# Changelog All notable changes to this project will be documented in this file. ## Unreleased - Pre-registration of what is tested and what it takes for the hypothesis to hold (`FORHANDSREGISTRERING.md`). - Source bank: 948 entries in 21 areas, each checked against its primary source (`kilder/`). The second round (areas 13–21) covers the parameters that lacked a source when the model was specified. - Model specification, draft 3 (47 equations), after a pre-read of draft 2, two independent reviews of draft 3 and a control of the corrections (`modell/`). - Parameters frozen before anything is computed: 124 parameters in 2025 kroner, one distribution each, with the source entries they rest on (`modell/parametere.json`). The checksum is recorded in the pre-registration. No code and no results yet. - Eight clarifications of the pre-registered criteria, approved by the project owner after the parameter freeze and before anything is computed (`FORHANDSREGISTRERING.md`, «Presiseringer»). The parameter file is unchanged. - First code (`src/tokenfabrikker/`): one function per equation for the power plant, the data centre and the revenue (S1–S21, S36, S43–S47), a strict reader for the frozen parameter file with unit conversion, and the 10 000 Monte Carlo draws stored in `data/`. Python with pinned numpy and scipy, pytest, ruff `ALL` and mypy strict. No result for the hypothesis has been computed. - An independent reader coded the key equations from the specification alone. The two implementations agree on all 23 functions. The 19 ambiguities the reader found are settled in a new, dated chapter 16 of the specification (`modell/`); the parameter file and the pre-registration are unchanged. - Known-answer tests against Argonne, NOU 2026: 4, Epoch and NVE with the sources' own assumptions (`tests/test_fasit.py`). The misses are kept as documented expected failures: wind on land and offshore wind come out 5–6 % below NVE, and three rows of Argonne's table depend on a reading the source does not settle. - Build-out, power system and cash flow in code (`src/tokenfabrikker/`): when each facility starts and which vintages of IT hardware it gets (S22, S33), the export rule with its own stored stream of random numbers (`data/aarshendelser.npy`), the fitted price lines and the power and capacity balances (S23–S25, S38), and the yearly cash flows with residual value, the additionality rule and net present value for Norway (S26, S34, S35, S40, S45). Tested on made-up numbers only; no result for the hypothesis has been computed. - A second independent reader coded these equations from the specification alone and found 28 ambiguities. They are settled in clarifications 21–40 in chapter 16 of the specification. With the readings aligned, the two implementations agree on 10 000 made-up build-out paths. The clarifications that are choices are marked and put to the project owner (`modell/fagfellevurdering-utkast-2-og-3.md`, part 5). - The price lines of S38 are held against NVE's twelve scenarios: within 5 % for Norway and three price areas, 6.0 % and 7.7 % off in one scenario for NO3 and NO4, kept as documented expected failures.