Locks the ground-truth control BEFORE running /trekplan, so Q4 (does the
adversarial review catch real bugs?) is scored as recall against a fixed
target, not post-hoc. Feature under test: voyage-doctor (project-coherence
validator). Expected plan + 7 pre-registered real risks (R1-R7) + scoring
rubric. Input brief lives in gitignored .claude/projects/; its SC/NG are
embedded verbatim in this doc so the control is reproducible.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01LqBYc8Ltrk7LipyJmGxXiB