fix(gate): part 2 verifier findings — non-object findings, carried backed copy, rule_keys, marks, approval prose, brief_path, engine put-back once

1. plan-review-dedup skips only a null or undefined finding; any other
   entry that is not an object (a string, a number, an array) goes on as
   before E, a finding with no valid severity that the plan gate counts as
   a blocker (it was dropped, so a string blocker recorded PASS).
2. plan-gate --record: a previous finding that rule A carried as counted and
   whose id is backed this round leaves the counted set, the counts, the
   verdict and the stop rule's summary (it was counted and listed in
   known_outside at once: BLOCK, not-fewer, and --accept-open refused).
3. A known_outside entry keeps rule_keys; extractVerdict accepts it (a list
   of strings), and the bare gate re-checks with the same keys the recorder
   used, so a merged finding whose security key is only in rule_keys is a
   WARN, not a STOP.
4. plan-critic, scope-guardian and /trekplan Phase 9's round-2 sentences say
   the Critic Verdict also lists known_outside and each is marked by id in
   previous. Code already accepts such a mark (dedup passes it; countRound
   ignores ids it does not carry; --record removes the entry on true);
   pinned in diff mode and full count.
5. The approval prose names ## Threat Model where it named only ## Intent +
   ## Goal: skills/annotating/SKILL.md (description, step 4, guard list),
   docs/command-modes.md, Handover 1's intent_approved_hash row, README
   (approval, Approve row, intent approval gate) and CLAUDE.md's /trekbrief
   row.
6. threat-model.mjs gains usableInRepo (a brief path relative to the repo
   top level) and repoRelativeBrief; --record stores brief_path relative to
   the top level, never absolute, and both gates read it from there, so the
   gate run from a subdirectory reads the same brief. reviewThreatModel
   uses usableInRepo. Handover 4 and the gate header say so.
7. review-finalize's outside pass puts an entry back only when no finding
   carries its row yet (engine-compare rowOf): an engine finding listed in
   known_outside while its payload is saved went back twice.
8. A test runs scripts/release-check.mjs on a review whose known_outside
   entry the brief does not back: exit 2 (control: backed passes the review
   check).

Existing tests changed: plan-gate-threat-model's entry-keys assertion now
expects rule_keys (item 3), and its planted non-security entry drops the
security key from rule_keys too, since the gate reads rule_keys (item 3).

Part 2 fix round of the E plan.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
Kjell Tore Guttormsen 2026-11-08 10:50:20 +01:00
commit 1be961aab1
Signed by: ktg
SSH key fingerprint: SHA256:JakMjO6FTBBzN0Bhfj9saOoEjaFxlSdYuZQQpM/lF9Q
17 changed files with 298 additions and 52 deletions

View file

@ -9,7 +9,7 @@ Per-command flag tables, imported from `CLAUDE.md` via pointer.
| _(default)_ | Question round sized by class (`small` / `bounded` / `architectural`), brief-review gate, approval → brief.md with research plan |
| `--quick` | Proposes `small` as the class (still said aloud, overridable, raised when the task proves bigger) → brief.md with research plan |
| `--gates [true\|false\|closed\|open]` | (v3.4.0) Autonomy flag: bare, `true` or `closed` = on; `false` or `open` = off; any other next token is not its value. See `## Autonomy mode` in `docs/operations.md`. |
| `--approve <project-dir \| brief-file>` | (veikart steg 1) No interview: show the existing brief's `## Intent` + `## Goal` verbatim, ask the operator to approve, and on "Approve" stamp `intent_approved_hash` + `intent_approved_at`. The remedy `/trekplan` names when it halts on `BRIEF_INTENT_NOT_APPROVED` / `BRIEF_INTENT_APPROVAL_STALE`. |
| `--approve <project-dir \| brief-file>` | (veikart steg 1) No interview: show the existing brief's `## Intent` + `## Goal` (+ `## Threat Model` when present) verbatim, ask the operator to approve, and on "Approve" stamp `intent_approved_hash` + `intent_approved_at`. The remedy `/trekplan` names when it halts on `BRIEF_INTENT_NOT_APPROVED` / `BRIEF_INTENT_APPROVAL_STALE`. |
Always interactive. Phase 3 puts the task in a size class (`ceremony:`, K1; heaviest in doubt, said aloud, overridable, only moved up) and asks one round of questions within the class budget (`small` 4, `bounded` 8, `architectural` 12 per round), recommendation first, facts looked up instead of asked, a visible Deferred list; it also asks where the brief is stored (`artifact_store: git | local`). Phase 4 runs a `brief-reviewer` stop-gate with 1 / 2 / 3 review iterations by class. Phase 4h takes only an explicit "Approve" («høres bra ut» and an empty answer are refused by `lib/util/approval-log.mjs answer`), stamps the brief, appends the approval to the target repo's log (`approval-log.mjs append`, K2) and commits it (`lib/util/artifact-commit.mjs`: the log always, the brief when `git`). After that, asks the user to choose manual (print commands) or auto (Claude runs research + plan in foreground).