voyage/lib
Kjell Tore Guttormsen 393b8e5a0a
fix(guards): a step whose test is seen green may stop while it waits for its controller
voyage-lekerepo trial (2026-10-06) point 7, operator decision 2026-10-08
(«grønt merke på låsen»): the stop guard blocked Stop three times while the
executor waited for the controller, with the step's test already green.

- test-lock.mjs green --cmd "<Verify>" runs the step's test command (same
  allowlist + denylist as done-line) and records green_at only on exit 0;
  pending clears it; a new lock starts without it.
- stop-test-lock lets a green-marked lock stop; the write guard still
  refuses the locked test files.
- trekexecute: D1 marks green after a PASS; each fix round marks pending.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-08 06:59:14 +02:00
..
exporters fix(docs): the order fields stand on all five surfaces (green) 2026-10-04 19:55:17 +02:00
parsers feat(plan): plan 1.8, the plan gate, the design part and the plan-side checks 2026-10-06 20:10:57 +02:00
plan feat(voyage): S12 — NW3 synthesis-agent built + measured → declined per measurement [skip-docs] 2026-06-18 17:58:39 +02:00
profiles feat(profiles): add built-in fable profile (all six phases on fable) 2026-07-02 16:59:26 +02:00
review fix(review): the review keeps the findings that are right 2026-10-08 06:48:13 +02:00
stats fix(execute): the Phase 8 payload goes on stdin; /trekreview findings closed 2026-10-05 18:16:46 +02:00
util fix(guards): a step whose test is seen green may stop while it waits for its controller 2026-10-08 06:59:14 +02:00
validators fix(validate): a check that can never run is caught when the brief or plan is written 2026-10-08 06:42:33 +02:00
verification fix: the trial's mechanical faults -- approval label, import path, stats, annotate path, red kind 2026-10-08 06:53:15 +02:00