docs(rapport): close the gaps from critique round 9c
Six critics and six controllers read the report 2026-11-23 and raised 83 objections; none shows a measured number, an equation or the code to be wrong. This commit writes the missing reservations where the reader meets the number, and says what is not computed. - Summary, two-page summary, chapters 1 and 10, README: what the test did and did not try, what the 1.1 % share rests on, the interest rate, the build pace, and the lesson on a dedicated nuclear plant as what the comparison shows (no verdict, as the pre-registration says). - Chapters 2 to 6: reservations at the numbers (shares are not probabilities, the scenario is a choice, sensitivities one at a time). - Chapters 8 and 9, appendix C: computations the critics asked for that are not made, what "independent" means in the project, that the pre-registration was not in a public register. - Source bank area 28 (10 entries, after the results, feeding no parameter): long leases, the largest compute deals, recent reactor costs; cited in chapters 4, 7 and 8. K09-004 gets its NOU quote. - PDFs rebuilt: report 164 pages, summary 2 pages. Every change was read by a controller and the corrections entered; keys, source entries and quotes were checked again by script. The carousel is not changed in this commit. Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
parent
4bf8f26f4b
commit
fe83f9f194
24 changed files with 544 additions and 109 deletions
|
|
@ -46,13 +46,14 @@ Beregninger jeg har gjort selv (andeler, summer) er merket «egen beregning» og
|
|||
- **Påstand:** For statlig forretningsdrift i direkte konkurranse med private aktører skal kalkulasjonsrenten tilsvare den private bedrifter står overfor. Kalkulasjonsprisene for innsatsfaktorer og produkter skal da også være de samme som for privat virksomhet.
|
||||
- **Tall:** ingen tall i rundskrivet. For kraftsektoren, se K09-025 og K09-026.
|
||||
- **Spenn:** –
|
||||
- **Kilde:** R-109/2021, pkt. 6.1.1 (s. 3) og pkt. 6.2 (s. 5); NOU 2012: 16, s. 74–75; DFØ-veilederen, s. 240.
|
||||
- **Sitat:** «For statlig forretningsdrift i direkte konkurranse med private aktører skal en kalkulasjonsrente tilsvarende den som private bedrifter står ovenfor benyttes.» (R-109 s. 5); «I de tilfeller der det offentlige produserer private goder i direkte konkurranse med privat virksomhet, benyttes samme priser som for tilsvarende privat virksomhet, både for innsatsfaktorer og for det som produseres.» (R-109 s. 3)
|
||||
- **Kilde:** R-109/2021, pkt. 6.1.1 (s. 3) og pkt. 6.2 (s. 5); NOU 2012: 16, s. 74–75; DFØ-veilederen, s. 240; NOU 2026: 4 «Kjernekraft i Norge?», kap. 26, s. 383 (PDF-s. 385), https://www.regjeringen.no/contentassets/b0434b593e544902aad54f7a29a07b84/no/pdfs/nou202620260004000dddpdfs.pdf.
|
||||
- **Sitat:** «For statlig forretningsdrift i direkte konkurranse med private aktører skal en kalkulasjonsrente tilsvarende den som private bedrifter står ovenfor benyttes.» (R-109 s. 5); «I de tilfeller der det offentlige produserer private goder i direkte konkurranse med privat virksomhet, benyttes samme priser som for tilsvarende privat virksomhet, både for innsatsfaktorer og for det som produseres.» (R-109 s. 3); «Den øverste kurven legger til grunn Finansdepartementets anbefaling for svært langsiktige, offentlige prosjekter (i strid med departementets retningslinjer for prosjekter som konkurrerer med private aktiviteter) og bruker en fallende diskonteringsrate over tid.» (NOU 2026: 4 s. 383)
|
||||
- **Kvalitet:** myndighetsdokument
|
||||
- **Usikkert:** Rundskrivet definerer ikke når et statlig datasenter eller kraftverk er «i direkte konkurranse med private aktører». DFØ (s. 181) sier at det i tvilstilfeller må vurderes hva som er den reelle alternativkostnaden.
|
||||
- **Lest:** ja
|
||||
- **Kontroll:** bekreftet (R-109 s. 5 og s. 3 ordrett; DFØ s. 181 og s. 240 funnet. NOU 2026: 4 s. 383 omtaler bruk av 4/3/2-renten på kjernekraft som «i strid med departementets retningslinjer for prosjekter som konkurrerer med private aktiviteter».)
|
||||
- **Egenkontroll (økta, 2026-11-11):** bekreftet. Setningen om statlig forretningsdrift i direkte konkurranse med private står ordrett i rundskrivet, og NOU 2026: 4 kap. 26 kaller 4/3/2-renten for kjernekraft «i strid med departementets retningslinjer for prosjekter som konkurrerer med private aktiviteter».
|
||||
- **Utfylt 2026-11-23:** etter kritikkrunden 9c ble NOU 2026: 4 med sidetall ført inn i Kilde-feltet og sitatet «i strid med …» i Sitat-feltet, ordrett fra prosjektets nedlastede kopi av NOU-en (trykt s. 383, PDF-s. 385). Sitatet sto før bare i Kontroll- og Egenkontroll-linja. Posten er ellers uendret.
