nuclear plant per data centre is one of the power solutions that are compared, on equal terms. The targets
M1 to M6 and their thresholds are unchanged. The texts and the code that give that solution a verdict of its
own are rewritten before anything is computed (`FORHANDSREGISTRERING.md`, «Endringer»).
- The power solutions are compared on equal terms (clarifications 135, 137 and 138), written before the code
and before any result: for each of the five solutions the share of the draws in which it has the highest
net present value alone and the share in which it shares the place, with no verdict of its own on dedicated
nuclear power, and no part II. A weakness in the first rule was found on made-up draws and corrected: the
two stepwise solutions are the same path where no module gets nuclear power, and those draws were counted
as «none best». An independent reader coded the rule from the text alone: no deviation in 25 000 made-up
runs. The surfaces now carry figures for the classes along their axes (clarification 134), and `kontroll`
prints a line per file as it goes. The EEA assessment of the ownership forms is proposed as «usikker» for
all four (clarification 136) and awaits the project owner.