docs: clarification 138, review log part 18, and the changed hypothesis in README, CHANGELOG and CLAUDE.md
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
parent
5a54fba628
commit
ebe3bf9515
5 changed files with 96 additions and 7 deletions
|
|
@ -204,3 +204,12 @@ All notable changes to this project will be documented in this file.
|
|||
nuclear plant per data centre is one of the power solutions that are compared, on equal terms. The targets
|
||||
M1 to M6 and their thresholds are unchanged. The texts and the code that give that solution a verdict of its
|
||||
own are rewritten before anything is computed (`FORHANDSREGISTRERING.md`, «Endringer»).
|
||||
- The power solutions are compared on equal terms (clarifications 135, 137 and 138), written before the code
|
||||
and before any result: for each of the five solutions the share of the draws in which it has the highest
|
||||
net present value alone and the share in which it shares the place, with no verdict of its own on dedicated
|
||||
nuclear power, and no part II. A weakness in the first rule was found on made-up draws and corrected: the
|
||||
two stepwise solutions are the same path where no module gets nuclear power, and those draws were counted
|
||||
as «none best». An independent reader coded the rule from the text alone: no deviation in 25 000 made-up
|
||||
runs. The surfaces now carry figures for the classes along their axes (clarification 134), and `kontroll`
|
||||
prints a line per file as it goes. The EEA assessment of the ownership forms is proposed as «usikker» for
|
||||
all four (clarification 136) and awaits the project owner.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue