docs: review log part 29, reading round 9b and what was corrected

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
Kjell Tore Guttormsen 2026-11-23 10:31:40 +01:00
commit eae84e35ba
Signed by: ktg
SSH key fingerprint: SHA256:JakMjO6FTBBzN0Bhfj9saOoEjaFxlSdYuZQQpM/lF9Q
3 changed files with 99 additions and 5 deletions

View file

@ -267,3 +267,14 @@ All notable changes to this project will be documented in this file.
slide 6, which requirement can fell a solution on slide 18, "every number points to a source", who checked the slide 6, which requirement can fell a solution on slide 18, "every number points to a source", who checked the
sources, and the advice to build stepwise) and in several smaller ones. The report is 155 pages. Review log sources, and the advice to build stepwise) and in several smaller ones. The report is 155 pages. Review log
part 28. part 28.
- Reading round 9b (2026-11-23): six independent readers, each with a controller, read the body of the report
(chapters 2 to 9, the appendices, the reference list) and the public surface from a clean clone. No measured
number, equation or code was wrong. Corrected: chapter 4 no longer says the amount of spent fuel is reported
(it is not computed in the result files); the README and the tool configuration say Python 3.12; chapter 6.5
says outright that the median rises with the required return for the four nuclear solutions, with the part
that follows from the equations and the part that is not explained; chapter 8 lists seven things the
specification says shall be reported that are not computed, the seven known-answer misses and three notes
on the frozen parameter file (which is unchanged); chapter 7 separates measured learning rates from
estimates. The reference list leaves out work notes (local copies, tool names) and lists the 23 entries
another entry points to (331 entries). The report is 158 pages; slide 27 of the carousel follows. The
submission in `innspill/` is unchanged. Review log part 29.