|
||||
|
||||
### K09-005 Systematisk risiko er allerede bakt inn i kalkulasjonsrenten
|
||||
- **Påstand:** DFØ definerer systematisk risiko som hvor følsomme gevinstene er for svingninger i marginalnytten av forbruk, og sier at kalkulasjonsrenten i R-109/2021 allerede er korrigert for systematisk risiko. Annen usikkerhet skal ifølge veilederen fanges opp i forventningsverdiene og i usikkerhetsanalysen.
|
||||
|
|
|
|||
133
kilder/28-avtaler-og-fakta-fra-kritikkrunden.md
Normal file
133
kilder/28-avtaler-og-fakta-fra-kritikkrunden.md
Normal file
|
|
@ -0,0 +1,133 @@
|
|||
# 28 — Avtaler og fakta fra kritikkrunden
|
||||
|
||||
Området samler avtaler og kostnadstall som kritikerne viste til i lesingen av rapporten 23. november 2026: lange leieavtaler for bygg og kraft til KI-datasentre, de største avtalene om regnekraft, og kostnaden for nyere reaktorprosjekter. Området er laget etter parameterfrysen og etter at resultatene forelå. Det mater ingen parameter: ingen verdi i parameterfila er endret, og ingen post her bærer en parameter. Postene brukes bare i rapportteksten, der det står hva avtalene og kostnadstallene viser og ikke viser.
|
||||
|
||||
Området bygger videre på banken og gjentar ikke det som alt står der: IRENs femårskontrakt til om lag 22 mill. USD per MW IT og at kontraktsprisene steg i 2026 (K13-005), IRENs avtale med Microsoft (K08-033), Applied Digitals leieavtaler på 15 år (K13-K01), prisfallet og stigningen i leieprisene for GPU-er (K08-030, K08-031, K08-K04, K13-012), Darlington (K03-032, K03-033, K21-078), IEAs kostnad for den første små reaktoren og leverandørenes mål (K27-027), og Tydal som sak i Statnetts register (K22-019, K22-021).
|
||||
|
||||
Primærtekstene ble hentet av økta 23. november 2026 som tekst og lest som tekst; ingenting fra dem ble kjørt. Fire av tekstene er speil av pressemeldinger, ikke selskapets eller børsens egen side: Bitdeer og Hut 8 hos finviz, Volta hos FinancialContent og OPG hos Cantech Letter. Det står i «Kvalitet» i hver post. Hvert sitat er søkt opp ordrett i primærteksten. Ingen valuta eller prisår er regnet om. Tall merket «utregning gjort her» er enkle regnestykker som ikke står i kilden.
|
||||
|
||||
## Påstander
|
||||
|
||||
### A. Lange leieavtaler for bygg og kraft
|
||||
|
||||
### K28-001 Tydal: leieavtale for bygg og kraft til et KI-datasenter, 121 MW IT i 16 år for om lag 4,7 mrd. USD; leietakeren kan si opp uten gebyr etter ti år
|
||||
- **Påstand:** Bitdeer meldte 4.8.2026 at datterselskapet Tydal Data Center AS har inngått en leie- og tjenesteavtale på 16 år med Volta Tydal AS, et datterselskap av Volta, om 121 MW IT, med anslagsvis 133 MW brutto, på anlegget i Tydal. Avtalen gir om lag 4,7 mrd. USD i kontraktsfestet inntekt over 16 år, i snitt om lag 202 USD per kW og måned, og leietakeren betaler strømmen i tillegg. Selskapet oppgir selv om lag 2,4 mill. USD per MW IT og år i snitt over 16 år. Leien stiger 3 % i året. Leietakeren kan si opp uten gebyr etter ti år og har opsjon på åtte år til (om lag 8,0 mrd. USD over 24 år). Leietakerens forpliktelser skal etter planen støttes av remburser på om lag 1,3 mrd. USD, og utleieren kan si opp hvis leietakeren ikke når visse milepæler for dem. Sluttkunden er et ikke navngitt KI-laboratorium. Første halvdel skal starte 31.12.2026, andre halvdel 31.3.2027.
|
||||
- **Tall:** 121 MW IT (om lag 133 MW brutto); 16 år; om lag 4,7 mrd. USD; om lag 202 USD per kW og måned; 2,4 mill. USD per MW IT og år (selskapets tall); 3 % årlig økning; oppsigelsesrett uten gebyr etter 10 år; opsjon på 8 år, om lag 8,0 mrd. USD over 24 år; remburser om lag 1,3 mrd. USD. Utregning gjort her: 4 700 / 16 / 121 = 2,43 og 202 × 12 / 1 000 = 2,42 mill. USD per MW IT og år, nominelt, i snitt over løpetiden. Nominelle USD.
|
||||
- **Spenn:** ett datapunkt.
|
||||
- **Kilde:** Bitdeer Technologies Group, «Bitdeer Announces $4.7 Billion, 16-Year AI/HPC Data Center Lease for Tydal, Norway Campus», pressemelding (GlobeNewswire), Singapore 4.8.2026, gjengitt på https://finviz.com/news/376679/bitdeer-announces-47-billion-16-year-aihpc-data-center-lease-for-tydal-norway-campus.
