The project owner answered the three questions from part 5b on 2026-11-12
("Ja til dine anbefalinger"), before any result is computed:
- chips are a stock from the solution's first possible operating year, not
from the decision year (clarification 25 rewritten; the old reading stays
as a switch that is not part of the verdicts)
- renewable power in C enters operation the same year as the facility
(clarification 24 stands)
- the other choices in clarifications 21-40 are approved
The default in the code is flipped, seven tests that assumed a stock from
2027 are redone, and the comparison with the independent reader's code is
rerun with its switch set the same way: same numbers in all 9 471 paths
that can be built. The parameter file is unchanged.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
- utbygging.py: when each facility starts and which vintages of IT hardware it
gets (S22, S33), with chips as a stock, replacement before new facilities and
the export rule.
- kraftsystem.py: the fitted price lines and the power and capacity balances
year by year (S23, S24, S25, S38).
- kontantstrom.py: the yearly cash flows per facility, the additionality rule
by iteration, the residual value and the net present value for Norway (S26,
S34, S35, S40, S45), for the solutions A, B, B', C and R.
- hendelser.py and data/aarshendelser.npy: the stream of random numbers for the
export rule, one uniform number per draw and year 2028-2100, from its own seed.
- inndata.py: one set of values in the units of the equations.
- ligninger.py: one function per equation for chapters 4 to 6.
Tested on a made-up set of values only (tests/conftest.py); no result for the
hypothesis has been computed. 271 tests pass. Seven are documented misses
against a source: the five from before, and the price lines for NO3 and NO4,
which miss one of NVE's twelve scenarios by 6.0 and 7.7 per cent.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>