View file

@ -165,7 +165,8 @@ carousel, Python code, and a Claude plugin (own repo, later).
conditions use forty. conditions use forty.
- `nettside/`: the interactive results page (part 12). `lag_nettside.py` builds `index.html` from `mal.html` and the result files with the report's number format; one self-contained file with no external requests; the controls choose only among computed results. Every shown number carries file, path and raw value in a manifest (`tall.json`, gitignored, also embedded in the page). Rebuild: `.venv/bin/python nettside/lag_nettside.py`. Version 2 (2026-11-22, after the review in `private/del12-rapporter/`): the page opens with the answer and 101 dots per solution (percentiles 0 to 100 from `fordelinger.json`), then scale against petroleum (`ved_siden_av_M6`), the ladder of programme sizes with the share that cannot be built, an animated timeline, a scroll story over the scenarios, the 3D landscape and the explorer; it says outright that M6 is «holder under betingelser» when scarcity lasts. Page text says «beregning» for a draw. A number is a `span.t[data-k]`; a click opens its file, path and raw value. The session's own check: `sjekk_tall.py` and `snap.mjs` in `private/del12-rapporter/`. The operator shared the page as a Claude artifact 2026-11-22 (https://claude.ai/artifact/FRKuLpXxb1UaP2FinPVh9p, open to anyone with the link, linked from the README); it is a snapshot, so after a rebuild it is published again to the same artifact, with the operator's yes. - `nettside/`: the interactive results page (part 12). `lag_nettside.py` builds `index.html` from `mal.html` and the result files with the report's number format; one self-contained file with no external requests; the controls choose only among computed results. Every shown number carries file, path and raw value in a manifest (`tall.json`, gitignored, also embedded in the page). Rebuild: `.venv/bin/python nettside/lag_nettside.py`. Version 2 (2026-11-22, after the review in `private/del12-rapporter/`): the page opens with the answer and 101 dots per solution (percentiles 0 to 100 from `fordelinger.json`), then scale against petroleum (`ved_siden_av_M6`), the ladder of programme sizes with the share that cannot be built, an animated timeline, a scroll story over the scenarios, the 3D landscape and the explorer; it says outright that M6 is «holder under betingelser» when scarcity lasts. Page text says «beregning» for a draw. A number is a `span.t[data-k]`; a click opens its file, path and raw value. The session's own check: `sjekk_tall.py` and `snap.mjs` in `private/del12-rapporter/`. The operator shared the page as a Claude artifact 2026-11-22 (https://claude.ai/artifact/FRKuLpXxb1UaP2FinPVh9p, open to anyone with the link, linked from the README); it is a snapshot, so after a rebuild it is published again to the same artifact, with the operator's yes.
- `requirements.txt` (numpy, scipy) and `requirements-dev.txt` (pytest, ruff, mypy) pin exact versions; - `requirements.txt` (numpy, scipy) and `requirements-dev.txt` (pytest, ruff, mypy) pin exact versions;
`pyproject.toml` only configures the tools (ruff `ALL`, mypy strict). `pyproject.toml` only configures the tools (ruff `ALL`, mypy strict, Python 3.12; `UP047` is ignored
because `src/` is left as the main run was made from it).
## Conventions ## Conventions
- **Sources:** every technical claim and number is checked against the primary source (page and verbatim quote) - **Sources:** every technical claim and number is checked against the primary source (page and verbatim quote)
@ -216,9 +217,10 @@ carousel, Python code, and a Claude plugin (own repo, later).
run's verdicts («normalisering», the step the verdicts are read on), M7 without a verdict and the main run's verdicts («normalisering», the step the verdicts are read on), M7 without a verdict and the main
known limitations, every measured number with `\tall{key}`. Chapter 7 builds on area 27 of the source bank known limitations, every measured number with `\tall{key}`. Chapter 7 builds on area 27 of the source bank
and names no company; chapter 9 renders chapters 13 and 17.9 of the specification with the wording after and names no company; chapter 9 renders chapters 13 and 17.9 of the specification with the wording after
the change of the hypothesis. Chapter 8 lists four things the specification says shall be reported that the change of the hypothesis. Chapter 8 lists seven things the specification says shall be reported that
are not computed (build-out with stopping, the two terms of S19, what households and businesses pay, the are not computed (build-out with stopping, the two terms of S19, what households and businesses pay, the
split of A against B′), and two observations from area 27 outside the frozen ranges in favour of nuclear split of A against B′, spent fuel, the need for labour and capital, the table per price area), the seven
known-answer misses, three notes on the frozen parameter file (review log part 29), and two observations from area 27 outside the frozen ranges in favour of nuclear
power (review log part 25). Chapters 3 to 5 were read against the specification by independent readers power (review log part 25). Chapters 3 to 5 were read against the specification by independent readers
2026-11-14. Appendix B (the 137 parameters and the 37 lines of the sensitivity list) and the 2026-11-14. Appendix B (the 137 parameters and the 37 lines of the sensitivity list) and the
reference list are generated by `rapport/lag_vedlegg_parametere.py` and `lag_referanser.py` into reference list are generated by `rapport/lag_vedlegg_parametere.py` and `lag_referanser.py` into
@ -227,8 +229,9 @@ carousel, Python code, and a Claude plugin (own repo, later).
of the pre-registration, when, before or after the results, and the effect on the test as the entry of the pre-registration, when, before or after the results, and the effect on the test as the entry
itself states it; it quotes no reply of the operator and points to the full list in itself states it; it quotes no reply of the operator and points to the full list in
`FORHANDSREGISTRERING.md` (the operator's decision 2026-11-14; a new entry under «Endringer» needs a row). The reference list `FORHANDSREGISTRERING.md` (the operator's decision 2026-11-14; a new entry under «Endringer» needs a row). The reference list
holds every entry cited with `\kilde{...}` or in the parameter file, with the entry's title and `Kilde` holds every entry cited with `\kilde{...}` or in the parameter file, and every entry the `Kilde` field of
field; a cited entry without a confirmed `Kontroll` line stops the script. `\kilde` links each id to its a listed entry points to, with the entry's title and `Kilde` field without the work notes (`ARBEIDSNOTATER`:
local copies, tool names, who added it; a trace left stops the script); a cited entry without a confirmed `Kontroll` line stops the script. `\kilde` links each id to its
item (ranges are written `K27-008 til K27-011`). `rapport/notat.tex` is the two-page summary and item (ranges are written `K27-008 til K27-011`). `rapport/notat.tex` is the two-page summary and
`rapport/kap10-konklusjon.tex` the conclusion chapter. They, `sammendrag.tex`, the opening of chapter 1 and `rapport/kap10-konklusjon.tex` the conclusion chapter. They, `sammendrag.tex`, the opening of chapter 1 and
`README.md` are written for a reader who does not know the project (the operator's requirement `README.md` are written for a reader who does not know the project (the operator's requirement

