voyage/docs
Kjell Tore Guttormsen 9fb536e2d8 feat(voyage): S11 — NW2 part B, integrate opt-in --workflow flag
Make the bake-off-validated Workflow substrate (Arm B) reachable behind an
opt-in --workflow flag for /trekreview. Default Phase 5-6 path stays prose
to preserve the lower portability floor; --workflow raises the consumer
floor to Claude Code 2.1.154+ (the Workflow tool).

- arg-parser: --workflow added to trekreview boolean flags
- commands/trekreview.md: flag row + Phase 5 substrate-routing gate +
  new section 'Phase 5-6 via the Workflow substrate' (invocation contract,
  S10 gotchas, bake-off citation, auto/bypass residual as Known limitation)
- docs/command-modes.md: --workflow row in /trekreview table
- routes to existing scripts/trekreview-armB.workflow.mjs (byte-identical to
  the S10 part-B POSITIVE build); integration is pure routing, no script change

TDD: 8 new tests (arg-parser flag recognition + combine; command/doc prose
pins for route, opt-in posture, 2.1.154+ floor, bake-off evidence).
Suite 662 -> 670 (668 pass / 2 skip / 0 fail). plugin validate clean modulo
known root-CLAUDE.md warning. Resolves W1-narrow-wins-plan.md S11.
2026-06-18 17:22:09 +02:00
..
architecture.md chore: WIP marketplace doc adjustments across plugins 2026-05-18 12:04:02 +02:00
cc-upgrade-2.1.181-decision-matrix.md docs(voyage): S8 (W1/CC-27 gate) — T2 Workflow-substrate probe + measurement design 2026-06-18 13:34:05 +02:00
command-modes.md feat(voyage): S11 — NW2 part B, integrate opt-in --workflow flag 2026-06-18 17:22:09 +02:00
HANDOVER-CONTRACTS.md feat(voyage): S6 — v5.5 brief framing enforcement (brief_version 2.2) 2026-06-18 13:09:50 +02:00
observability.md docs(voyage): add docs/observability.md — operator quickstart for v4.1 OTel export 2026-05-09 09:51:44 +02:00
operations.md chore: WIP marketplace doc adjustments across plugins 2026-05-18 12:04:02 +02:00
profiles.md feat(voyage): W2 impl (S4) — gate resolver model, adopt native effort:, doc-truth 2026-06-18 12:27:07 +02:00
subagent-delegation-audit.md feat(voyage)!: bulk content rewrite ultra -> voyage/trek prose [skip-docs] 2026-05-05 15:08:20 +02:00
T1-cc26-delegated-orchestration.md docs(voyage): S7 (W1/CC-26 gate) — T1 feasibility probe + measurement design 2026-06-18 13:21:09 +02:00
T2-bakeoff-results.md feat(voyage): S10 part B — NW2 full bake-off (rich fixture) → verdict POSITIVE 2026-06-18 15:44:24 +02:00
T2-cc27-workflow-substrate.md docs(voyage): S8 (W1/CC-27 gate) — T2 Workflow-substrate probe + measurement design 2026-06-18 13:34:05 +02:00
W1-narrow-wins-plan.md docs(voyage): plan W1 narrow-wins implementation (NW1/NW2/NW3, S9->) 2026-06-18 13:41:20 +02:00