chore(release): 5.11.0 — the intent approval gate is a new capability
Version 5.11.0 in every file that carries it: .claude-plugin/plugin.json, package.json, package-lock.json (both entries; they said 5.10.0, drift from before 5.10.1), the README badge, and a CHANGELOG entry for everything since v5.10.1. Chose a minor bump because /trekplan gains a halt (a new capability, additive schema). Handover 1 changes for downstream producers: their briefs stop at /trekplan until approved. No tag and no catalog bump here: release-plugin.mjs runs in the operator's push round. Suite after git add: 1234 tests, 1232 pass / 0 fail / 2 skip in 2 of 3 runs. The third failed only the known timing test otel SC #14 tail-latency (877 ms against an 800 ms ceiling), which this order leaves alone. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
parent
e7687650c4
commit
ea66a98c60
5 changed files with 68 additions and 5 deletions
|
|
@ -1,6 +1,6 @@
|
|||
{
|
||||
"name": "voyage",
|
||||
"version": "5.10.1",
|
||||
"version": "5.11.0",
|
||||
"private": true,
|
||||
"description": "Voyage — brief, research, plan, execute, review, continue. Contract-driven Claude Code pipeline. /trekbrief, /trekplan, and /trekreview each end by building a self-contained operator-annotation HTML (scripts/annotate.mjs, modelled on claude-code-100x): select text or click any heading/paragraph/list-item, pick intent (Fiks/Endre/Spørsmål), write comment, copy structured prompt, paste back, Claude revises the .md.",
|
||||
"type": "module",
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue