chore(release): 5.11.0 — the intent approval gate is a new capability
Version 5.11.0 in every file that carries it: .claude-plugin/plugin.json, package.json, package-lock.json (both entries; they said 5.10.0, drift from before 5.10.1), the README badge, and a CHANGELOG entry for everything since v5.10.1. Chose a minor bump because /trekplan gains a halt (a new capability, additive schema). Handover 1 changes for downstream producers: their briefs stop at /trekplan until approved. No tag and no catalog bump here: release-plugin.mjs runs in the operator's push round. Suite after git add: 1234 tests, 1232 pass / 0 fail / 2 skip in 2 of 3 runs. The third failed only the known timing test otel SC #14 tail-latency (877 ms against an 800 ms ceiling), which this order leaves alone. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
parent
e7687650c4
commit
ea66a98c60
5 changed files with 68 additions and 5 deletions
|
|
@ -2,7 +2,7 @@
|
|||
|
||||
Contract-driven Claude Code pipeline: brief, research, plan, execute, review. Agent swarms, research triangulation, adversarial review, multi-session resumption.
|
||||
|
||||

|
||||

|
||||

|
||||

|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue