docs(rapport): the carousel after rounds 9c and 9d, approved by the project owner
49 changes from the previously approved carousel: grid-connected nuclear next to the dedicated plant, caveats in both directions, the price rule, the scale target, what holds by definition, and the page count (171). 28 slides, rebuilt and copied to pdf/. The post is moved to 2026-11-26; a dated addendum in review log part 30 says so. Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
parent
09c46c08cd
commit
b5ce07e0b6
5 changed files with 136 additions and 69 deletions
|
|
@ -2630,6 +2630,12 @@ oppføringen 12. november; sammendragene sier derfor «presiseringene» uten tal
|
|||
presiseringene», og vedlegg C sier det om raden for den dagen. Ekte telefon, skjermleser og gjenskaping på en annen maskin er ikke prøvd. Rapporten er ikke
|
||||
fagfellevurdert av mennesker.
|
||||
|
||||
**Tillegg samme kveld (2026-11-23).** Prosjekteier godkjente alle endringene som var lagt fram: karusellen (49
|
||||
endringer fra den forrige godkjente utgaven, 28 bilder; bygget og lagt i `pdf/`), forslaget til nytt innlegg,
|
||||
endringene i ordlyden i sammendragene og at nettsiden publiseres på nytt. Innlegget er utsatt fra tirsdag
|
||||
2026-11-24 til torsdag 2026-11-26. Nettsiden er ikke publisert på nytt ennå. En ny prøve med nye lesere på det
|
||||
rettede materialet er ikke kjørt; den er planlagt før innlegget går ut.
|
||||
|
||||
## Forbehold
|
||||
|
||||
Fagfellene er språkmodeller. De leste postene i kildebanken, ikke primærkildene. Funnene er kontrollert av
|
||||
|
|
|
|||