feat(utbygging): build out solution T in modules and add S48-S54
utbyggingsplan_trinnvis follows chapter 17.1: the grid balance of the
first stage, the payment condition for a module's power plants, S49,
and in T-K the two stocks of chips and the queue for replacements.
tidslinje gives MW IT in operation per type of power (S50). S48-S54
are pure functions in ligninger.py, and Inndata carries the new
quantities, the scenarios for the loss of demand and the paths of
u_alt. lag_plan returns a Trinnvisplan for T-F and T-K; regn_program
refuses T until it is taken through the cash flow.

Tested on made-up numbers only (59 new tests, hand-computed build-outs).
Nothing is computed for the hypothesis.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 23:55:57 +01:00
fb13b8fd75
feat(modell): count chips from the first possible operating year
The project owner answered the three questions from part 5b on 2026-11-12
("Ja til dine anbefalinger"), before any result is computed:

- chips are a stock from the solution's first possible operating year, not
  from the decision year (clarification 25 rewritten; the old reading stays
  as a switch that is not part of the verdicts)
- renewable power in C enters operation the same year as the facility
  (clarification 24 stands)
- the other choices in clarifications 21-40 are approved

The default in the code is flipped, seven tests that assumed a stock from
2027 are redone, and the comparison with the independent reader's code is
rerun with its switch set the same way: same numbers in all 9 471 paths
that can be built. The parameter file is unchanged.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 12:14:28 +01:00
5c91cadf4c
feat(kode): add the build-out, the power system and the cash flow
- utbygging.py: when each facility starts and which vintages of IT hardware it
  gets (S22, S33), with chips as a stock, replacement before new facilities and
  the export rule.
- kraftsystem.py: the fitted price lines and the power and capacity balances
  year by year (S23, S24, S25, S38).
- kontantstrom.py: the yearly cash flows per facility, the additionality rule
  by iteration, the residual value and the net present value for Norway (S26,
  S34, S35, S40, S45), for the solutions A, B, B', C and R.
- hendelser.py and data/aarshendelser.npy: the stream of random numbers for the
  export rule, one uniform number per draw and year 2028-2100, from its own seed.
- inndata.py: one set of values in the units of the equations.
- ligninger.py: one function per equation for chapters 4 to 6.

Tested on a made-up set of values only (tests/conftest.py); no result for the
hypothesis has been computed. 271 tests pass. Seven are documented misses
against a source: the five from before, and the price lines for NO3 and NO4,
which miss one of NVE's twelve scenarios by 6.0 and 7.7 per cent.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 11:58:24 +01:00