Everything per module, renewable modules with their own portfolio, the nuclear
modules of T-K on shared units, S41 counted to the first unit. The factor of
S51 enters the revenue and the disconnection arm of S47. S53 and S54 are put
together over a programme for all solutions. Present values are exactly
rounded sums, so the same computation gives the same last digit every time.
The chapters after the cash flow refuse T and a loss of demand for now.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
utbyggingsplan_trinnvis follows chapter 17.1: the grid balance of the
first stage, the payment condition for a module's power plants, S49,
and in T-K the two stocks of chips and the queue for replacements.
tidslinje gives MW IT in operation per type of power (S50). S48-S54
are pure functions in ligninger.py, and Inndata carries the new
quantities, the scenarios for the loss of demand and the paths of
u_alt. lag_plan returns a Trinnvisplan for T-F and T-K; regn_program
refuses T until it is taken through the cash flow.
Tested on made-up numbers only (59 new tests, hand-computed build-outs).
Nothing is computed for the hypothesis.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The project owner answered the three questions from part 5b on 2026-11-12
("Ja til dine anbefalinger"), before any result is computed:
- chips are a stock from the solution's first possible operating year, not
from the decision year (clarification 25 rewritten; the old reading stays
as a switch that is not part of the verdicts)
- renewable power in C enters operation the same year as the facility
(clarification 24 stands)
- the other choices in clarifications 21-40 are approved
The default in the code is flipped, seven tests that assumed a stock from
2027 are redone, and the comparison with the independent reader's code is
rerun with its switch set the same way: same numbers in all 9 471 paths
that can be built. The parameter file is unchanged.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
- utbygging.py: when each facility starts and which vintages of IT hardware it
gets (S22, S33), with chips as a stock, replacement before new facilities and
the export rule.
- kraftsystem.py: the fitted price lines and the power and capacity balances
year by year (S23, S24, S25, S38).
- kontantstrom.py: the yearly cash flows per facility, the additionality rule
by iteration, the residual value and the net present value for Norway (S26,
S34, S35, S40, S45), for the solutions A, B, B', C and R.
- hendelser.py and data/aarshendelser.npy: the stream of random numbers for the
export rule, one uniform number per draw and year 2028-2100, from its own seed.
- inndata.py: one set of values in the units of the equations.
- ligninger.py: one function per equation for chapters 4 to 6.
Tested on a made-up set of values only (tests/conftest.py); no result for the
hypothesis has been computed. 271 tests pass. Seven are documented misses
against a source: the five from before, and the price lines for NO3 and NO4,
which miss one of NVE's twelve scenarios by 6.0 and 7.7 per cent.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>