voyage/lib
Kjell Tore Guttormsen 255b6b4bf8
feat(trekplan): Regression and On failure step rules, and trial 2's minor fixes
The minor points (B8-B12, C13, C14, C16, C17) of the second voyage-lekerepo
trial (2026-10-08), each verified against the code and started with a test
that failed first.

- K10: optional step field `Regression:` - one command the criteria runner
  allows, unpiped; plan-validator refuses one that can never run
  (PLAN_STEP_REGRESSION_NOT_RUNNABLE). Any plan_version, no bump.
- K11: `On failure:` opens with revert | retry | skip | escalate, or the
  validator warns (PLAN_STEP_ON_FAILURE_UNKNOWN); onFailureAction in
  plan-schema.
- B8 (operator decision 2026-10-08): minors open after the last critic round
  are listed numbered in the Phase 10 summary; the ones the operator picks are
  fixed and get one more round (--extra-round when the 3 are spent).
- B11: plan-review dedup merges two reviewers' findings on the same file:line
  with the same content (trial pair: Jaccard 0.44, overlap 0.83); the Jaccard
  threshold for every other pair is unchanged.
- B12: /trekbrief Step 4c says the reviewer runs in the background and is
  waited for, not "foreground, blocking".
- C13: the Phase 4 size count includes .mjs, .cjs, .mts, .cts.
- C14: --evidence shows the first output line on PASS rows.
- C16: findings-schema checks path:line citations in finding prose (error) and
  in the prose around the block (warning) against the file.
- C17: git-historian gets the brief, never proposes changing a frozen file,
  and names the remote from `git remote -v`.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-08 21:42:21 +02:00
..
exporters fix(docs): the order fields stand on all five surfaces (green) 2026-10-04 19:55:17 +02:00
parsers feat(trekplan): Regression and On failure step rules, and trial 2's minor fixes 2026-10-08 21:42:21 +02:00
plan feat(voyage): S12 — NW3 synthesis-agent built + measured → declined per measurement [skip-docs] 2026-06-18 17:58:39 +02:00
profiles feat(profiles): add built-in fable profile (all six phases on fable) 2026-07-02 16:59:26 +02:00
review feat(trekplan): Regression and On failure step rules, and trial 2's minor fixes 2026-10-08 21:42:21 +02:00
stats fix(execute): the Phase 8 payload goes on stdin; /trekreview findings closed 2026-10-05 18:16:46 +02:00
util fix: close the six defects an independent review found in the trial fixes 2026-10-08 07:17:45 +02:00
validators feat(trekplan): Regression and On failure step rules, and trial 2's minor fixes 2026-10-08 21:42:21 +02:00
verification feat(trekplan): Regression and On failure step rules, and trial 2's minor fixes 2026-10-08 21:42:21 +02:00