The conclusion, measures 2 and 3 and the status sentence are approved (the operator, 2026-11-14). Measure 3
now says «not a dedicated nuclear plant», which is what the 0.1 % measures, for one facility. The form was
opened in a browser: a text field without a link button or a stated length limit, and up to ten PDF
attachments of 10 MB each, which must be accessible PDFs.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>