test(ms-ai-architect): playground v3 markdown fixtures (17 commands) [skip-docs]
Synthetic markdown fixtures for the 17 report-producing commands per the canonical archetype-routing-tabell. Each fixture uses the consistent ANPR-trafikkanalyse system from brief example to produce parser-input that exercises every archetype path (aiact, requirements-list, text-document, fria, conformity-checklist, matrix-risk 5x5, matrix-risk-6x5, findings, cost-distribution, capability, phased-plan, markdown, verdict, comparison). Real /architect:<command> capture deferred to incremental work; synthetic fixtures suffice as parser test input for Steps 11-12.
This commit is contained in:
parent
3750bee48b
commit
b4a5ff0c75
17 changed files with 744 additions and 0 deletions
41
plugins/ms-ai-architect/playground/test-fixtures/summary.md
Normal file
41
plugins/ms-ai-architect/playground/test-fixtures/summary.md
Normal file
|
|
@ -0,0 +1,41 @@
|
|||
# Beslutningsnotat — ANPR-trafikkanalyse
|
||||
|
||||
System: ANPR-trafikkanalyse (Statens vegvesen)
|
||||
Dato: 2026-04-30
|
||||
Til: Direktør for Digital og IT
|
||||
Fra: KI-seksjonen
|
||||
|
||||
## Verdict
|
||||
|
||||
Verdict: warning
|
||||
Sub: Pilot anbefalt med betingelser
|
||||
|
||||
## Rationale
|
||||
|
||||
Arkitekturen er teknisk solid og økonomisk forsvarlig (P50 NOK 1.7M/år), men compliance-arbeidet ligger 6 måneder bak ideell tidslinje. Pilot kan starte etter at FRIA og transparens-instruksjoner er ferdigstilt; full produksjonssetting krever lukking av alle critical funn fra arkitekturgjennomgang.
|
||||
|
||||
## Key Metrics
|
||||
|
||||
| Metric | Verdi | Mål |
|
||||
|--------|-------|-----|
|
||||
| Compliance-dekning | 33% (4/12 fullt møtt) | 100% innen 2027-08-02 |
|
||||
| Sikkerhetsscore | 22/30 (73%) | ≥27/30 (90%) |
|
||||
| TCO 3 år | NOK 6.7M | ≤ NOK 7M |
|
||||
| Saksbehandlingstid (pilot) | -32% (estimert) | -40% |
|
||||
| ROS-restrisiko | medium | low-medium |
|
||||
|
||||
## Next Steps
|
||||
|
||||
- Lukk F-01 (ABAC) innen 2026-06-15
|
||||
- Gjennomfør FRIA innen 2026-07-15 (Art. 27-frist)
|
||||
- Produksjonsdokumentere transparens-instruksjoner innen 2026-09-01
|
||||
- Pilot 3 regioner (Oslo, Bergen, Trondheim) Q4 2026
|
||||
- Full utrulling Q2 2027
|
||||
|
||||
## Restrisiko
|
||||
|
||||
Etter foreslåtte tiltak: medium. Hovedeksponering: bias mot utenlandske kjennemerker krever løpende monitoring.
|
||||
|
||||
## Anbefaling
|
||||
|
||||
Godkjenn pilot-fase med tydelig stage-gate til full produksjonssetting. Avstem med Datatilsynet før fase 4.
|
||||
Loading…
Add table
Add a link
Reference in a new issue