View file

@ -2246,6 +2246,86 @@ som prosjekteierens vurdering: om lærdommen «ikke eget kjernekraftverk» er en
kjernekraft; den står, fordi tallene bærer den og den er ført som lærdom, ikke som dom. Rapportens kropp kjernekraft; den står, fordi tallene bærer den og den er ført som lærdom, ikke som dom. Rapportens kropp
(kapittel 2 til 9 og vedleggene) er ikke lest i denne runden. (kapittel 2 til 9 og vedleggene) er ikke lest i denne runden.
## Del 29. Leserunde 9b: rapportens kropp og den offentlige flaten (2026-11-23)
**Hva som ble lest.** Kapittel 2 til 9, vedleggene, kildelista og det en besøkende møter i repoet. Seks
uavhengige lesere, hver med sin oppgave: forhåndsregistreringen mot rapporten, ligningene mot spesifikasjonen og
koden, prosaen i resultatkapitlet mot resultatfilene, kildepåstandene i tre ledd (rapport, kildepost,
primærkilde), språk og form på alle sidene som bilder, og den offentlige flaten fra en ren klone. Hver leser
fikk sin egen kontrollør. Lesere og kontrollører er språkmodeller. Kontrollørene ble ved en feil startet
samtidig med leserne, stoppet etter om lag ti sekunder og startet på nytt da hver leser var ferdig.
**Hva de fant.** 56 funn. Kontrollørene bekreftet 43, bekreftet 12 delvis, avviste 1 og la til 1. Ingen fant
et målt tall, en ligning eller kode som er feil. Fra en ren klone besto de 1 023 prøvene, den oppdiktede
gjenskapingen ga «identisk», og PDF-ene bygget med samme tekst. Av 33 gamle funn i kapittel 3 til 5 var 32
rettet. Tre funn ble regnet som stoppere:
1. Innspillet til KI-strategien sier «hvert tall i modellen peker til en kilde». Det er samme feil som ble
rettet i de andre tekstene etter runde 9a. Innspillet er ikke rørt: prosjekteieren har ikke sagt om det ble
sendt, og med hvilken ordlyd. Funnet står åpent.
2. Kapittel 4 sa at mengden brukt brensel «rapporteres ved siden av» M5. Ingen resultatfil har mengden. Rettet:
kapitlet sier nå at uttrykket står og at koden har funksjonen, men at mengden ikke er regnet ut.
3. README-en sa «Python 3.11 eller nyere». Pakkene krever 3.12. Rettet, også i verktøyoppsettet; regelen som
da ber om ny skrivemåte i fem funksjoner under `src/`, er unntatt, fordi koden hovedkjøringen er gjort
fra, ikke røres.
**Hva som ellers ble rettet** (godkjent av prosjekteieren 2026-11-23):
- *Kapittel 6.5, flaten for avkastningskrav mot reaktorkostnad.* Teksten stilte hjørnet med lave krav fram som
det gunstige. Resultatfila viser det motsatte: for alle fire løsningene med kjernekraft, og for begge
kravene, er medianen høyere i den høyeste klassen for kravet enn i den laveste, i hver klasse av
reaktorkostnaden (for eget kjernekraftverk −205,4 mot −138,8 mrd. kr med lavest reaktorkostnad). Teksten sier
nå retningen rett ut og viser til de fire radene i følsomhetslista med samme mønster. Én del følger av
ligningene: i løsningen med eget kjernekraftverk selger kraftverket ingen kraft, så kontantstrømmen i (S35) er
bare kostnader, og nåverdien av den blir mindre negativ når renten stiger; investeringene føres uten renter i
byggetiden. For datasenteret og for kraftverk på nettet gir ligningene ingen retning alene, og resultatfilene
har ikke kontantstrømmen år for år. Rapporten sier derfor at retningen for hele medianen ikke er forklart.
Ingen ny regning er gjort på de frosne tallene; 16 nye tallnøkler leser ruter som alt sto i `terskler.json`.
- *Kapittel 8.* «Fire ting spesifikasjonen sier skal rapporteres, er ikke regnet» er blitt sju: brukt brensel,
behovet for arbeidskraft og kapital, og tabellen per prisområde ved tidslinjen er lagt til. De sju prøvene
mot kildene som bommer, står nå der med avvikene slik prøvene oppgir dem; de gjelder nivåisert kostnad og
prislinja, ikke netto nåverdi. Tre forhold ved den frosne parameterfila står der (se under).
- *Kapittel 7.* «Bare IEAs implisitte rate ligger over øvre grense» er rettet til at ingen målt rate ligger
