tokenfabrikker/pdf/Tokenfabrikker.pdf
Kjell Tore Guttormsen 16aefee608
docs: clarifications 144 to 149, the plan for the additional analyses
Written and committed before any of them is coded or computed, as the
project owner approved 2026-11-23. Clarification 144 holds the frame: what
an additional analysis is, the rule for the order, that everything started
is reported, what was known beforehand, and all fifteen with a decision.
145 to 148 fix the four that are done now on the frozen numbers (expected
net present value, half the construction time for small units with the
free choice of unit size, no displacement in the grid queue, net present
value by term), and 149 how they are run, checked and stored in
data/tillegg/. Row in appendix C, dated entry in the pre-registration,
report rebuilt (172 pages).

No verdict, threshold, parameter, draw or result file changes.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 21:21:32 +01:00

1.4 MiB