|
||||
- **Sitat:** «SINGAPORE, Aug. 04, 2026 (GLOBE NEWSWIRE)» / «Under the agreement, TDC will deliver 121 IT megawatts (MW), supported by an estimated 133 gross MW, at its Tydal campus in Norway. The agreement represents approximately $4.7 billion in contracted revenue over the initial 16-year base term.» / «The lease is structured as a modified gross arrangement with an average payment of approximately $202/kW/month over the first 16 years, with electricity costs reimbursed by the tenant on a pass-through basis.» / «Total contract value: Approximately $4.7 billion over the initial 16-year base term; Tenant has a no fee termination right at 10 years» / «Revenue per IT MW: Expected average annual revenue of $2.4 million per IT MW over 16 years» / «Escalators: 3% annual increases on both lease and services agreement» / «An 8-year renewal option increases the potential total contract value to approximately $8.0 billion over 24 years.» / «Volta’s obligations are anticipated to be supported by a credit backstop in the form of Letters of Credit arranged by affiliates of J.P. Morgan and another top-tier global financial institution, totaling approximately $1.3 billion and subject to customary conditions.» / «Bitdeer has the right to terminate the agreement if Volta fails to meet certain milestones relating to the credit backstop.» / «Volta’s customer at the Tydal site will be a leading AI lab, with Dell Technologies as the technology provider.» / «Two equal-sized phases across 4 data halls: Phase 1 target commencement December 31, 2026; Phase 2 target commencement March 31, 2027» / «Tenant is a subsidiary of Volta» / «These figures reflect contracted payment streams and do not represent GAAP revenue.»
|
||||
- **Kvalitet:** pressemelding (utleierens egen melding); lest i et speil hos finviz, ikke hos GlobeNewswire eller som 6-K hos SEC.
|
||||
- **Usikkert:** Beløpene forutsetter at avtalen oppfylles, og er ikke regnskapsført inntekt. Leien gjelder plass, kraftanlegg og tjenester i anlegget; hvem som eier GPU-ene, og hva leietakeren tar betalt av sluttkunden, står ikke i meldingen. Rembursene er ikke på plass («anticipated»). Løpetiden for leietakerens avtale med sluttkunden står ikke her (se K28-002). Anlegget hadde nett og konsesjon fra før (K22-019, K22-021).
|
||||
- **Lest:** 2026-11-23 (tekst av pressemeldingen hentet av økta)
|
||||
- **Kontroll:** bekreftet 2026-11-23 (sitatet funnet ordrett i primærteksten av økta)
|
||||
|
||||
### K28-002 Norge: et partnerskap på 10 mrd. USD med et KI-laboratorium om et KI-datasenter på 133 MW, sammen med utleieren i Tydal; løpetid ikke oppgitt
|
||||
- **Påstand:** Volta meldte 4.8.2026 at selskapet har et strategisk partnerskap på 10 mrd. USD med et ikke navngitt KI-laboratorium om å utvikle et KI-datasenter i Europa sammen med Bitdeer. Prosjektet ligger i Norge og skal ha 133 MW. Meldingen oppgir ikke løpetid eller hva beløpet omfatter.
|
||||
- **Tall:** 10 mrd. USD; 133 MW. Løpetid: ikke oppgitt.
|
||||
- **Spenn:** ett datapunkt.
|
||||
- **Kilde:** Volta, «Volta Emerges From Stealth With $10 Billion AI Lab Partnership and $5 Billion AI Infrastructure Program», pressemelding (Business Wire) 4.8.2026, gjengitt på https://www.financialcontent.com/article/bizwire-2026-8-4-volta-emerges-from-stealth-with-10-billion-ai-lab-partnership-and-5-billion-ai-infrastructure-program.
|
||||
- **Sitat:** «Published at August 4th 2026, 8:00 AM EDT via Business Wire» / «Volta's launch is anchored by a landmark $10 billion strategic partnership with an AI Lab to develop an AI factory in Europe alongside Bitdeer. Located in Norway, the project will comprise a 133 MW deployment powered by NVIDIA Vera Rubin systems.»
|
||||
- **Kvalitet:** pressemelding; lest i et speil hos FinancialContent, som selv skriver at den ikke garanterer innholdet.
|
||||
- **Usikkert:** Meldingen nevner ikke Tydal. At det er samme prosjekt som i K28-001, bygger på at begge meldingene kom samme dag og nevner Norge, 133 MW, utleieren og et KI-laboratorium (tolkning). Om 133 MW er brutto eller IT, står ikke; K28-001 har 121 MW IT og 133 MW brutto. Uten løpetid gir beløpet ingen pris per MW og år. Søkt på «term» og «years» i meldingen: løpetiden står ikke der.
|
||||
- **Lest:** 2026-11-23 (tekst av pressemeldingen hentet av økta)
|
||||
- **Kontroll:** bekreftet 2026-11-23 (sitatet funnet ordrett i primærteksten av økta)
|
||||
|
||||
### K28-003 Leieavtale for bygg og kraft i USA: 352 MW IT i 15 år for 9,8 mrd. USD, «triple net»
|
||||
- **Påstand:** Hut 8 meldte 6.5.2026 en leieavtale på 15 år for 352 MW IT på campus Beacon Point i Texas, til 9,8 mrd. USD i grunnperioden, med 3,0 % årlig økning i grunnleien. Leien er en «triple net»-leie. Leietakeren er et ikke navngitt selskap med høy kredittverdighet, som skal sette inn egen regnekraft. Første datahall ventes levert i 3. kvartal 2027. Med alle fornyelsesopsjoner kan verdien bli inntil 25,1 mrd. USD.
|
||||
- **Tall:** 352 MW IT (om lag 500 MW fra nettet); 15 år; 9,8 mrd. USD; 3,0 % årlig økning; inntil 25,1 mrd. USD med alle opsjoner. Utregning gjort her: 9 800 / 15 / 352 = 1,86 mill. USD per MW IT og år i snitt over løpetiden, nominelt.
