nr.~11 \fil{ingen_fortrengning/} med inngangsfila og kontrollkjøringen.
|
||||
Sjekksummene står i fagfelleloggen del~32.
|
||||
|
||||
% -----------------------------------------------------------------
|
||||
\subsection{Gjennomgangene}\label{sec:begrensning-gjennomgang}
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue