Third round of source work, before anything is computed: what can be in
operation within a few years on the existing grid (22), power sources with
short lead time (23), stepwise build-up and switching power solution over
time (24), AI compute on users' own machines (25), and the two quantities
the model lacked parameters for: avoided emissions and cooling water (26).
188 entries, one researcher and one independent verifier per area:
114 confirmed, 52 corrected, 22 added by the verifiers, none unconfirmed.
22 load-bearing entries were checked a third time against the primary
source and carry an "Egenkontroll" line.
The model, the frozen parameters and the pre-registration are unchanged.