|
||||
- **Spenn:** ett datapunkt.
|
||||
- **Kilde:** Hut 8 Corp., «Hut 8 Commercializes First Phase of 1 GW Beacon Point AI Data Center Campus with 15-Year, 352 MW IT Lease with Base-Term Contract Value of $9.8 Billion», pressemelding (PR Newswire), Miami 6.5.2026, selskapets side https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw; hele teksten gjengitt på https://finviz.com/news/351129/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-98-billion.
|
||||
- **Sitat:** «MIAMI, May 6, 2026 /PRNewswire/» / «through a 15-year, $9.8 billion lease» / «for 352 megawatts (MW) of IT capacity» / «The tenant, a high-investment-grade company, will deploy dedicated compute infrastructure at the campus to support AI training and inference workloads at hyperscale.» / «Lease Structure: Triple net (NNN) lease.» / «Base-Term Contract Value: Total contract value of $9.8 billion over a 15-year base lease term, inclusive of a 3.0% annual base rent escalator.» / «Delivery Timeline: Initial data hall delivery expected in Q3 2027.» / «The lease for 352 MW of IT capacity, requiring approximately 500 MW of utility capacity» (speilet hos finviz) / «Hut 8 Commercializes First Phase of 1 GW Beacon Point AI Data Center Campus with 15-Year, 352 MW IT Lease with Base-Term Contract Value of $9.8 Billion» / «Triple-net lease with high-investment-grade tenant valued at up to $25.1 billion if all renewal options are exercised» (selskapets side)
|
||||
- **Kvalitet:** pressemelding (utleierens egen melding); selskapets side har tittel og hovedpunkter, hele teksten er lest i et speil hos finviz.
|
||||
- **Usikkert:** Meldingen forklarer ikke hva «triple net» omfatter. Leietakeren er ikke navngitt. Beløpet er en sum over løpetiden, ikke nåverdi, og forutsetter at avtalen oppfylles.
|
||||
- **Lest:** 2026-11-23 (tekst av selskapets side og av speilet hentet av økta)
|
||||
- **Kontroll:** bekreftet 2026-11-23 (sitatet funnet ordrett i primærteksten av økta)
|
||||
|
||||
### B. De største avtalene om regnekraft
|
||||
|
||||
### K28-004 Forpliktelse til regnekraft over ti år: mer enn 100 mrd. USD for inntil 5 GW ny kapasitet; ingen pris per MW
|
||||
- **Påstand:** Anthropic meldte 20.4.2026 en ny avtale med Amazon. Anthropic forplikter seg til mer enn 100 mrd. USD over de neste ti årene til AWS-teknologi og sikrer seg inntil 5 GW ny kapasitet til å trene og kjøre sine modeller. Nær 1 GW skal være i drift innen utgangen av 2026. Samtidig investerer Amazon 5 mrd. USD i Anthropic, med inntil 20 mrd. USD til senere.
|
||||
- **Tall:** mer enn 100 mrd. USD over 10 år; inntil 5 GW; nær 1 GW innen utgangen av 2026; Amazon investerer 5 mrd. USD nå og inntil 20 mrd. USD senere.
|
||||
- **Spenn:** beløpet er en nedre grense («more than»), effekten en øvre («up to»).
|
||||
- **Kilde:** Anthropic, «Anthropic and Amazon expand collaboration for up to 5 gigawatts of new compute», 20.4.2026, https://www.anthropic.com/news/anthropic-amazon-compute.
|
||||
- **Sitat:** «Published Apr 20, 2026» / «We are committing more than $100 billion over the next ten years to AWS technologies, securing up to 5GW of new capacity to train and run Claude.» / «nearly 1GW total of Trainium2 and Trainium3 capacity coming online by the end of 2026» / «Amazon is investing $5 billion in Anthropic today, with up to an additional $20 billion in the future.»
|
||||
- **Kvalitet:** pressemelding (kjøperens egen melding)
|
||||
- **Usikkert:** Meldingen oppgir ikke hvor fort kapasiteten kommer etter 2026, hvordan beløpet fordeler seg på år, eller hva det omfatter utover «AWS technologies». Pris per MW og år kan derfor ikke regnes ut. Avtalen er inngått samtidig som selgeren investerer i kjøperen.
|
||||
- **Lest:** 2026-11-23 (tekst av meldingen hentet av økta)
|
||||
- **Kontroll:** bekreftet 2026-11-23 (sitatet funnet ordrett i primærteksten av økta)
|
||||
|
||||
### K28-005 Leie av regnekraft fra to klynger i USA: 1,25 mrd. USD i måneden til mai 2029, oppsigelig med 90 dagers varsel; effekten avtalen gjelder, er ikke oppgitt
|
||||
- **Påstand:** SpaceX skriver i registreringsdokumentet (Form S-1, levert til SEC 20.5.2026) at selskapet i mai 2026 inngikk avtaler med Anthropic om tilgang til regnekraft i klyngene COLOSSUS og COLOSSUS II. Kunden betaler 1,25 mrd. USD i måneden til mai 2029, med redusert pris mens kapasiteten trappes opp i mai og juni 2026. Begge parter kan si opp med 90 dagers varsel. Selgeren kaller det å tjene penger på ubrukt kapasitet som kan tas tilbake til egne formål. De to klyngene har til sammen om lag 1,0 GW, men dokumentet sier ikke hvor mye av det avtalene gjelder.
|
||||
- **Tall:** 1,25 mrd. USD per måned til mai 2029 (utregning gjort her: 15 mrd. USD i året); 90 dagers oppsigelse; klyngene om lag 1,0 GW til sammen.
|
||||
- **Spenn:** ett datapunkt.
|
||||
- **Kilde:** Space Exploration Technologies Corp., Form S-1 (registreringsdokument), levert til SEC 20.5.2026, https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm.
|
||||
- **Sitat:** «As filed with the U.S. Securities and Exchange Commission on May 20, 2026» / «in May 2026, we entered into Cloud Services Agreements with Anthropic PBC (“Anthropic”), an AI research and development public benefit corporation, with respect to access to compute capacity across COLOSSUS and COLOSSUS II. Pursuant to these agreements, the customer has agreed to pay us $1.25 billion per month through May 2029, with capacity ramping in May and June 2026 at a reduced fee. The agreements may be terminated by either party upon 90 days’ notice.» / «This structure allows us to monetize unused compute capacity in our infrastructure, while still permitting reallocation of the capacity for our own internal initiatives if needed in the future.» / «COLOSSUS and COLOSSUS II, collectively provide approximately 1.0 gigawatt of compute power»
|
||||
- **Kvalitet:** børsdokument (registreringsdokument til SEC; selgerens egen beskrivelse)
|
||||
- **Usikkert:** Kunden har avtalt å betale til mai 2029, men begge kan si opp med 90 dagers varsel. Hvor mange MW eller GPU-er avtalene gjelder, står ikke i sitatet; 1,0 GW gjelder klyngene samlet. Epoch gjengir avtalen som «up to $15 billion per year» (K08-K04).
|
||||
- **Lest:** 2026-11-23 (tekst av registreringsdokumentet hentet av økta)
|
||||
- **Kontroll:** bekreftet 2026-11-23 (sitatet funnet ordrett i primærteksten av økta)
|
||||
|
||||
### K28-006 Leie av regnekraft fra samme selger: 920 mill. USD i måneden fra oktober 2026 til juni 2029 for om lag 110 000 GPU-er, oppsigelig med 90 dagers varsel etter 2026
|
||||
- **Påstand:** I et fritt skriftlig prospekt (Free Writing Prospectus) til SEC skriver SpaceX at selskapet 5.6.2026 inngikk en avtale med Google om regnekraft med om lag 110 000 NVIDIA-GPU-er. Kunden betaler 920 mill. USD i måneden fra oktober 2026 til juni 2029, med redusert pris mens kapasiteten trappes opp. Etter 31.12.2026 kan begge parter si opp med 90 dagers varsel.
|
||||
- **Tall:** 920 mill. USD per måned, oktober 2026 til juni 2029; om lag 110 000 GPU-er; 90 dagers oppsigelse etter 31.12.2026.
|
||||
- **Spenn:** ett datapunkt.
|
||||
- **Kilde:** Space Exploration Technologies Corp., Free Writing Prospectus (Rule 433, registreringsnummer 333-296070), https://www.sec.gov/Archives/edgar/data/1181412/000162828026041150/spacexagreementfwp.htm.
|
||||
- **Sitat:** «Filed Pursuant to Rule 433 Registration File No. 333-296070 Free Writing Prospectus» / «On June 5, 2026, we entered into a Cloud Service Agreement with Google LLC ("Google") with respect to access to compute capacity. The compute capacity provided includes approximately 110,000 NVIDIA GPUs, CPUs, memory, and other related components. Pursuant to the agreement, the customer has agreed to pay us $920 million per month from October 2026 through June 2029, with capacity ramping up through September at a reduced fee.» / «After December 31, 2026, the agreement may be terminated by either party upon 90 days' notice.»
|
||||
- **Kvalitet:** børsdokument (fritt skriftlig prospekt til SEC; selgerens egen beskrivelse)
|
||||
- **Usikkert:** Datoen dokumentet ble levert, står ikke i teksten. Effekten i MW er ikke oppgitt, bare antall GPU-er.
|
||||
- **Lest:** 2026-11-23 (tekst av prospektet hentet av økta)
|
||||
- **Kontroll:** bekreftet 2026-11-23 (sitatet funnet ordrett i primærteksten av økta)
|
||||
|
||||
### K28-007 Skytjenester: én avtale ventes å gi mer enn 30 mrd. USD i årlig inntekt fra regnskapsåret 2028; kunde, effekt og løpetid ikke oppgitt
|
||||
- **Påstand:** Oracle meldte i en 8-K 30.6.2025 at selskapet har inngått flere store avtaler om skytjenester, blant dem én som ventes å gi mer enn 30 mrd. USD i årlig inntekt fra regnskapsåret 2028 (FY28). Selskapet skriver at beløpet som til slutt inntektsføres, kan avvike.
|
||||
- **Tall:** mer enn 30 mrd. USD per år fra FY28.
|
||||
- **Spenn:** nedre grense («more than»).
|
||||
- **Kilde:** Oracle Corporation, Form 8-K, «Date of Report … June 30, 2025», Item 7.01, https://www.sec.gov/Archives/edgar/data/1341439/000119312525152035/d136779d8k.htm.
|
||||
- **Sitat:** «Date of Report (Date of earliest event reported): June 30, 2025» / «we signed multiple large cloud services agreements including one that is expected to contribute more than $30 billion in annual revenue starting in FY28.» / «Amounts ultimately recognized from the contract noted above may vary»
|
||||
- **Kvalitet:** børsdokument (8-K til SEC; selgerens egen forventning)
|
||||
- **Usikkert:** Kunde, effekt, løpetid og hva tjenestene omfatter, står ikke i meldingen. Pris per MW kan ikke regnes ut.
|
||||
- **Lest:** 2026-11-23 (tekst av meldingen hentet av økta)
|
||||
- **Kontroll:** bekreftet 2026-11-23 (sitatet funnet ordrett i primærteksten av økta)
|
||||
|
||||
### C. Kostnaden for kjernekraft
|
||||
|
||||
### K28-008 IEA 2025: kostnaden for nyere reaktorprosjekter i Vesten, fra 7 200 til nesten 16 000 USD/kW (2023-dollar, uten renter); 2 700 i Korea
|
||||
- **Påstand:** IEA viser første og siste kostnadsanslag for utvalgte nyere prosjekter. Vogtle 3 og 4 i USA steg fra om lag 5 600 til 14 700 USD/kW. Olkiluoto 3 i Finland steg fra om lag 3 300 til 7 200. Budsjettet for Hinkley Point C i Storbritannia, som er under bygging, har steget fra om lag 8 700 til nesten 16 000. Flamanville 3 i Frankrike steg fra 3 200 til 11 000 da den kom i drift i 2024. Saeul 1 og 2 i Korea endte på 2 700. Alle tall er i 2023-dollar, uten renter, og per kW brutto installert effekt. Alle fire vestlige prosjekter ble forsinket: Vogtle tok om lag ti år, Olkiluoto 3 skulle vært i drift i 2009 og kom på nettet i 2022, Hinkley Point C er skjøvet fra 2025 til 2029–2031, og Flamanville 3 ble tolv år forsinket. Saeul 1 og 2 het tidligere Shin Kori 3 og 4.
|
||||
- **Tall:** USD/kW (2023): Vogtle 3–4 om lag 5 600 → 14 700; Olkiluoto 3 om lag 3 300 → 7 200; Hinkley Point C om lag 8 700 → nesten 16 000 (budsjett); Flamanville 3 3 200 → 11 000; Saeul 1–2 2 700 (om lag 30 % over første anslag).
|
||||
- **Spenn:** 2 700 (Saeul 1–2) til nesten 16 000 (Hinkley Point C) USD/kW.
|
||||
- **Kilde:** IEA, «The Path to a New Era for Nuclear Energy», 2025, https://iea.blob.core.windows.net/assets/b6a6fc8c-c62e-411d-a15c-bf211ccc06f3/ThePathtoaNewEraforNuclearEnergy.pdf, kap. 1, trykt s. 23–24, figur 1.7 med note (s. 24).
|
||||
- **Sitat:** «In the United States, the Vogtle Units 3 and 4» … «The initial capital cost estimate of about USD (2023) 5 600 per kilowatt (kW) (gross capacity) rose to USD (2023) 14 700/kW with the timeline extending significantly beyond initial projections to around ten years.» / «The Olkiluoto 3 project in Finland was initially planned to be operational by 2009, but was connected to the grid in 2022.» … «3 300/kW, but costs escalated to USD (2023, MER) 7 200/kW due to design modifications, regulatory hurdles and supply chain disruptions» / «In the United Kingdom, the Hinkley Point C project has struggled with escalating costs and timelines.» «Initially estimated at about USD (2023, MER) 8 700/kW, the budget has risen to almost USD (2023, MER) 16 000/kW» … «with the completion date being pushed back several times from 2025 initially to 2029-2031» / «The Flamanville 3 project in France experienced a significant cost escalation, with initial estimates of USD (2023, MER) 3 200/kW rising to USD (2023, MER) 11 000/kW by the time it became operational in 2024, following a delay of 12 years.» / «construction costs rising by about 30% compared with initial estimates, with cost per capacity reaching USD (2023, MER) 2 700/kW» (Saeul 1 og 2) / «The reactors Saeul 1 and 2 were previously named Shin Kori 3 and 4.» / «The cost estimates do not include interest. Gross installed capacity is considered.» / «The construction of Hinkley Point C is ongoing.» / «The estimates provided here are in 2023 currency and are based on the initial and current cost estimates provided by EDF» (note til Hinkley Point C og Flamanville 3)
|
||||
- **Kvalitet:** utredning (mellomstatlig organisasjon)
|
||||
- **Usikkert:** Hinkley Point C er budsjettet for et prosjekt under bygging, ikke en sluttkostnad. Tallene for Hinkley Point C og Flamanville 3 er regnet om av IEA fra utbyggerens anslag i 2015-valuta. NEAs tabell over de samme prosjektene (K27-003) har andre tall, på et annet grunnlag. At tallene er uten renter, står i noten til figur 1.7, som teksten viser til for de samme prosjektene; figuren selv er ikke lest. Sidetallene er lest av sidemerkene i teksten, på samme måte som i K27-027 og K27-101.
|
||||
- **Lest:** 2026-11-23 (tekst av rapporten hentet av økta)
|
||||
- **Kontroll:** bekreftet 2026-11-23 (sitatet funnet ordrett i primærteksten av økta)
|
||||
|
||||
### K28-009 IEA 2025: nye store reaktorer i 2040 til 60–100 USD/MWh i USA og 75–110 i EU i scenarioet med varslede mål, konkurransedyktig med annen regulerbar kraft med lave utslipp
|
||||
- **Påstand:** I IEAs scenario med varslede mål (APS) koster kraft fra nye store reaktorer i 2040 60–100 USD/MWh i USA og 75–110 USD/MWh i EU, nivåisert. IEA skriver at kjernekraften da er konkurransedyktig med annen regulerbar kraft med lave utslipp, også med en kapitalkostnad på 8 %.
|
||||
- **Tall:** 60–100 USD/MWh (USA), 75–110 USD/MWh (EU), nye store reaktorer, 2040, APS; figuren er i 2023-dollar.
|
||||
- **Spenn:** 60–110 USD/MWh.
|
||||
- **Kilde:** IEA, «The Path to a New Era for Nuclear Energy», 2025 (som K28-008), kap. 2, trykt s. 52–54, figur 2.7.
|
||||
- **Sitat:** «For new large-scale nuclear reactors, the projected LCOE in 2040 in the APS ranges widely between regions, reflecting differences in both construction costs and the weighted average cost of capital (WACC).» / «In the United States and the European Union, higher construction costs result in higher LCOEs of USD 60/MWh to USD 100/MWh in the United States and USD 75/MWh to USD 110/MWh in Europe.» / «In general, the projected LCOEs for nuclear energy in 2040 in the APS are competitive with other low-emissions dispatchable generating options, including hydropower (in China) and bioenergy (in the United States and the European Union). Considering multiple levels of financing costs, we find this is true even in the case where financing costs are relatively high (e.g. 8% WACC) for nuclear.» / «USD per MWh (2023, MER)» (aksen i figur 2.7)
|
||||
- **Kvalitet:** utredning (mellomstatlig organisasjon)
|
||||
- **Usikkert:** Tallene er en framskriving i ett scenario, ikke en observert kostnad. Byggekostnaden bak dem kan ikke leses sikkert av figuren i teksten. Tallene er per MWh og kan ikke uten videre holdes mot kostnader per kW.
|
||||
- **Lest:** 2026-11-23 (tekst av rapporten hentet av økta)
|
||||
- **Kontroll:** bekreftet 2026-11-23 (sitatet funnet ordrett i primærteksten av økta)
|
||||
|
||||
### K28-010 Darlington (Canada), 10.11.2026: eieren kaller prosjektet den første lille modulære reaktoren i et G7-land; første enhet går over tid og budsjett (viser til K03-033 og K21-078)
|
||||
- **Påstand:** OPGs melding for 3. kvartal 2026, datert 10.11.2026, sier at selskapet bygger den første små modulære reaktoren (SMR) i et G7-land ved Darlington, og at enhet 1 ikke lenger ventes i kommersiell drift i oktober 2030 eller ferdig innenfor 7,7 mrd. C$, felles systemer medregnet. Ny vurdering av kostnad og tid ventes i hovedsak ferdig innen midten av 2027. Posten bekrefter K03-033 og K21-078 fra en annen gjengivelse av samme melding og legger til datoen og eierens beskrivelse av prosjektet som det første i G7.
|
||||
- **Tall:** tidligere mål oktober 2030 og 7,7 mrd. C$ (enhet 1 og felles systemer); ny kostnad ikke oppgitt; vurderingen ventes innen midten av 2027. Kostnaden for hele prosjektet med fire enheter står i K03-032.
|
||||
- **Spenn:** ukjent.
|
||||
- **Kilde:** Ontario Power Generation, «OPG Reports 2026 Third Quarter Financial Results», pressemelding (CNW), Oshawa 10.11.2026, gjengitt på https://www.cantechletter.com/newswires/opg-reports-2026-third-quarter-financial-results/.
|
||||
- **Sitat:** «OSHAWA, ON, Nov. 10, 2026 /CNW/» / «OPG is continuing construction of the G7’s first small modular reactor (SMR) under the Darlington New Nuclear Project (DNNP).» / «DNNP Unit 1 is no longer expected to achieve the previously disclosed commercial operation date target of October 2030 or be completed within the previously disclosed estimated cost of $7.7 billion, inclusive of required systems and services that would be common to all SMRs planned as part of the project.» / «The assessment of the project cost and schedule is currently expected to be substantially completed by mid-2027.»
|
||||
- **Kvalitet:** pressemelding (statseid selskap); lest i et speil hos Cantech Letter.
|
||||
- **Usikkert:** Overskridelsens størrelse er ukjent. Hvordan kostnaden per kW blir for første enhet, står ikke.
|
||||
- **Lest:** 2026-11-23 (tekst av pressemeldingen hentet av økta)
|
||||
- **Kontroll:** bekreftet 2026-11-23 (sitatet funnet ordrett i primærteksten av økta)
|
||||
|
||||
## Ikke funnet
|
||||
|
||||
- Løpetiden for partnerskapet på 10 mrd. USD (K28-002) står ikke i meldingen. Utleierens melding er ikke lest som 6-K hos SEC.
|
||||
- Hva «triple net» omfatter i K28-003, står ikke i meldingen.
|
||||
- Datoen prospektet i K28-006 ble levert til SEC, står ikke i teksten.
|
||||
- IRENs femårskontrakt til om lag 22 mill. USD per MW (resultatmelding 5.11.2026) står alt i K13-005 og er ikke tatt inn på nytt.
|
||||
- Ingen av de største avtalene om regnekraft (K28-002, K28-004 til K28-007) oppgir både beløp per år, effekt i MW og løpetid, så ingen av dem gir en pris per MW og år.
