docs(rapport): close the gaps from critique round 9c

Six critics and six controllers read the report 2026-11-23 and raised 83
objections; none shows a measured number, an equation or the code to be
wrong. This commit writes the missing reservations where the reader meets
the number, and says what is not computed.

- Summary, two-page summary, chapters 1 and 10, README: what the test did
  and did not try, what the 1.1 % share rests on, the interest rate, the
  build pace, and the lesson on a dedicated nuclear plant as what the
  comparison shows (no verdict, as the pre-registration says).
- Chapters 2 to 6: reservations at the numbers (shares are not
  probabilities, the scenario is a choice, sensitivities one at a time).
- Chapters 8 and 9, appendix C: computations the critics asked for that
  are not made, what "independent" means in the project, that the
  pre-registration was not in a public register.
- Source bank area 28 (10 entries, after the results, feeding no
  parameter): long leases, the largest compute deals, recent reactor
  costs; cited in chapters 4, 7 and 8. K09-004 gets its NOU quote.
- PDFs rebuilt: report 164 pages, summary 2 pages.

Every change was read by a controller and the corrections entered; keys,
source entries and quotes were checked again by script. The carousel is
not changed in this commit.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
Kjell Tore Guttormsen 2026-11-23 15:58:13 +01:00
commit fe83f9f194
Signed by: ktg
SSH key fingerprint: SHA256:JakMjO6FTBBzN0Bhfj9saOoEjaFxlSdYuZQQpM/lF9Q
24 changed files with 544 additions and 109 deletions

View file

@ -17,7 +17,8 @@ carousel, Python code, and a Claude plugin (own repo, later).
22–26 third round for the addition to the direction: fast start, stepwise build-up, on-device compute,
avoided emissions and cooling water; 27a and 27b fourth round, what researchers and expert bodies say
about series building, reactor size, timelines, power purchase agreements and the state's role, made
after the freeze and feeding no parameter).
after the freeze and feeding no parameter; 28 the deals and cost figures the critics of round 9c pointed to
2026-11-23, made after the results, feeding no parameter and used only in the report text).
Every model parameter must trace to an entry here.
- `FORHANDSREGISTRERING.md`: the approved direction and pre-registered criteria (M1–M7). Committed.
- `modell/spesifikasjon.md`: the model specification (equations S1–S54; chapter 17, the addition to the