over, mens tre anslag gjør det (IEA etter 2040, Barakah, en planlagt tvilling). Nedre grense for læring er
prosjektets lesning; kilden knytter kostnadsøkningen mest til større reaktorer. Den britiske riksrevisjonens
2 % og 6 % er nominelle renter, mens modellens er reelle.
- *Kildelista.* Arbeidsnotater (lokale kopier under `private/`, verktøynavn, «lagt til av kontrolløren») er tatt
ut av 31 innførsler i skriptet som lager lista; et spor som står igjen, stopper skriptet. 23 poster som en
annen post viser til («som K27-124»), står nå i lista, så hver slik henvisning kan følges: 331 poster mot 308.
- *Mindre.* Statnetts stans «ventes opphevet senest 1. august 2027» (forventning, ikke frist); forbeholdet ved
M5 (iii) der dommen står; «i drift» ved M6 forklart etter avklaring 53; $L_N$ er driftstiden for alle anlegg,
ikke bare kjernekraftverk; pristerskelen rangerer ikke løsningene slik medianen gjør; henvisningen for 47,8 %
viser til fila tallet er lest fra; vedleggene kalles «vedlegg», ikke «kapittel»; kommandoene skrives med
mellomrom; sammendraget på to sider er merket «utkast».
**Den frosne parameterfila er ikke rørt.** Tre forhold er ført i kapittel 8 i stedet. Merknaden til
overskridelsen $o_\xi$ oppgir øvre kvartil som forholdet mellom sluttkostnad og budsjett (2,35 og 2,79), mens
parameteren er andelen over budsjett (1,35 og 1,79); verdiene som er brukt, står i riktig enhet. Toppunktet på
10 år for ledetiden for nytt nett står ikke i postene, og merknaden er tom. Én av de tre postene for vind på
land har en kontrollinje som bare sier at posten er lagt til av kontrolløren. Prosjekteieren avgjorde at fila
står; ingen av de tre er ført som avvik fra frysen.
**Kontroll etter rettingene** (gjort av språkmodellen som styrer prosjektet, med egne oppslag). Rettingene er
ført inn av en hjelper og lest endring for endring. Sjekksummen for parameterfila og innspillet er uendret.
Ingen av de 6 927 gamle tallnøklene er borte eller endret; de 16 nye er slått opp på nytt i `terskler.json`, og
retningen i flaten er regnet for alle 40 parene av ruter. Påstandene i de nye avsnittene er holdt mot
spesifikasjonen (S3, S26, S34, S35, S46, kapittel 0, 4, 10 og 17.1, avklaring 36, 53 og 54), parameterfila,
prøvene og tolv kildeposter. Ett sted hadde hjelperen skrevet mer enn kildeposten dekket (riksrevisjonens
renter): primærkilden er hentet og lest på nytt, de to notene står ordrett, og posten K27-139 har fått tillegget
med dato. Kildelista er sammenlignet innførsel for innførsel med den forrige: ingen er borte, og bare
arbeidsnotatene er tatt ut. Prøvene består (1 023, sju kjente bom), ruff og mypy er rene. PDF-ene er bygget på
nytt uten feil; sammendraget er to sider og karusellen 28 bilder, med bare sidetallet på bilde 27 endret.
Rapporten ble 158 sider. De endrede sidene er sett som bilder.
**Ikke rettet, og hvorfor.** Innspillet (punkt 1). 32 funn av typen «kan vente», blant dem ordlyd i tre rader i
vedlegg C, bredden på én tabell og lokale stier i fagfelleloggen. Tittelen på posten K06-016 i kildebanken, og
dermed i kildelista, sier fortsatt «til senest 1. august 2027». «Mest sannsynlig 10 år» for nettets ledetid
står i kapittel 3; forholdet er ført i kapittel 8. Kapittel 8 nevner fortsatt to observasjoner utenfor de frosne
spennene i kjernekraftens favør, ikke de to anslagene som nå står i kapittel 7. Nettsiden er ikke bygget på
nytt; den sier at de to tallene som går motsatt vei, ikke er forklart i rapporten, og det gjelder fortsatt for
medianen som helhet. Ikke kontrollert: 39 av 54 ligninger ut over at funksjonen finnes, primærkildene utenom
de 30 påstandene leserne tok, ekte telefon og skjermleser, og gjenskaping på en annen maskin.
## Forbehold ## Forbehold
Fagfellene er språkmodeller. De leste postene i kildebanken, ikke primærkildene. Funnene er kontrollert av Fagfellene er språkmodeller. De leste postene i kildebanken, ikke primærkildene. Funnene er kontrollert av