|
||||
|
|
@ -1,6 +1,6 @@
|
|||
# Kildebanken
|
||||
|
||||
Her står det modellen bygger på: 1 226 poster i 27 områder, hver med påstand, tall, kilde, ordrett sitat og en
|
||||
Her står det modellen bygger på: 1 236 poster i 28 områder, hver med påstand, tall, kilde, ordrett sitat og en
|
||||
kontroll mot primærkilden. En parameter i modellen skal kunne spores til en bekreftet post her
|
||||
(`modell/parametere.json` viser til postene).
|
||||
|
||||
|
|
@ -36,6 +36,7 @@ kontroll mot primærkilden. En parameter i modellen skal kunne spores til en bek
|
|||
| `26-fradrag-og-kjolevann.md` | Utslippene regnekrafta ellers ville hatt, og kjølevann |
|
||||
| `27a-seriebygging-og-reaktorstorrelse.md` | Hva fagmiljøene sier: seriebygging og læring, serie over landegrenser i Norden, store mot små reaktorer |
|
||||
| `27b-tidslinje-kraftavtaler-og-statens-rolle.md` | Hva fagmiljøene sier: tidslinjen for ny kjernekraft, lange kraftavtaler, statens rolle i finansiering og risiko, nordisk forbruk |
|
||||
| `28-avtaler-og-fakta-fra-kritikkrunden.md` | Avtaler og kostnadstall kritikerne viste til 23. november 2026: lange leieavtaler for bygg og kraft, de største avtalene om regnekraft, kostnaden for nyere reaktorprosjekter (laget etter resultatene; mater ingen parameter) |
|
||||
| `00-gjennomgang.md` | Hull, motsigelser og skjevheter på tvers av områdene 01–12 |
|
||||
|
||||
## Slik er banken laget
|
||||
|
|
@ -70,6 +71,12 @@ verdi i parameterfila er endret av runden, og ingen post i område 27 bærer en
|
|||
forsker og én uavhengig kontrollør per fil, og kontrollørene prøvde forskernes «ikke funnet»-funn (to av dem
|
||||
var feil: høringssvarene fra NVE og Statnett fantes).
|
||||
|
||||
**Kritikkrunden (2026-11-23), område 28.** Avtaler og kostnadstall som kritikerne viste til da rapporten ble
|
||||
lest 23. november 2026. Området er laget etter at resultatene forelå. Ingen verdi i parameterfila er endret, og
|
||||
ingen post i område 28 bærer en parameter; postene brukes bare i rapportteksten. Primærtekstene ble hentet av
|
||||
økta samme dag, og hvert sitat er søkt opp ordrett i dem. Fire av tekstene er speil av pressemeldinger; det står
|
||||
i postene.
|
||||
|
||||
Prosjektets egen kontroll av bærende tall står i posten som «Egenkontroll».
|
||||
|
||||
| | Første runde | Andre runde | Tredje runde | Fjerde runde | I alt |
|
||||
|
|
@ -83,7 +90,9 @@ Prosjektets egen kontroll av bærende tall står i posten som «Egenkontroll».
|
|||
|
||||
To av de tre ubekreftede postene fra første runde er bekreftet i andre runde (K11-022 og K11-046). K11-044 og
|
||||
K20-K05 er fortsatt ikke bekreftet og bærer ingen parameter. Tallene for andre runde er kontrollørenes egne
|
||||
tellinger; de summerer til 283 poster, mens filene har 286. Tallene for tredje og fjerde runde er talt i filene. I fjerde runde
|
||||
tellinger; de summerer til 283 poster, mens filene har 286. Tallene for tredje og fjerde runde er talt i filene. Område 28 (10 poster, 23. november
|
||||
2026) er ikke med i tabellen; hvert sitat der er søkt opp ordrett i primærteksten av den som skrev posten, av en
|
||||
kontrollør og av økta samme dag. I fjerde runde
|
||||
står ett tall som «Ikke verifisert» inne i en post (2 700 USD/kW i K27-038): primærkilden lot seg ikke lese.
|
||||
|
||||
Mange rettelser gjelder sidetall, utgave og lenker. Andre gjelder innhold: et tall tillagt feil størrelse, en
|
||||
|
|
@ -97,9 +106,9 @@ med `K` i løpenummeret (for eksempel `K03-K01`) er lagt til av kontrolløren.
|
|||
|
||||
## Forbehold
|
||||
|
||||
- Kontrollen er gjort av språkmodeller (Claude). Den fanger mye, men ikke alt. 123 av 1 226 poster er kontrollert
|
||||
- Kontrollen er gjort av språkmodeller (Claude). Den fanger mye, men ikke alt. 123 av 1 236 poster er kontrollert
|
||||
en tredje gang av prosjektet selv. Les sitatet og følg lenken før du bygger på et tall.
|
||||
- Banken er et øyeblikksbilde fra 11. til 14. november 2026. Priser på regnekraft og tokens, eksportregler og norsk
|
||||
- Banken er et øyeblikksbilde fra 11. til 14. november 2026; område 28 er fra 23. november 2026. Priser på regnekraft og tokens, eksportregler og norsk
|
||||
politikk endrer seg raskt. Elavgift, Norgespris og karbonprisbaner for 2027 vedtas i desember 2026.
|
||||
- Tallene i postene har ulike prisår og valutaer. Omregningen til 2025-kroner er gjort i
|
||||
`modell/parametere.json`, med seriene i område 18.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue