docs(t1): record the operator's decline of the section 5 head-to-head
The delegated-orchestration bake-off (T1 section 5) was specified in June and never run, and nothing said whether it should be. The operator declined it on 2026-09-18, so section 5 now carries a STATUS block in the same form section 6 got when its PoC was run and declined. Why it is a decline and not a postponement: the measurement's positive branch is "adopt delegated orchestration", which the balance analysis lists under Explicitly NOT recommended (CC-26 lean-NO). Running it would have reopened a settled decision without saying so. The end-state direction chosen 2026-09-17 is to finish and freeze the present form. The cheaper synthetic instrument proposed alongside it is not run either. Nothing is rewritten: the design stays as the record of what was specified, and reviving it is a new operator decision. This is the same mechanism the end-state gate measures, so the experiment closes by the decision being written down rather than by code changing. End-state gate E-03: open -> closed. Experiments 3 -> 2 of 3 (STORM and the deep-research opt-in remain). Registry integrity intact. Suite 1081 (1079/0/2), run on a clean export of the index. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
This commit is contained in:
parent
e1d4425053
commit
8d1669ef51
1 changed files with 9 additions and 0 deletions
|
|
@ -98,6 +98,15 @@ proliferation." Two consequences for the delegated arm specifically:
|
|||
|
||||
## 5. Measurement design — the full head-to-head (specified, ready to run)
|
||||
|
||||
> **STATUS: DECLINED (operator, 2026-09-18) — do not order this measurement as new work.**
|
||||
> It is **not run**, and the cheaper synthetic instrument proposed for it is not run either.
|
||||
> Reason: the measurement's POSITIVE branch is "adopt delegated orchestration", which the
|
||||
> balance analysis lists under *Explicitly NOT recommended* (CC-26 lean-NO). Running it
|
||||
> reopens a settled decision without declaring that it does. The end-state direction chosen
|
||||
> 2026-09-17 is to finish and freeze the present form, not to re-litigate the substrate.
|
||||
> The design below stands as the record of what was specified; reviving it is a new operator
|
||||
> decision, not maintenance.
|
||||
|
||||
If the operator greenlights pursuing delegation (see §7), this is the measurement that resolves the
|
||||