Six critics and six controllers read the report 2026-11-23 and raised 83 objections; none shows a measured number, an equation or the code to be wrong. This commit writes the missing reservations where the reader meets the number, and says what is not computed. - Summary, two-page summary, chapters 1 and 10, README: what the test did and did not try, what the 1.1 % share rests on, the interest rate, the build pace, and the lesson on a dedicated nuclear plant as what the comparison shows (no verdict, as the pre-registration says). - Chapters 2 to 6: reservations at the numbers (shares are not probabilities, the scenario is a choice, sensitivities one at a time). - Chapters 8 and 9, appendix C: computations the critics asked for that are not made, what "independent" means in the project, that the pre-registration was not in a public register. - Source bank area 28 (10 entries, after the results, feeding no parameter): long leases, the largest compute deals, recent reactor costs; cited in chapters 4, 7 and 8. K09-004 gets its NOU quote. - PDFs rebuilt: report 164 pages, summary 2 pages. Every change was read by a controller and the corrections entered; keys, source entries and quotes were checked again by script. The carousel is not changed in this commit. Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
202 KiB
202 KiB