fix(execute): the completion gate says which checks are commands and which are executor judgement
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
parent
2fe6feb74d
commit
a9f5f6251a
3 changed files with 60 additions and 8 deletions
|
|
@ -2410,7 +2410,7 @@ Record in progress file:
|
|||
> 1. **Objective predicate** — the **Phase 7.5** manifest audit (above) PASSED,
|
||||
> re-verified directly from the filesystem + git log, ignoring the executor's
|
||||
> own per-step bookkeeping. "The audit wins"; a self-reported `completed` over
|
||||
> a drifting audit is OVERRIDDEN to `partial` (Phase 7.5, `:1221`).
|
||||
> a drifting audit is OVERRIDDEN to `partial` (Phase 7.5).
|
||||
> 2. **Explicit stop-signal** — a signal *distinct from the executor's
|
||||
> self-assessment* is satisfied: the plan's Verify command(s) **passed (exit
|
||||
> 0)** / lint clean / an explicit **DONE token emitted AFTER the Phase 7.5
|
||||
|
|
@ -2421,14 +2421,14 @@ Record in progress file:
|
|||
> from `lib/verification/criteria-runner.mjs`, on the single-session path as
|
||||
> well as the multi-session one. `"failed"` or `"not-run"` OVERRIDES
|
||||
> `completed` to `failed`, exactly as the audit-override does.
|
||||
> 3. **Counter liveness (deterministic, defeats "never decremented")** — the gate
|
||||
> reconciles the budget counter against the ground-truth counters the Phase 7.5
|
||||
> audit already derives:
|
||||
> 3. **Counter liveness (checked by the executor against the audit's counts,
|
||||
> defeats "never decremented")** — the gate reconciles the budget counter
|
||||
> against the ground-truth counters the Phase 7.5 audit already derives:
|
||||
> `iterations_remaining == TREKEXECUTE_MAX_RECOVERY_ITERATIONS − (recovery_depth + Σ steps.*.attempts-beyond-first + (review.round − 1))`
|
||||
> (the last term is 0 without a review; each review loop of Phase 7.2 takes 1).
|
||||
> A field left un-decremented (or tampered) fails this reconciliation and the
|
||||
> result is OVERRIDDEN `completed → partial`, exactly as the audit-override
|
||||
> already does (`:1221`). So the counter's liveness is auditable at the gate,
|
||||
> already does (Phase 7.5). So the counter's liveness is auditable at the gate,
|
||||
> not merely asserted in prose.
|
||||
> 4. **End to end** — for a trekplan, Phase 7's `end_to_end == "verified"`.
|
||||
> `"not-verified"` OVERRIDES `completed → partial` with the reason
|
||||
|
|
@ -2439,12 +2439,19 @@ Record in progress file:
|
|||
> the files outside the plan. `"not-measured"` does not override, and it is
|
||||
> never reported as a pass.
|
||||
>
|
||||
> **Commands:** Phase 7.5 step 3's `git rev-list --count`, step 5's `bash -n`,
|
||||
> step 6's `git diff --name-only` and step 7's `done-line.mjs --check`; the
|
||||
> criteria runner behind clauses 2 and 4; clause 5's `arch-rules.mjs` and
|
||||
> `plan-scope-sweep.mjs`. **Executor judgement:** steps 1, 2 and 4, the expected
|
||||
> count in step 3, and clause 3's formula. A script for the judgement parts is
|
||||
> part c of the hardening.
|
||||
>
|
||||
> The review verdict (Phase 7.2) is decided after this gate, by the lock in
|
||||
> Phase 8: in the closing run, a closed lock or a declined merge turns
|
||||
> `completed` into `partial`, as a declined gate always has.
|
||||
>
|
||||
> Termination authority therefore rests on the deterministic audit + an
|
||||
> objective stop-signal, never on the model's narrative. Native `/goal` (when
|
||||
> Termination authority therefore rests on the audit and an objective
|
||||
> stop-signal, never on the model's narrative. Native `/goal` (when
|
||||
> capability-probed and wired) is an OPTIONAL accelerator only: transcript-only,
|
||||
> it cannot run the real check, so it can never be the sole gate.
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue