Six critics and six controllers read the report 2026-11-23 and raised 83
objections; none shows a measured number, an equation or the code to be
wrong. This commit writes the missing reservations where the reader meets
the number, and says what is not computed.
- Summary, two-page summary, chapters 1 and 10, README: what the test did
and did not try, what the 1.1 % share rests on, the interest rate, the
build pace, and the lesson on a dedicated nuclear plant as what the
comparison shows (no verdict, as the pre-registration says).
- Chapters 2 to 6: reservations at the numbers (shares are not
probabilities, the scenario is a choice, sensitivities one at a time).
- Chapters 8 and 9, appendix C: computations the critics asked for that
are not made, what "independent" means in the project, that the
pre-registration was not in a public register.
- Source bank area 28 (10 entries, after the results, feeding no
parameter): long leases, the largest compute deals, recent reactor
costs; cited in chapters 4, 7 and 8. K09-004 gets its NOU quote.
- PDFs rebuilt: report 164 pages, summary 2 pages.
Every change was read by a controller and the corrections entered; keys,
source entries and quotes were checked again by script. The carousel is
not changed in this commit.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The verbatim list of changes was the project's working log. The appendix now
shows what was changed, when, before or after the results, and the effect on
the test as each entry states it, and points to the full list in the
pre-registration. The generator for the verbatim list is removed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>