Commit graph

1 commit

Author SHA1 Message Date
b58e79ee82
feat(nivaaisert): take solution T and the loss of demand through the levelised cost, ownership and scale
The power cost per module (S11): a renewable module with its own portfolio and grid
connection, as a facility in C; the nuclear modules of T-K on the programme's units, as the
facilities in B, with only the nuclear modules that use power in the denominator. Tariff,
building, IT hardware and residual value per module with P_m. The units' cash flow is shared
among the nuclear modules operated that year, never on the renewable modules.

The factor of S51 stands per vintage in S19, S27 and S42 and in the disconnection arm a
business pays; S31 gets it through the revenue and F_a of the cash flow. Without a loss, and
for A, B, B', C and R, every figure of chapters 7 to 9 is unchanged to the last digit (282
made-up paths, 151 525 lines of figures compared byte for byte).

The technologies of a facility are now kept in the plants' own order. As a set of names their
order differed from run to run, and with it the last digit of every sum over them in C.

The refusal of T and of a loss of demand (krev_uten_tillegget) is removed. Run on made-up
numbers only; no result for the hypothesis has been computed.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 09:25:27 +01:00