Draft 3 has 47 equations. Changes follow the pre-read of draft 2
(44 findings), two independent reviews of draft 3 (55 and 22 findings)
and an independent control of the corrections (39 findings). Each
finding was checked by the project before it was corrected; the log
says what was done with each.

Main changes: all parameters in 2025 kroner; explicit cash flows per
solution; the price of compute set per MW sold, so that unsold capacity
is not charged to Norway alone; power plants on the grid are never
credited a surplus (S45); the reading of the Norwegian nuclear cost
range is drawn (S46); dimensioning, build-out and residual value are
specified. Eight proposed clarifications of the pre-registration are
listed in chapter 15 and are not entered there.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
Kjell Tore Guttormsen 2026-11-12 00:57:41 +01:00
commit 9e3feb367e
Signed by: ktg
SSH key fingerprint: SHA256:JakMjO6FTBBzN0Bhfj9saOoEjaFxlSdYuZQQpM/lF9Q
4 changed files with 1013 additions and 410 deletions

File diff suppressed because it is too large Load diff