docs: enter the project owner's decisions on clarifications 87 and 93
Clarification 17 of the pre-registration, approved 2026-11-13 before anything is computed: the conditions of a solution can be named when every target it holds under conditions in has one that can be named, and the condition behind M5 counts as named and is written out with the source. Dated entry with the reason under «Endringer». The grid connection of a nuclear plant stays out of the business economics, and the report says so. Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
parent
64d24c7800
commit
7f7cacb4eb
5 changed files with 41 additions and 14 deletions
|
|
@ -50,8 +50,9 @@ carousel, Python code, and a Claude plugin (own repo, later).
|
|||
the power system and the cash flow, and 82 to 87 those made when T and the loss of demand were taken through
|
||||
the levelised cost, ownership and scale, and 88 to 94 those made when M5 and the verdicts were coded for
|
||||
five solutions and three sensitivities of chapter 17.8 as switches, all settled against an independent
|
||||
reader's code. Clarification 93 (which conditions can be named when M5 holds under conditions) is a proposal
|
||||
the operator has not decided; `dommer.del_I` takes the answer as an argument.
|
||||
reader's code. Clarification 93 (which conditions can be named when M5 holds under conditions) was approved
|
||||
by the operator 2026-11-13 and is clarification 17 of the pre-registration; it is not coded yet, and
|
||||
`dommer.del_I` takes the answer as an argument.
|
||||
Solution T (`Losning.T_F`, `Losning.T_K`) goes through `lag_plan` (a `Trinnvisplan`) and `regn_program`
|
||||
with a module in the place of a facility (`Programresultat.P_enhet`): renewable modules have their own
|
||||