Commit graph

2 commits

Author SHA1 Message Date
8d13501653
feat(kjoring): thresholds, the conditions of part I, Sobol indices and threshold surfaces
Clarifications 105 to 111, on invented outcomes and made-up draws only. The price
threshold runs the model with the price multiplied by a factor; the thresholds in
a quantity, the indices and two of the surfaces are read from the outcomes per draw.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 17:57:52 +01:00
fe2b2131f3
feat(dommer): five solutions in M5 and the verdicts, and three sensitivities of chapter 17.8 as switches
The ladder, part I and M7 now cover A, B, C, T-F and T-K: A is best when it
can be built and beats each of the four others that can. M5 holds by
definition for T-F and judges T-K as nuclear power on every step.

Switches for the sensitivities: full displacement in the first stage
(delta_V = 1 for the modules started within the grid that exists, in S11,
S23, S24, the grid investment and V), new renewable power counted from a
later year for C and T, and Inndata.med for modules of 50 and 200 MW. Next
to S54 the withdrawal with sea water only for the nuclear production the
data centres themselves use.

With the switches off every figure for all seven solutions is unchanged to
the last digit (267 made-up paths, 516 817 lines, byte for byte). Not yet
reconciled against the independent reader's code.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 13:41:29 +01:00