R8 of cleanup R-a (plan .claude/projects/2026-11-07-cleanup-r-a, appendix A).
The live tests of the round files move into the test named after their
source; each moved test was seen red under a mutation of its source.
New: tests/lib/lib-imports.test.mjs, tests/lib/timing.test.mjs (from
timing-under-load). The [#1] --gates rule and shim-line pins move into
tests/lib/autonomy-gate.test.mjs.
Removed: the round test files (retterunde, retterunde-prose-pins,
trial-mechanical-fixes, trial2-fixes, trial2-minor, trial2-minor-prose-pins,
fix-round-4-5a-prose, fix-round-4-5b2-b-prose, timing-under-load), the 8 R8
e2e scripts, and seven round test files on the R-a removal list that pinned
them (fix-round-4-5b-prose, fix-round-4-5b-part-2/3/4-scripts,
fix-round-4-5b-part-4-prose, fix-round-4-5b2-b/c-scripts). The diff-mode e2e
pin (test 24) and the red-script round-wrapper cases go too.
tests/synthetic/plan-run-C.md becomes tests/fixtures/plan-run-c.md,
regenerated from buildPlan({ version: '1.9' }). The red judge, reporter and
judge test headers now name the shared red script.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Wave 1, order 3 (P3 plan mode as the start, P2 design as its own part, P9
plan side). Contracts K3-K6 for the later merges.
- plan_version 1.8 (1.7 plans stay valid): Test first on every step, one
End-to-end ("run the thing") step, optional Interface in / Interface out /
Review focus fields, a ceremony class in the header (absent =
architectural), and for architectural plans a ## Design part: module map
without cycles, architecture rules that name their enforcer and the step
that proves them, a requirements check asked as keep / change.
- K3 lib/validators/plan-gate.mjs: the critic verdict is recorded INSIDE the
plan (Claude Code's plan approval hands a hook only the plan file's text),
bound to the hash taken before the reviewers read it; 0 go / 1 stop / 2
could not run; at most 3 critic rounds, then stop and ask.
- K5 lib/verification/arch-rules.mjs: runs the target repo's own
dependency-cruiser or import-linter (installs nothing; 2 = not measured,
never green); --prove --rule shows pass -> fail on a planted violation of
that rule -> pass. Verified against dependency-cruiser 18.5.0 and
import-linter 2.15; madge 8.0.0 left out (missed a planted .mjs cycle).
- K6 lib/verification/plan-scope-sweep.mjs: changed files no step names.
- /trekplan Phases 8-10: design part, bounded critic loop, the gate before
"execute", a plan-mode path through ExitPlanMode (not yet run end to end
inside plan mode). plan-critic 10 -> 12 dimensions; scope-guardian checks
the ceremony.
- Fixed on the way: plan-validator and plan-review-dedup used the
file://argv[1] main guard (no-op under a symlink or a space); CRLF plans
failed every manifest; the dedup dropped finding severity.
Borrowed, credited in place: obra/superpowers, Kiro (docs), addyosmani/
agent-skills, mattpocock/skills, GitHub Spec Kit, bashebr/ai-native-sdlc,
Boris Cherny's public threads.
Suite 1497 (1495 / 0 / 2), 86 new tests.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>